Document 50aGY46yM7pO5Ra0Gj8NNQ82J
OTHER LOCATIONS
COMPANY CONFIDENTIAL
GENERAL OFFICES F. B. Hodges W. B. Papageorge J. R. Savage
ANNISTON
J. T. Bell/J. L. Brown J. L. Corder/G. W. Miller G. L. Jessee J. C. Landwehr/V. R. Haupt/
A. G. McCarty
JOB NO. 002-1026
PROGRESS REPORT
TECHNICAL SERVICES DEPARTMENT
ANNISTON, ALABAMA PLANT
REPORT NO. 2
DATE July 21, 1970
TITLE: OBJECTIVE:
AROCLOR LOSSES AT THE ANNISTON PLANT
To report all data which is available to date on Aroclor losses in the Anniston Plant. Also, to report all data on Aroclor residues in the Snow Creek - Choccolocco Creek Watershed. To summarize progress to date on Aroclor clean-up efforts at Anniston.
PERSONNEL: REPORTED BY: SUMMARY:
FUTURE WORK:
E. G. Wright, (J. T. Bell)
E. G. Wright
Aroclor losses from the Anniston Plant for the period April 15 through June 30, 1970, averaged16 lbs./day. This is a considerable improvement over losses of > 250 lbs./day for a comparable period during 1969. (Note: > 250 lbs./day is used for the 1969 figure because improved analytical methods and actual measurement of material from the catch tank and coalescer have shown that the losses were approximately 10 times as high as was reported in 1969.) This reduction has been primarily achieved by an edu cational program and resulting changed operating habits plus HC1 organics removal projects. Other projects are being installed and evaluated which will further reduce these losses toward the Business Group goal of 10 ppb.
1. Continue sampling and analyzing for Aroclor losses on a routine basis.
2. Continue to sample and analyze grab samples from Snow and Choccolocco Creeks for Aroclor content.
3. Sample and analyze ambient air for Aroclor content.
4. Sample and analyze tank vents in the Aroclor department to pinpoint atmospheric loss points.
5. Collect additional aquatic samples from Choccolocco Creek Watershed.
6. Issue periodical reports on Anniston Plant losses and progress toward 10 ppb goal.
ANNISTON
bs
DSW 378760 STLCOPCB4099965
TSD Progress Report No. 2 Job No. 002-1026
Page 2
DISCUSSION
I. Aroclor Department Sewers
A. HC1 Sewer
Since the Installation of a catch tank in the HC1 gas line and a coalescer
in the acid stream, the Aroclor content in the waste acid stream has been
greatly reduced, (i.e., Approximately 200 pounds of organic material is
being removed by these two projects.) During the sampling period, this
sewer averaged 13.0 ppb of Aroclor. (See Data Sheet I.) Based on this
data, the decision was made not to route this stream to the sump presently
being installed. This resulted in a substantial savings on installing the
sump. However, at times, the spent carbon from the HC1 carbon towers was
dumped into this sewer. Alternate methods are being evaluated to collect
the spent carbon for disposal.
_
'
B. Chlorinator and Still Room Sewers
At times these sewers had a two phase flow. The quantity of the Aroclor phase could not be determined. However, these two sewers are being routed through the Aroclor sump. When the sump is completed and put into operation, the Aroclor phase can then be quantified. The sump will also provide a means for recovering this second phase, which under present conditions eventually makes its way out of the plant.
When the sump is installed in these sewers, a daily sample will be taken and analyzed to monitor the efficiency of the sump. A second phase of projects is scheduled for further reduction of Aroclor in these process streams (Ref.: Anniston Progress Report No. 1, Job No. 003-1051).
C. Warehouse Sewer
The major losses from this sewer are due to spills while drumming or flaking. These spills are then swept to the sewer during floor clean-up. Presently, clean-up is accomplished by use of Du-Bois steam cleaning which considerably raises the solubility of Aroclor in water. Alternate methods of clean-up and disposal are presently being evaluated.
D. Total Plant Effluent
During the period April 15 through June 30, 1970, the total plant losses averaged 16 lbs./day. This is excluding the period April 21 through May 20,, 1970, when the acid neutralization pit was being cleaned. During this period, the losses ran very high (See Data Sheet V.) due to the fact that the Aroclor which was trapped in the pit was being stirred and entrained into the plant effluent.
The discrepancy between the 1.7 lbs./day losses from the sewers and the 16 lbs./day losses reported from the plant effluent may possibly be due to two things: 1) Samples from the sewers did not include any of the Aroclor phase and 2) Due to the mixing and the velocity at the plant effluent sampler, some of the Aroclor was being entrained and, therefore,
DSW 378761 STLCOPCB4099966
TSD Progress Report No. 2 Job No. 002-1026
Page 3
giving higher results. A closer correlation is expected when an accurate measure of the Aroclor phase can be accomplished. Close observation of the sump should provide this information.
