Document 50DD7EwNyZ6VJxbm3MnNavEv4
ABD00005732
Visto Polymers A Division of Vista Chemical Company
Highway 25 Post Office Box 91
CHEMICAL PLANT SAFETY AND HEALTH MANUAL ABERDEEN, MISSISSIPPI
Aberdeen, Mississippi 39730 Phone (601)369-8111
SUBJECT
PLANT EMERGENCY ACTION GUIDELINES
EFFECTIVE DATE
PREPARED BY
SAFETY DIRECTOR
APPROVED BY References
PLANT MANAGER
l
29 CFR 1910, Subpart L - Fire Protection 20 CFR 1910 1017 Vinyl Chloride
SUMMARY OF EMERGENCY ACTIONS
The following items describe, in outline form, the actions that must be taken or considered in the event of a plant emergency The items are not organized in order of priority Details of this summary are found in the sections that follow
I Immediate Actions
A Sound the emergency alarm B Stop all hot work C Evacuate and count heads D Rescue missing personnel E Emergency Controls
3 3 4 5 5
- Control vapor releases by remote and/or local block-in of valves
- Activate Emergency Organization, ifnecessary - Protect personnel and extinguish fires - Secure chlorine leaks - Utilize fire protection systems - Utilize emergency manpower
6 6 7 7 8 9
F Utilize outside assistance if needed G Evacuate plant and community areas asneeded H Notify community as necessary I Re-enter work areas when it is safe to do so
11 12 12 13
II Other Emergency Organization Matters
A Position descriptions B Reporting requirements C Emergency phone numbers D Attachments
14 23 24 26, 28, 31, 33, 43
06/22/90 Replaces 05/05/88
VSP Page 1
ABD00005733
GENERAL
The Aberdeen Chemical Plant Management recognizes its responsibilities to its employees and the citizens of Aberdeen in the event of an emergency The plant will make every effort to prevent the conditions which can lead to an emergency In event of emergency, the primary concerns shall be the safety of employees and the general public
PURPOSE
This plan has been developed to fulfill the following purposes
1 To ensure the safety and welfare of employees and the general public in the event of a plant emergency,
2 Minimize property damage and provide for the resumption of normal operations following a plant emergency,
3 Satisfy the legitimate concern of employees, their families, and the general public by providing prompt, accurate information concerning the extent and effects of plant emergencies,
4 Describe the duties of each position listed in the emergency organization, and,
5 Outline the requirements for reporting plant emergencies
SCOPE
A plant emergency is any unexpected event or condition which requires immediate action to prevent
1 Injury to personnel or members of the community,
2 Adverse environmental impact, and/or,
3 Serious damage to plant equipment
Plant emergencies include by are not limited to
1 Toxic, flammable, or corrosive material releases,
2 Fires and/or explosions, or,
3 Personal injury that requires removal of a person from an elevated location
4 Bomb threats against the plant
The extent to which this plan is implemented will be determined by the severity or potential severity of the incident This determination will be made by the Emergency Officer (alternate Area Shift Supervisor)
06/22/90 Replaces 11/10/88
VSP Page 2
ABD00005734
IMMEDIATE ACTIONS
The management of the initial response to any emergency is the key to a successful outcome This responsibility rests with the Emergency Officer (alternate Area Shift Supervisor) During this period, the following actions must be taken or considered
I Sound the Emergency Alarm
Anyone discovering an emergency should report the condition and location to the Vinyl control room by radio, Gaitronics or telephone extension 2200 The Lead Operator taking the call will turn on the alarm and initiate public address (P A ) and Gaitronics announcements in the following sequence
- - Alarm on - 10 seconds - then off
- Announce the location and condition (vapor release, fire, etc )
The alarm system will be tested weekly during the first system tests
II STOP ALL HOT WORK*
Motor vehicles, portable transfer system, welding machines and other sources of ignition must be shut down immediately whenever the plant emergency alarm is sounded Shut down and secure operations as required to prevent further injury to personnel or damage to equipment as follows
A Stop flow of flammable materials feeding fires or potential fires, including dryer and incinerator gas burners, inert gas generator, building heaters, etc
