Document 50aGY46yM7pO5Ra0Gj8NNQ82J

OTHER LOCATIONS COMPANY CONFIDENTIAL GENERAL OFFICES F. B. Hodges W. B. Papageorge J. R. Savage ANNISTON J. T. Bell/J. L. Brown J. L. Corder/G. W. Miller G. L. Jessee J. C. Landwehr/V. R. Haupt/ A. G. McCarty JOB NO. 002-1026 PROGRESS REPORT TECHNICAL SERVICES DEPARTMENT ANNISTON, ALABAMA PLANT REPORT NO. 2 DATE July 21, 1970 TITLE: OBJECTIVE: AROCLOR LOSSES AT THE ANNISTON PLANT To report all data which is available to date on Aroclor losses in the Anniston Plant. Also, to report all data on Aroclor residues in the Snow Creek - Choccolocco Creek Watershed. To summarize progress to date on Aroclor clean-up efforts at Anniston. PERSONNEL: REPORTED BY: SUMMARY: FUTURE WORK: E. G. Wright, (J. T. Bell) E. G. Wright Aroclor losses from the Anniston Plant for the period April 15 through June 30, 1970, averaged16 lbs./day. This is a considerable improvement over losses of > 250 lbs./day for a comparable period during 1969. (Note: > 250 lbs./day is used for the 1969 figure because improved analytical methods and actual measurement of material from the catch tank and coalescer have shown that the losses were approximately 10 times as high as was reported in 1969.) This reduction has been primarily achieved by an edu cational program and resulting changed operating habits plus HC1 organics removal projects. Other projects are being installed and evaluated which will further reduce these losses toward the Business Group goal of 10 ppb. 1. Continue sampling and analyzing for Aroclor losses on a routine basis. 2. Continue to sample and analyze grab samples from Snow and Choccolocco Creeks for Aroclor content. 3. Sample and analyze ambient air for Aroclor content. 4. Sample and analyze tank vents in the Aroclor department to pinpoint atmospheric loss points. 5. Collect additional aquatic samples from Choccolocco Creek Watershed. 6. Issue periodical reports on Anniston Plant losses and progress toward 10 ppb goal. ANNISTON bs DSW 378760 STLCOPCB4099965 TSD Progress Report No. 2 Job No. 002-1026 Page 2 DISCUSSION I. Aroclor Department Sewers A. HC1 Sewer Since the Installation of a catch tank in the HC1 gas line and a coalescer in the acid stream, the Aroclor content in the waste acid stream has been greatly reduced, (i.e., Approximately 200 pounds of organic material is being removed by these two projects.) During the sampling period, this sewer averaged 13.0 ppb of Aroclor. (See Data Sheet I.) Based on this data, the decision was made not to route this stream to the sump presently being installed. This resulted in a substantial savings on installing the sump. However, at times, the spent carbon from the HC1 carbon towers was dumped into this sewer. Alternate methods are being evaluated to collect the spent carbon for disposal. _ ' B. Chlorinator and Still Room Sewers At times these sewers had a two phase flow. The quantity of the Aroclor phase could not be determined. However, these two sewers are being routed through the Aroclor sump. When the sump is completed and put into operation, the Aroclor phase can then be quantified. The sump will also provide a means for recovering this second phase, which under present conditions eventually makes its way out of the plant. When the sump is installed in these sewers, a daily sample will be taken and analyzed to monitor the efficiency of the sump. A second phase of projects is scheduled for further reduction of Aroclor in these process streams (Ref.: Anniston Progress Report No. 1, Job No. 003-1051). C. Warehouse Sewer The major losses from this sewer are due to spills while drumming or flaking. These spills are then swept to the sewer during floor clean-up. Presently, clean-up is accomplished by use of Du-Bois steam cleaning