ABERDEEN WEEKLY PROGRESS REPORT
PRODUCTION SUMMARY, - Week of 1/19 thru 1/25 Week No. 3
Actual Production
1977 Weekly Average
Monthly Cumulative Thru 1/25
Resin H 8 BC Grade
Plasticizer Dry Blend Compound
Off-Grade
2.79 6.6%
.05 .54 .36 5.2%
3.91 2.5%
.07 .61 .31 0%
11.74 2.5% .22 1.82 .93 0%
SAFETY
Two first aid injuries were treated during the week.
VCM DOSIMETRY
Thirty-two samples were taken, twenty-eight below 0.5 ppm and four between 1.1 and 1.9 ppm.
VINYL UNIT
Rate at 399 M lbs. per day at 93.4% customer grade. Made 73 batches of 5385, 5425 and 5446 at 85.9% Type I. Reactor stream factor for the week was gl.1%. Open warehouse space is now approximately 5.5 MM pounds.
Loss in stream factor and low daily rates for this week are due to the severe cold weather. Some stream factor was also lost while replacing the VCM charge pump seal.
BC H grade production was high due to gel and particle size problems encountered during the severe weather.
M Pounds
Resin Produced Compound/Dry Blend Usage Bagged Resin Orders Resin Inventory:
Packaged Bulk Loaded Cars TOTAL
2,793 508
1,092 2,153
31,043 2,654 8,777
42,474
DTH 000052325
R. E. Lehmkuhl January 27, 1977 Aberdeen Weekly Progress Report Page 2
Oklahoma City Resin:
M Lbs.
Resin in Cars Resin in Silos
845 595
VCM RESIDUALS
Resin from Dryers
All Prod.
5385
Resin Shipments
All Prod.
5385
Average, ppm
8.9 5.5 2.4 3.1
Residual VCM results for shipments included two shipments of 5385 resin with results above 5 ppm (6 ppm + 8 ppm).
COMPOUND UNIT
Line I averaged 72 M pounds per day. The off-grade reported this week was accumulated mill scrap. The cumulative off-grade figure is 0% due to reworking of BC grade.
Compound Inventory:
M Lbs.
Packaged Bulk Loaded Cars "BC" "H"
6,329 76
-0330 423
Dry Blend averaged 109 M pounds per day.
Dry Blend Inventory:
M Lbs.
Packaged Bulk Loaded Cars
85 216 660
Plasticizer ran 2 days averaging 27 M pounds per day. Plasticizer operations have been restricted to allow installation of storage tank level gauges and to conserve propane.
The plant has been operating the boilers, dryers, etc. on propane continuously due to natural gas curtailment since 1/15/77 (except for one 24 hour period). We are working with NG GP and Houston Purchasing in order to insure adequate propane supply.
G. G. Draper c: HRF, TGS, CEZ