B Boiler house operation is to be shut down only in cases where unfavorable wind conditions and flammable material release is great enough to present a hazard Boiler house shutdown will normally occur on orders from the Plant Manager, Plant Superintendent, Emergency Crew Chief, the Emergency Officer, or the Safety Director The Utility Technician should act rapidly to shut down all ignition sources in the boiler house area The forced draft fans on boilers may be needed to prevent vapor cloud flashback
C Smoking on plant property is prohibited while the plant in under an alarm condition
06/22/90 Replaces 11/10/88
VSP Page 3
ABD00005735
IMMEDIATE ACTIONS - Continued III Evacuation and Headcount
When area evacuation is necessary, all personnel will be accounted for in one of the following uncontarainated locations
- Primary evacuation area, - Secondary evacuation area;
- At fence south of main gate, or, - At east gate (drum yard) if main gate is unsafe because of
smoke or high vapor concentration - North property line in safe location Headcounts will be done as specified m Departmental Headcount Plans (see Attachment D). Emergency response personnel will report to the emergency location after being properly accounted for
Primary Evacuation Areas Vinyl Area - at pad north of the control room Compound/Plasticizer - Warehouse at northwest corner of the staging area directly south of the plant auditorium Lab - Office area near radio Utility Technicians - Boiler house Maintenance - Main shop Administrative Services - Canopy at main west entrance to main warehouse Back-Shift Administrative Services - Guard house Back-Shift - Mechanical Personnel - Shift Mechanics, pad north of Vinyl control room All other personnel report to the guard house Main Office Personnel - Main office lobby Back-Shift - Engineering. Research or Office Personnel - Guard house Contractors and Truck Drivers - North of main gate
06/22/90 Replaces 11/10/88
VSP Page 4
ABD00005736
IMMEDIATE ACTIONS - Continued
III Evacuation and Headcount - continued
Visitors must be accounted for by escorting them to their point of entry
Vista employees (plant and non-plant) working after normal business hours must be logged in on the Off-Hours Entry Log at the main gate These personnel must report to the guard to satisfy the headcount requirement
The guard will review the emergency action instructions printed on the
vehicle pass with all incoming truck drivers prior to entry
Plant
personnel should remind truck drivers about their responsibilities if the
proper actions are not being taken
Always evacuate upwind or at right angles to the wind Use the wind socks (417, 281 silos, 502 blend tank), or steam plumes to choose the safest, upwind escape route
IV Rescue
Personnel who are not accounted for may be injured and rescue operations required This will be determined by the Emergency Officer or Management Group after notification of the results of the headcount by the guard
If the emergency is due to injury in an elevated location, the following equipment must be brought to the injury location by the first aid team
From First Aid - First Aid Kit - Scoop Stretcher - Rescue Ropes (Green Bag)
From Emergency Equipment Station - Basket Stretcher - Leather Gloves
Plant personnel will use this equipment under the joint direction of the Emergency Officer, Safety Director, Plant Nurse and/or ambulance personnel
V Emergency Control
The consequences of any given emergency condition are in many cases
predictable and therefore controllable Timely actions by plant personnel
can minimize the seriousness and duration of the incident Emergency
conditions require a coordinated effort using every safe and reasonable
control method at our disposal
(There is a potential for emergency
conditions to occur during electrical power failure For this reason, the
Vinyl Department has developed specific power failure procedures which are
appended as Attachment E)
06/22/90 Replaces 11/10/88
VSP Page 5
ABD00005737
IMMEDIATE ACTIONS - Continued
V Emergency Control - continued
This section of the plan is divided into the following categories
- Vapor Releases - Fires - Chlorine - Fire Protection Systems - Emergency Manpower
Emergency control responsibilities are'
Vinyl Supervisor - VCM tank farm, reactor and dryer areas, boiler house and lagoons
Compound Supervisor - All remaining areas
A Vapor Releases
Vapor releases of flammable compressed gases such as vinyl chloride or propane must always be handled as if an ignition could occur at any time Spills of other chemicals such as chlorine can be extremely dangerous and must be handled as instructed during utilities emergency training Actions taken to control a chemical vapor release should include