which considerably raises the solubility of Aroclor in water. Alternate methods of clean-up and disposal are presently being evaluated. D. Total Plant Effluent During the period April 15 through June 30, 1970, the total plant losses averaged 16 lbs./day. This is excluding the period April 21 through May 20,, 1970, when the acid neutralization pit was being cleaned. During this period, the losses ran very high (See Data Sheet V.) due to the fact that the Aroclor which was trapped in the pit was being stirred and entrained into the plant effluent. The discrepancy between the 1.7 lbs./day losses from the sewers and the 16 lbs./day losses reported from the plant effluent may possibly be due to two things: 1) Samples from the sewers did not include any of the Aroclor phase and 2) Due to the mixing and the velocity at the plant effluent sampler, some of the Aroclor was being entrained and, therefore, DSW 378761 STLCOPCB4099966 TSD Progress Report No. 2 Job No. 002-1026 Page 3 giving higher results. A closer correlation is expected when an accurate measure of the Aroclor phase can be accomplished. Close observation of the sump should provide this information. E. Miscellaneous Samples (Data Sheet VII & VIII) These samples were collected from Snow and Choccolocco Creeks at various times. They show that Aroclors are present in the Choccolocco Creek, even above \rtiere the Monsanto effluent enters the creek. They also indicate significant amounts of Aroclor in the mud and water of Choccolocco and Snow Creeks a condiserable distance (15-20 miles) downstream from the Anniston Plant. In fact, Aroclor concentrations can probably be found in the Coosa River system. Data Sheet VIII lists the results of samples taken while the Aroclor department was not operating. These results indicate that significant Aroclor is being lost even when the plant is down or that these are deposits of Aroclor in the various sewers. The sample from Coldwater Spring (City of Anniston's water supply) was taken for the purpose of establishing a background for this area. It might be interesting to note that this is the only sample collected to date which does not contain Aroclors. DSW 378762 STLCOPCB4099967 DATA SHEET I Sample Location: UC1 Department Sewer Average Flow: 200 GPM Date 4/15/70 4/16/70 4/17/70 4/20/70 4/21/70 4/22/70 4/23/70 4/24/70 4/27/70 4/28/70 4/29/70 5/3/70 5/4/70 Aroclor Concentration (PPB) 12 7.8 8.3 18.5 6.2 16.4 10.6 20.4 15.0 13.1 18.7 10.5 11.3 Aroclor Losses (#/dav) 0.030 0.019 0.020 0.044 0.015 0.039 0.025 0.050 0.036 0.031 0.045 0.025 0.027 Average: 13.0 0.031 DSW 378763 STLCOPCB4099968 DATA SHEET II Sample Location: Warehouse Sewer Average Flow: 65 GFM (Estimated) Date 4/22/70 4/23/70 4/24/70 4/27/70 4/28/70 4/29/70 5/3/70 5/4/70 Aroclor Concentration (PPB) 2,800 2,860 1,250 1,520 1,300 2,130 1,320 1,480 Aroclor Losses (#/day) 2.18 2.23 0.98 1.18 1.02 1.66 1.03 1.15 Average: 1,833 1.43 DSW 378764 STLCOPCB4099969 DATA SHEET III Sample Location: Aroclor Still Room Sewer Average Flow: 150 GFM (Estimated) Date 4/22/70 4/23/70 4/24/70 4/27/70 4/28/70 4/29/70 5/4/70 5/6/70 5/8/70 Aroclor Concentration (PPB) 12,500* 13.8 30.0 17.0 12.2 4.8 20.0 11.0 23.4 Aroclor Losses (///day) 0.025 0.054 0.036 0.022 0.009 0.036 0.020 0.042 Average: 16.5 0.031 *Contaminated sample - not included in average.. DSW 378765 STLCOPCB4099970 DATA SHEET IV Sample Location: Aroclor Chlorinator Sewer Average Flow: 275 GPM (Estimated) Date 4/22/70 4/23/70 4/24/70 4/27/70 4/28/70 4/29/70 5/3/70 5/4/70 5/6/70 Aroclor Concentration (PPB) 80.0 46.5 35.0 51.0 56.5 70.0 81.6 73.0 85.3 Aroclor Losses (#/day) 0.264 0.153 0.115 0.168 0.186 0.233 0.262 0.241 0.281 Average: 64.3 0.212 DSW 378766 STLCOPCB4099971 * DATA SHEET V Sample Location: