UNION CARBIDE CORPORATION ___________________________________________ .
Specialty Chemicals Division
Sistersville, WV
MEMORANDUM TO: U. C. Nycz
COPY TO:
c. A. Gorrell
J. K. Kyle N. C. Nil sen
W. V. Summers
DATE: January 11, 1980
SUBJECT: Three Year Plant Insulation Upgrade Program
Insulation included in this program should qualify under one or more of the following criteria:
1. Insulation and/or equipment is obsolete or abandoned.
2. Insulation is of environmental concern.
3. Insulation is in serious need of repair or replacement.
4. Insulation is asbestos that is in an area of high mechanical disturbance.
Job scheduling will have to give consideration to weather, equipment availability and job grouping for contractual purposes. Tentative schedules for first, second and third years are attached. Some jobs from first year will most assuredly have to be slipped into second year etc. This contractor will possibly be used on demolition projects.
All asbestos insulation in the area of work will be labeled if it is not removed. This is to be done in such a manner that all remaining asbestos in the plant will be labeled by the end of this program.
KBP/rah Attachments
K. B. Purinton
UCC 007140
FIRST YEAR
Job Description *T-4, strip insulation oBasement of Bldg. #1 Warehouse Steam Lines *T-228, 559, 463 & 311 Lines W. of Poly I Drum Lines from Bldg. 21 to K-17 *#1 Boiler w/2Tks & Pipe *Abandon Thermo Line (2251) Lines from T-279 to 496 Lines from Poly II N. 0Lines in Tk Farm N. 8" Mill
Lines in Capper Prod. Area Asbestos in Bldg. #43 IT-201, 215 & 226 Strip
Est. Cost of Stripping 17,000 36,000 20,000 30,000 12,000
9,000 45,500
6,000 10,000 27,000 14,000 50,000 39,000 20,000
Est. Time
Est. Reinsul.
2 Wks. None
4 Wks. 37,300
4 Wks. 26,900
1 Wk/TK 54,000
2 Wks.
1 Wk.
4 Wks.
1 Wk.
None
2 Wks.
3 Wks.
2 Wks. ?
2 Wks. 3 Wks.
None
*Is hard dollar bid Can be hard dollar on a per full bases I Can be hard dollar bid
Date Available
A/T A/T 3/15/88 Spring 4/15/88
Fall
To Be Scheduled To Be Scheduled
UCC 007141
SECOND YEAR
Job Description
Jobs not completed 1st year
Misc. Tanks in Poly II Tank Farms
CNT Tanks Tank Farm 5 Monomers
#2 Graver Tank
#3 Boiler
Asbestos Lines Under and In Poly II Kettle House
All Filter Area Tanks Poly I
All Lines in Poly I Kettle House including K-56 Area
Asbestos in Pipetrail from Poly I Area to Cyclic Area
Est. Cost of Stripping
Est. Time
Est. Reinsul.
Date Available
UCC 007142
Job Description
Jobs not completed 1st and 2nd year
THIRD YEAR
Est. Cost of Stripping
Est. Time
Est. Reinsul.
Date Available
UCC 007143