Control of Risks to Plant Personnel
- Activate emergency alarm
- Obtain necessary manpower (consider use of Emergency Organization)
- Minimize personnel in area - bystanders should be evacuated
- Use fire turnout equipment and Scott Air Paks as needed
- Avoid entry into explosive vapor-air mixtures
Protection Equipment
- Start deluge systems immediately
- Provide additional fire water using fire monitors to disperse liquid/vapor as needed
Minimize Release of Material
- Block m leaking equipment remotely first - then as close as safely possible
- Recover the material from the blocked in equipment if possible
06/22/90 Replaces 11/10/88
VSP Page 6
ABD00005738
IMMEDIATE ACTIONS - Continued
V Emergency Control - continued
Consider Community Evacuation
- If required, notify the Aberdeen Police Department at 369-6454
B Fire
Emergency personnel must evaluate the materials and circumstances involved in every fire. Liquid spill fires of flammable liquids like Methanol or gasoline should be put out Compressed gas fires (i e VCM or propane) can cause destructive space explosions if they are extinguished without shut-off of gas flow In these cases, it is recommended that the gas be allowed to burn itself out after blockin. Sound judgement by the Emergency Officer is critical to the safe control of any emergency
The specific action taken to control fires are the same as the controls listed for vapor release
C Chlorine
In the event of a chlorine leak, plant response must be directed toward
- Sounding the emergency alarm
- Stopping the leak safely
- Calling our supplier to obtain assistance in safe removal of the leaking container from the plant (or safely disposing of the contents)
- Community notification if needed
Thompson Hayward Chemical Company supplied our chlorine They will respond if requested to any chlorine related problem and want to be informed if and when we experience problems with their containers Whenever we have problems with ton tanks, they plan to respond as a matter of policy Their emergency telephone numbers are
Jackson, Ms Office (24 hr /day - using
answering service)
1-969-3177
Wayne Meyers (Vista Sales Contact)
1-373-4327
John Newman (Branch Manager)
06/22/90 Replaces 11/10/88
1-922-1219
VSP Page 7
ABD00005739
IMMEDIATE ACTIONS - Continued
V Emergency Control - continued
The guard can make the call He/she needs answers to the following questions before the call is made
- What is leaking9 Tank size and item that is the leak source
- How bad is the leak? Large/small, vapor/liquid, etc.
- Can we control with our emergency kits?
- When are they needed?
When the leak has been temporarily controlled with the capping kit, our preference is for them to take the cylinder to their filling plant in Memphis They will do this if it can be done safely If they feel that transporting the cylinder is not a safe approach, they will discuss other alternatives with the Plant Manager The seriousness of a chlorine leak can be reduced if the leak is on the liquid side of the tank by rolling the tank such that the leak is from the vapor side of the tank
D Fire Protection Systems
Deluge systems, fire monitors, hose stations, and other equipment have been installed throughout the plant to
- Eliminate ignition sources, - Cool equipment, - Dilute flammable vapors; and, - Remove heat from fires
The various fire protection systems can be started as shown below
Svstern
How Started
Reactor/VCM Compressor Shed Deluge Systems*
Manual
Automatic
Pull box station at deluge valve Control panel switch Flammable vapor detectors (reactor areas only) Fire (heat) detectors
Sphere Weir & Fire Monitors
Manual Automatic
- Air bottles-field - Local switch (Weir
only) - Control panel switch - Fire (heat) detectors
(Flammable vapor detectors)
06/22/90 Replaces 11/10/88
VSP Page 8
ABD00005740
IMMEDIATE ACTIONS - Continued
V Emergency Control - continued
D Fire Protection Systems - continued
Other fire monitors and hose stations are manual*
* Loss of pressure in the supervisory air system below 7 psig will cause the diaphragm bypass valve (control valve) to release the water trapped in the upper chamber of the deluge valve When this occurs, the pressure of the water from the fire water system will push the water out of the deluge valve's upper chamber causing fire water to flow automatically to the deluge spray piping system.