E. Miscellaneous Samples (Data Sheet VII & VIII)
These samples were collected from Snow and Choccolocco Creeks at various times. They show that Aroclors are present in the Choccolocco Creek, even above \rtiere the Monsanto effluent enters the creek. They also indicate significant amounts of Aroclor in the mud and water of Choccolocco and Snow Creeks a condiserable distance (15-20 miles) downstream from the Anniston Plant. In fact, Aroclor concentrations can probably be found in the Coosa River system.
Data Sheet VIII lists the results of samples taken while the Aroclor department was not operating. These results indicate that significant Aroclor is being lost even when the plant is down or that these are deposits of Aroclor in the various sewers.
The sample from Coldwater Spring (City of Anniston's water supply) was taken for the purpose of establishing a background for this area. It might be interesting to note that this is the only sample collected to date which does not contain Aroclors.
DSW 378762 STLCOPCB4099967
DATA SHEET I
Sample Location: UC1 Department Sewer
Average Flow:
200 GPM
Date 4/15/70 4/16/70 4/17/70 4/20/70 4/21/70 4/22/70 4/23/70 4/24/70 4/27/70 4/28/70 4/29/70 5/3/70 5/4/70
Aroclor Concentration (PPB) 12 7.8 8.3 18.5 6.2 16.4 10.6 20.4 15.0 13.1 18.7 10.5 11.3
Aroclor Losses (#/dav) 0.030 0.019 0.020 0.044 0.015 0.039 0.025 0.050 0.036 0.031 0.045 0.025 0.027
Average:
13.0
0.031
DSW 378763 STLCOPCB4099968
DATA SHEET II
Sample Location: Warehouse Sewer
Average Flow:
65 GFM (Estimated)
Date 4/22/70 4/23/70 4/24/70 4/27/70 4/28/70 4/29/70 5/3/70 5/4/70
Aroclor Concentration (PPB) 2,800 2,860 1,250 1,520 1,300 2,130 1,320 1,480
Aroclor Losses (#/day) 2.18 2.23 0.98 1.18 1.02 1.66 1.03 1.15
Average:
1,833
1.43
DSW 378764 STLCOPCB4099969
DATA SHEET III
Sample Location: Aroclor Still Room Sewer
Average Flow:
150 GFM (Estimated)
Date 4/22/70 4/23/70 4/24/70 4/27/70 4/28/70 4/29/70 5/4/70 5/6/70 5/8/70
Aroclor Concentration (PPB) 12,500*
13.8 30.0 17.0 12.2
4.8 20.0 11.0 23.4
Aroclor Losses (///day)
0.025 0.054 0.036 0.022 0.009 0.036 0.020 0.042
Average:
16.5
0.031
*Contaminated sample - not included in average..
DSW 378765 STLCOPCB4099970
DATA SHEET IV
Sample Location: Aroclor Chlorinator Sewer
Average Flow:
275 GPM (Estimated)
Date 4/22/70 4/23/70 4/24/70 4/27/70 4/28/70 4/29/70 5/3/70 5/4/70 5/6/70
Aroclor Concentration (PPB) 80.0 46.5 35.0 51.0 56.5 70.0 81.6 73.0 85.3
Aroclor Losses (#/day) 0.264 0.153 0.115 0.168 0.186 0.233 0.262 0.241 0.281
Average:
64.3
0.212
DSW 378766 STLCOPCB4099971
*
DATA SHEET V
Sample Location: Total Plant Effluent
Average Flow:
900 GPM
Aroclor Concentration Date(PPB) (fl/dav)
4/15/70 4/16/70 4/17/70 4/21/70 4/22/70 4/23/70 4/27/70 5/4/70 5/5/70 5/6/70 5/7/70 5/10/70 5/12/70 5/20/70
5/25/70 6/2/70 6/3/70 6/5/70 6/6/70 6/7/70 6/8/70
6/9/70 6/10/70 6/11/70 6/12/70 6/13/70 6/14/70 6/15/70 6/16/70 6/17/70 6/18/70 6/19/70 6/20/70 6/21/70 6/22/70 6/23/70 6/24/70 6/25/70 6/26/70 6/27/70 6/28/70 6/29/70 6/30/70
98 150 '3,300 10,800 \
16,000 875
13,750 18,000
3,300 y* 9,750 9,900 3,300 1,327 2,650j
68 216 880 148 360 950 315 3,100 400 760 1,540 1,875
85 820 520 1,820 490 3,500 3,825 800 720 1.920 1,620 1,460 2,940 680 3,966 3,200 4,200
Aroclor Losses
1.08 1.65 36.30 119.00\ 176.00 9.62 151.00 198.00 36.30
107.00 109.00
36.30 14.60 29.20/
0.75 2.38 9.70 1.63 3.96 10.45 3.46 34.10 4.40 8.35 16.90 20.60 0.94 9.00 5.72 '20.00 5.40 38.50 42.00 8.80 7.92 21.10 17.80 16.10 32.40 7.47 43,60 35.20 46.20
Average:
1,400
15.74
*Limestone Pit being cleaned out - Data not included in average.
