Document 50Vp4MozwEZO14QEJ6Gn122z

Monsanto r + <?* 5M i i. s . t ~ - May 14, 1987' PCB - Free Status Memo DBR to EJJ, et.al. - 4/30/87 D. B. Redington - C2SB TO : J. L. Brown D. K. Denner M. R. Foresman - G4WT . Per your above referenced request, attached herewith is the plan to achieve a PCB - Free status at the Anniston Plant. This is being forwarded to you in as much as the Ag Companv is handling the "Anniston reserve account," a part of which is this effort. If you have any questions or need addition information, please give me a call. ,, RLC5/sag Attachment Robert L. Cheever QSW 120812 Safety Interest Yields Injury Free Dividends WATER_PCB-SD0000006185 PCB FREE PLAN ANNISTON, ALABAMA PLANT I. RESPONSIBILITY The responsibility for all PCB activities at the Anniston Plant has been assigned to R. L. Cheever, Senior Environmental Specialist. The responsibilities include, but are not limited to: recordkeeping, inspections, report preparation; inventory control; and PCB-Free plan ' execution. II. INVENTORY The inventory of PCB and PCB-contaminated equipment in the Anniston Plant'is as follows: Device Transformer Transformer Transformer Transformer Serial No. 7027013 E-690331 C-857658 7024135 Quantity of Fluid" Contamination 240 gallons 1230 gallons 380 gallons 261 gallons 142,000 ppm 170 ppm 460 ppm 80 ppm III. PCB REMOVAL/DISPOSAL PLAN The Anniston Plant has four (4) in use electrical transformers which are either PCB-contaminated or PCB filled as shown in the inventory above. These units will become surplus equipment during the on-going site consolidation effort. Two of the four units are associated with the idle facility being dismantled. The other two units will be replaced with two non-PCB units which become available through this same dismantling effort. In late 1987 or early 1988, these four transformers will be available for disposal. The units will be handled as a "package" and will be dismantled and disposed of by an approved Monsanto outside processor, in a "turn-key" approach. It is the plant's intention to have the disposal contractor "take title" to the units, in place, and to dismantle, transport off-site and dispose of fluids and casings. The estimate cost of accomplishing the plan goal is $50k, although, no formal proposals from potential contractors have been requested. These monies have already been set aside as a portion of the Anniston reserve account. RLCS/sag CSw 120813 WATER PCB-SD0000006186