Document 5D09qr25yqkjJ2nVJbpRJ3r85

GEORGIA-PACIFIC INTERDEPARTMENTAL COMMUNICATION T<* FROM: Mr. E. B. Hollingsworth Rauch SUBJECT: q.s<h#a. Citation of June 13, 1973 l PLAINTIFFS EXHIBIT GP-248 DATE: July 9# 1973 LOCATION: Wilmington LOCATION: Akron On July 5, 1973, Mr. R. G. Tuttle and I had an informal conference In the office of Mr. Alfred Barden, Assistant Regional Director, O.S.H.A. This conference was held at our request to gain a proper understanding of the abatement procedures of the various citations, and to request a reduction or removal of the various proposed penalty assesaents. This informal meeting was rather lengthy, from 9:00 A.M. to nearly 3:30 P.M. and was concluded with some degree of success. Those in the conference for O.S.H.A. were: Mr. Barden, Assistant Regional Director: Mr. John Kearney, Technical Support Director; Mr. Harold Pauly, O.S.H.A. Inspector from the Syracuse office. Each citation was discussed at length and ended with our formal written request for a 30 day extension on all citations and a request that serious violations #2 and #3 be reduced to non-serlous violations with the proposed penalties being changed from $1600.00 to $180.00 on these two violations. In s formal reply, Mr.` Barden agreeded to our requests and will re issue a revised citation indicating these changes. Our total proposed penalty will now be $1340.00 from the original total of $2760.00. We should issue a check in the amount of $1340.00 to Mr. Barden's office as our first step in this matter. We have agreed to the completion of following by July 31, 1973. I. Establish a complete respirator program which will include: Instruct all employees in the proper use and care yof approved respirators. This instruction to be given by a qualified instructor/^ Ota Provide individual lockers for storage of respirators for each employee. & Provide a regular inspection program to check on condition of respirators In use and replace any found defective, /\ worn, or in an unsanitary condition. D. Have assurance that all employees are using respirators where required with an established and working enforcement program. II. Establish a program for maintaining the area in clean, orderly and san^^y condition as follows: Clean the inside area of accumulation of dust from tank tops, support beams, walls, etc. where asbestos dust may fall through the air at a later date. Install portable dust collection on the bag packer * to reduce asbestos contamination in the Remove the portable fan from Che bag packer. * Replace our present air-flow bag packer with a non pressure type bag packer. Enclose the bag slitter area to Increase the effectiveness of the present dust collection system. Use plastic bags with proper warning lables to dispose of all waste asbestos. IliyVnrovide employees with protective clothing that provide total heed / to toe protection..^ yt We must provide a single change room with individual lockers, one for the provided work clothes and one for their street clothes. Vi We must either provide disposable clothing or have jy provisions for their cleaning on a regular basis. fh Enforce the use of protective clothing by all who enter / the area. ^f\ Establish a personal monitoring program of all employees to determine exposure. To be at a minimum of 6 month intervals. p Further we must have medical chcck-up on all area / employees Including full X-rays and respiratorytests. To be at a minimum of 12 month intervals. Provide, by July 27,1973, a plan and time Cable for Installation of engineering controls to prevent employee exposure to asbestos dust. We have completed all of the other requirements as outlined in the O.b.k.A. Multi-Step Abatement Procedures , sue:. a-: 1. Provide all employees with approved respirators. 2. Post caution signs at all approaches to the area. 3. Affix caution labels on all products. There is still a ccctio regarding labels for Ready Mix. Mr. Tuttle is to explore this further in Portland. Mr, harden suggested that this product should have the caution label to warn the user of Lac asbestos content so proper protective steps can be taken before the start of the sanding operation. In order to keep the agreement vita Mr. harden and his staff we plan t.<. following: 1. We have provided all effected employee's with U.S. bureau o: Mines approved respirators designed for use in asbestos dust. We will have no unnpprovec available. 2. All effected employee's will be informed that constant use cz these approved respirators will be a condition of employment in the Joint System manufacturing area. 3 Provide proper use and care of the approved respirators through a rcprescr.ctive from our respirator supplier, M.b.A. - 3- 3 Con't. Our Plane Safety Supervisor will qualify himself so he can provide future Instruction as required. . 4. We will provide small, individual, dust tight lockers for each employee to use as respirator storage when they are off shift. 3. Ve will start a regular respirator Inspection program and keep a record of each employees respirator condition^''' All of the above will be accomplished with no great expense or production delays. We have set the date of 7*20*73 to complete 1 through 5. 6. We have completed the total enclosure of the bag slitter area as suggested by Mr. George Truner. This has caused considerable complaint from the employee's working in t.ie area. There is no doubt that it has made their regular work more difficult but should have no effect on production. This enclosure was completed at minimum expense. The enclosure was constructed with ply wood. Tills enclosure was compacted on Sunday, 7-3*73. Final work had to be accomplished when the production employees were not working. 