Document 50DQqJJ42Z1dRyJRXZVYk3XQJ
Monsanto
W. C - Engman - WOK__________________________________________________________
January 5, 197
STATUS OP PROORAM FOR AROCLOR POLLUTION CONTROL
Mr. J. R. Savage - 0.0.
Messrs. O. L. Bratsch
C. F. Buckley/to. R. Poresman B. W. Corlew P. E. Helsler P. B. Hodges - 0.0. D. W. Jackson W. A. Krull R. M. McCutchan P. McDonald - Newport A, L. Rasmussen W. R. Richard - 0.0. J. Corder - Anniston
B. Young
This Is the January 1, 1971 status of PCB pollution control program.
I. PCB Levels In Sewer;
A. Aroclor losses from the Aroclor Department averaged about 0.6 lbs/day and ranged from about 0,2 to 1.4
lbs/day.
Losses from the treatment plant for the period 11/17-12/17 averaged 34 lbs/day (177 PPb). Range for 7 samples was 9 to 53 lbs/day (47-200 ppb). Samples taken during the 3 day neutralization teBt (12/15-12/17) are not Included. Average for this period was 27 lbs/day.
B. Program to monitor the various plant sewers was begun the last week of December. Plans are to composite samples twice per week for analysis.
C. Sewer samples were taken from the effluents of the other Industrial plants. These Included:
Midwest Rubber
American Zinc Cerro Copper ft Brass Mobil Oil Dead Creek Village
9 ppb
6 ppb 9 ppb 54 ppb 18 ppb 2110 ppb
The only significant quantity la the PCB's rrom the Village sewer. This amounts to about 2 to 3 lbs/day. Probable source Is Aroclor trailer washes at Rogers Terminal.
II. Projects to Reduce Sewered PCB's from Aroclor Department
A. Design package for project to pave and trench loading areas Is 95# complete and will be Issued by 1/15/71.
MONS 099080
Mr. J. R. Savage - 0.0.
Status of Program for Aroolor Pollution Control
Page 2
III. Program to Eliminate Sewered PCB's from Using Departments
Jerry Bratech has requested by memo that all General Superin tendents proceed' at once to change out all thermlnol units to non-Aroclor heat transfer fluids.
IV. Removal of Soluble PCB's from Sewer Stream (Reach 10 ppb)
A 3 day test was run 12/15-12/17 In which the entire plant effluent was neutralized with lime. Results Indicated no change In the average level of PCB's In either the Influent or the effluent at the treatment plant at the <30% confidence level.
At this point. It appears possible to reach the goal of 10 ppb without secondary or tertiary treatment by doing the following:
1. Change out of all plant thermlnol units to nonAroclor fluids.
2. Continue control of losses at the Aroclor Depart ment at less than 1,5 lbs/day.
3. Clean all contaminated sewers and sewer boxes.
4. Monitor and control Rogers Terminal.
V. PCB Levels In the Atmosphere
A project premise and estimate for $6,000 were prepared to replace the nitrogen purge with a nitrogen blanket at the mix tanks and to reroute the chlorlnater rupture disc lines to the pad.
A sampling station will be shared with the chlorine department to monitor PCB content of air downwind from the Aroclor Department. Samples will be taken every other week starting the week of 1/11/71.
VI. PCB Rework Project (Eat. 2095)
Project package Is essentially complete and will be Issued the week of 1/4/71.
Technical Services Dept /br
MONS 099081