Total Plant Effluent Average Flow: 900 GPM Aroclor Concentration Date(PPB) (fl/dav) 4/15/70 4/16/70 4/17/70 4/21/70 4/22/70 4/23/70 4/27/70 5/4/70 5/5/70 5/6/70 5/7/70 5/10/70 5/12/70 5/20/70 5/25/70 6/2/70 6/3/70 6/5/70 6/6/70 6/7/70 6/8/70 6/9/70 6/10/70 6/11/70 6/12/70 6/13/70 6/14/70 6/15/70 6/16/70 6/17/70 6/18/70 6/19/70 6/20/70 6/21/70 6/22/70 6/23/70 6/24/70 6/25/70 6/26/70 6/27/70 6/28/70 6/29/70 6/30/70 98 150 '3,300 10,800 \ 16,000 875 13,750 18,000 3,300 y* 9,750 9,900 3,300 1,327 2,650j 68 216 880 148 360 950 315 3,100 400 760 1,540 1,875 85 820 520 1,820 490 3,500 3,825 800 720 1.920 1,620 1,460 2,940 680 3,966 3,200 4,200 Aroclor Losses 1.08 1.65 36.30 119.00\ 176.00 9.62 151.00 198.00 36.30 107.00 109.00 36.30 14.60 29.20/ 0.75 2.38 9.70 1.63 3.96 10.45 3.46 34.10 4.40 8.35 16.90 20.60 0.94 9.00 5.72 '20.00 5.40 38.50 42.00 8.80 7.92 21.10 17.80 16.10 32.40 7.47 43,60 35.20 46.20 Average: 1,400 15.74 *Limestone Pit being cleaned out - Data not included in average. STLCOPCB4099972 DATA SHEET VI - continued Aroclor Concentration Date__________________ (PPB) 6/12/70 6/13/70 6/14/70, 6/15/70 6/16/70 6/17/70 6/19/70 6/20/70 6/21/70 630.0 760.0 254.0 1,470.0 41.5 110.0 216.0 272.0 480.0 Average: 768.0 ^Limestone pit being cleaned out - Data not included in average. DSW 378768 STLCOPCB4099973 i V` DATA SHEET VX Sample Location: Snow Creek Sampling Station Date Aroclor Concentration _________ (PPB) 4/15/70 4/16/70 4/17/70 4/18/70 4/19/70 4/20/70 4/21/70 4/22/70 4/23/70 4/24/70 4/25/70 4/26/70 4/27/70 4/28/70 4/29/70 5/1/70 5/2/70 5/7/70 5/8/70 5/9/70 5/10/70 5/11/70 5/12/70 5/13/70 5/14/70 5/18/70 5/19/70 5/20/70 5/21/70 5/22/70 5/23/70 5/24/70 5/29/70 5/30/70 5/31/70 6/1/70 6/2/70 6/3/70 6/4/70 6/5/70 6/6/70 6/7/70 6/8/70 6/9/70 1,800.0 233.0 124.0 499.0 5,435.0 1,950.0 1,220.0^ 2,550.0 3,200.0 3,750.0 3,800.0 2,166.0 1,860.0 860.0 2,800.0 2,800.0 1,450.6 1,320.0 1,760.0 1,840.0 9,600.0 1,740.0 3.8 1,566.0 1,325.0 1,920.0 2,400.0 1,320.Q^ 3,000.0 1,500.0 800.0 1,540.0 12.5 5.0 14.8 25.0 16.4 36.0 14.0 1,320.0 140.0 240.0 104.0 430.0 DSW 378769 STLCOPCB4099974 .vtf'4 'Mil DATA SHEET VII Sample No. Date Sample Location 1 10-8-69 Snow Creek at Glenaddie 2 10-8-69 Choccolocco Creek at Bolling Springs (upstream from Monsanto's effluent) 3 10-8-69 Choccolocco Creek at City Treatment Plant (1 block below confluence of Snow and Choccolocco Creeks) 4 10-8-69 Choccolocco Creek at Jackson Shoals (~20 miles downstream) 5 10-8-69 Choccolocco Creek at Eureka Bridge (25 miles downstream, mouth of Choccolocco Into Coosa River) 6 11-23-69 Snow Creek - 1 block below plant 7 11-23-69 Snow Creek at Glenaddie 8 11-23-69 Choccolocco Creek at Highway 9 (sl5 miles upstream from the confluence of Snow and Choccolocco Creeks) 9 11-23-69 Choccolocco Creek at Bolling Springs (upstream from Monsanto's effluent) 10 11-23-69 Choccolocco Creek at City Treatment Plant (1 block below confluence of Snow and Choccolocco Creeks) 11 11-23-69 Choccolocco Creek at Jackson Shoals (s*20 miles downstream) Aroclor Concentration (PPB) Mud Hater 2.36 x 107 23.3 78 8.1 738,000 < 2.0 7,300 3,240 5.8 < 2.0 2.19 x 106 1.84 x 106 1,536 20,300 1,435 11 26 10 TM 58 470 10 DSW 378770 STLCOPCB4099975 DATA SHEET VIII Date 10-3-69^ 10-3-69 10-3-69 10-3-69 \* 10-3-69 10-3-69 10-3-69^ Sample Location Aroclor Concentration (PPB) Limestone Pit Influent 4,180 Limestone Pit Effluent 103 Plant Effluent 74 Warehouse Sewer 216 Aroclor Chlorinetor Sewer 317 HC1 Department Sewer 264 Plant Storm Sewer 2 4-20-70 Coldwater Spring (City Water Supply) NDA *Note: These samples were collected after the Aroclor department had been shutdown one week due to a fire in the motor control center. COMPANY CONFIDENTIAL DSW 378771 STLCOPCB4099976 STLCOPCB4099977