7. We must clean the inside area of dust accumulation. Due to the height of the open area we will have to set up scaffolds co do this uork. This will be an operation that vill have to be accomplished when production is curtailed. We believe this vill take at least two faiu days work. At thin time ve plan to start the celan-up work on 7-21-73 and hope to finish it on 7-22-73. If jet cannot be completed in tvo days we vill have the folic..du.,; week-end to complute the work before the 7-30-73 deuelxn-. This vill be ar. expansive abatement procccdurc as we vill have several men vorkin.f; ea clean-up with no production possible in the departments S. We will install a portable dust collection unit on the ba~ packer. During our ncatir.h with Mr. Darden I was ii our present dust collection system could be Improved to reduce the dust condition. I stated that I knew of r.o method that would be effective. Mr. Barden then ou^cstcd that wc purchase an industrial vaccum sweeper and hav%_ a flexable hose from the sweeper installed over each fillin;; tube. I stated th*.t it vas t.y belief that this would be ineffective. At this point Mr. Barden insisted that this method be followed. We agreed to the method and will place an order for the vaccun and required flexable hose on 7-10-73 and complete installation as soon as it is received. There should be no problem in meeting the 7-30-7J deadline as this is a normal stock item. Completion coats should be less thaa $300.00, 9. Photo3 taken by Inspector ?auly on his February 1973 inspection shew a large floor fan running to blew be;, packer dust away from the operator. It was pointce out that this fan also blows dust over large areas of the 4 9* Con't building. Wo were ordered to recove this fan. This vis completed on 7-9-73. Since this fan also provided a cooling effect on the Pecker Operator, ve met vith . some employee dissatisfaction. 10. We have been discussing replacement of the air-flov bag packer vith a screw feed type packer vith Mr. DiLoreaxo and George Turner. When a packer is located it will require some plant down tine to install and will no doubt add considerable expense to our total abatement procedure. At this tine X can provide no time schedule regarding completion time. I would suggest that ve cannot complete this chance by 7-30-73 and will have to request additional time from Mr. Barden. However, I would hope at the Sana \ time I can provide proof, such as a purchase order, to prove the packer is on order but undelivered. 11. We will provide plastic bags or plastic wraps for all of our waste by 7-20-73. This wrapped waste will be disposed of by moving to the mine or dumped at the plant as fill and covered with soil. W* will our employees with vhob body covercup clothing. 1 counco provide a completion coco ot Ohio Ciuo on vo have not locolci o supplier * This clothing will ha pr ovided for nil hostby employees * C11 : She S>&p&?cma? Supervisor, (I son) ,, too quality control (3 acn) , naintcncnco workers* {3 acr. mitsm*} , X. truck driver tho rr . ovoc the vcccv C ho Safety Supervisor, (i rwuw) 5 clothing for ssysulf red possible visitors such so the. Q,SHA inspector* * C Thin &&kc& c total cl: at sc 11 not# &i clcOhbop - .0 o. o >--* if } OUo 20 sots will hevc to ho. e topvircvvOfits that they he r.oiotslued in o roilchlo etc snsitory condition* f vrxll report on the cost tr sow.., pQ$lbX&< I would tup cot this to hu St OUpOOS tvo Obut Shot will eootiuno until osbostos is tos.oood iron til ci Cvii orodnets * 13. We will provide a change room with two individual lockers for each employee. In addition this room will contain the small respirator locker discussed under item 4 above. At this time wc plan to move in a small, portable builder.? \?c have available ar.d outfit it to meet these requirement:*.. Work will start on this during the current week. Completion is expected veil ahead of the 7-30-73 deadline. This will be effective during the summer and fall season. If tot.ix asbestos removal from our product line is going to extend into the winter ve will have to provide a different char\e room. Our present solution will not be a satisfactory ch.-a*;*, room during cold weather. Again, use of the provided clothing will be made a condition of employment in the department. -5- 14* We have established a personal monitoring program at this time. This was arranged on 6-16-73. However our meeting indicated that our program is not as complete as O.S.H.A. requires. We will make the necessary arrangements to have a complete check made before the 7-30-73 deadline. However, it appears that analysis of the monitoring tests will not be completed by 7-30-73. I do not think this is as important as getting the monitoring program underway. The O.S.H.A. people indicated that they were aware of the time factor involved in the test analysis 15. Our medical program must be updated and more comprehensive than in the past. This will require some time off at our expense for each employee and a total cost of about $60.C0 each for 16 employees, or a total of $960.00. This will be a continuing cost each year as long as asbestos is used in our product. 16. By 7-27-73 submit a plan end time table for installation of engineering controls to prevent employee exposure to asbestos dust. Mr. DiLorcnzo has assured us that this will present no problem. He and George Turner are to be in Akron on 7-17-73 to go over final details before submitting these plans and timetable. This is a rather extensive plan and requires a considerable amount of work and expense between now and 7-30-73. Mr. Tuttle and I felt that vc had tc ar.rce to all of the above in order to prevent a serious penalty problem with O.S.H.A. It must be remembered that the abatement time in the orignial citation had already passed when we were having our meeting on 7-3-73. Regular progress reports will follow and a complete report will be duo for Mr. Barden on 7-30-73. I cannot stress the position of our other Joint System operations too strongly. It was pointed out very clearly to Mr. Tuttle and myself that the other operations fall under all of the seme conditions as the Akron Plant and that good faith allowances would not be allowed at ocher locations. This would mean much higher fines and no extensions allowed for work completion. I think as a minimum, a written timetable for compliance should be established for the other operations to show progress. It could also be very helpful if Mr. Lehnert could keep each of us posted regarding an asbestos removal timetable. All of these items can prove very helpful to other locations chat find themselves in our position. Being able to show letters with past dates were very helpful during our meeting. k