STLCOPCB4099972
DATA SHEET VI - continued
Aroclor Concentration
Date__________________
(PPB)
6/12/70 6/13/70
6/14/70, 6/15/70 6/16/70 6/17/70 6/19/70 6/20/70 6/21/70
630.0 760.0 254.0 1,470.0
41.5 110.0 216.0 272.0 480.0
Average:
768.0
^Limestone pit being cleaned out - Data not included in average.
DSW 378768 STLCOPCB4099973
i V`
DATA SHEET VX
Sample Location: Snow Creek Sampling Station
Date
Aroclor Concentration
_________
(PPB)
4/15/70 4/16/70 4/17/70 4/18/70 4/19/70 4/20/70 4/21/70 4/22/70 4/23/70 4/24/70 4/25/70 4/26/70 4/27/70 4/28/70 4/29/70 5/1/70 5/2/70 5/7/70 5/8/70 5/9/70 5/10/70 5/11/70 5/12/70 5/13/70
5/14/70 5/18/70 5/19/70 5/20/70 5/21/70
5/22/70 5/23/70 5/24/70 5/29/70 5/30/70 5/31/70 6/1/70 6/2/70 6/3/70 6/4/70 6/5/70 6/6/70 6/7/70 6/8/70 6/9/70
1,800.0 233.0 124.0 499.0
5,435.0 1,950.0 1,220.0^
2,550.0 3,200.0 3,750.0 3,800.0 2,166.0 1,860.0
860.0 2,800.0 2,800.0 1,450.6 1,320.0 1,760.0 1,840.0 9,600.0 1,740.0
3.8 1,566.0 1,325.0 1,920.0 2,400.0 1,320.Q^
3,000.0 1,500.0
800.0 1,540.0
12.5 5.0
14.8 25.0 16.4 36.0 14.0 1,320.0 140.0 240.0 104.0 430.0
DSW 378769 STLCOPCB4099974
.vtf'4 'Mil
DATA SHEET VII
Sample No.
Date
Sample Location
1 10-8-69
Snow Creek at Glenaddie
2 10-8-69
Choccolocco Creek at Bolling Springs (upstream from Monsanto's effluent)
3 10-8-69
Choccolocco Creek at City Treatment Plant (1 block below confluence of Snow and
Choccolocco Creeks)
4 10-8-69
Choccolocco Creek at Jackson Shoals (~20 miles downstream)
5 10-8-69
Choccolocco Creek at Eureka Bridge (25 miles downstream, mouth of
Choccolocco Into Coosa River)
6 11-23-69 Snow Creek - 1 block below plant
7 11-23-69 Snow Creek at Glenaddie
8 11-23-69 Choccolocco Creek at Highway 9 (sl5 miles upstream from the confluence of Snow and Choccolocco Creeks)
9 11-23-69 Choccolocco Creek at Bolling Springs (upstream from Monsanto's effluent)
10 11-23-69 Choccolocco Creek at City Treatment Plant (1 block below confluence of Snow and Choccolocco Creeks)
11 11-23-69 Choccolocco Creek at Jackson Shoals (s*20 miles downstream)
Aroclor Concentration
(PPB)
Mud
Hater
2.36 x 107
23.3
78 8.1
738,000
< 2.0
7,300 3,240
5.8 < 2.0
2.19 x 106 1.84 x 106 1,536
20,300 1,435 11
26 10 TM 58 470 10
DSW 378770 STLCOPCB4099975
DATA SHEET VIII
Date 10-3-69^ 10-3-69 10-3-69 10-3-69 \* 10-3-69 10-3-69 10-3-69^
Sample Location
Aroclor Concentration (PPB)
Limestone Pit Influent
4,180
Limestone Pit Effluent
103
Plant Effluent
74
Warehouse Sewer
216
Aroclor Chlorinetor Sewer
317
HC1 Department Sewer
264
Plant Storm Sewer
2
4-20-70
Coldwater Spring (City Water Supply)
NDA
*Note: These samples were collected after the Aroclor department had been shutdown one week due to a fire in the motor control center.
COMPANY CONFIDENTIAL
DSW 378771 STLCOPCB4099976
STLCOPCB4099977