Deluge Systems - should be used for
- Serious leaks from rotating equipment seal
- Flammable material releases from valves, flanges, relief systems, or other process equipment NOTE Use caution when putting cold water on metal castings (i e compressors, vacuum pumps, Corken compressors) Thermal shock could fracture the case.
- Fires
Fire Monitors (stationary or portable) - should be used
- Where no deluge systems exist
- Where discharge is above the protected vessels' deluge spray nozzles
- To supplement deluge systems in areas of high heat or vapor concentration
Other Equipment
Additional fire fighting equipment is available to supplement fixed fire monitors and preconnected fire hose This equipment can be found in fire hose houses marked with a (-) and at the Vinyl area emergency equipment station
E Emergency Manpower
The objective of any plant emergency response is to control the incident without injury to personnel and minimal equipment damage In order to achieve this objective, the Emergency Officer must concentrate his attentions on
* Evaluating the nature and extent of the emergency
- Planning the plant response
- Determining manpower and equipment needs
- If appropriate, call out the Emergency Organization
- If needed, notify or request help from the fire department, police
department and/or hospital ambulance service
- Keep our neighbors in mind - evacuate them if appropriate
06/22/90
VSP
Replaces 11/10/88
Page 9
ABD00005741
IMMEDIATE ACTIONS - Continued
V Emergency Control - continued
E Emergency Manpower - continued
The basic emergency response guidelines are
1 Activate the plant emergency alarm from the control room as follows
- Turn on the emergency alarm for ten seconds - Reset the alarm - Announce the nature of the problem twice over the public address
and Gaitronics systems - The guard will announce the wind direction and speed after the
alarm announcements have been made
Any time the emergency alarm is sounded, all contractors and plant departments except compound, dry blend, and plasticizer will immediately follow the evacuation plan Compound, dry blend and plasticizer personnel will await instructions from their supervisor unless the emergency involves a fire In the event of a fire, all personnel should respond according to department fire procedures
Lab personnel should report to the lab when the alarm sounds Two lab personnel should be designated to respond to the vinyl control room as requested for first aid assistance All other Lab personnel should stay near the base radio to respond to needs for first aid
If the emergency is due to a fire, emergency crews are to follow departmental fire plans, obtain turnout gear and proceed to the upwind side of the emergency
2 Activate callout of the Emergency Organization if appropriate from the control room
A
Normal Office Hours
Announce
"Activate
Emergency
Organization" twice over the public address and Gaitronics
systems
B Back Shifts - Have control room personnel instruct the guard to call out the Emergency Organization per the call list (Attachment B)
3 Follow the Emergency Control Guidelines for fires and vapor releases, or personnel rescue
4 Initiate rescue response to locate personnel who were not accounted for during the headcount
06/22/89 Replaces 11/10/88
VSP Page 10
ABD00005742
IMMEDIATE ACTIONS - Continued
V Emergency Control - continued
E. Emergency Manpower - continued
5 Initiate rescue response for personnel known to be down in the area of the emergency if it is judged safe to do so by the Emergency Officer.
6 Take care of injured personnel - call in an ambulance to stand by if needed
7 Assist the Utility Technician as needed to control emergencies in the utilities area
8. Evacuate the plant and/or community if threatened with toxic concentrations of vapor or smoke or if a fire explosion potential exists which could impact the community
9 Determine the extent of contamination during vapor releases
During the emergency, this should be done with the Honeywell area
monitoring system During office hours, the Safety Supervisor
will make the determination
During back shifts, the Vinyl
Supervisor will make this determination using available manpower
VI Outside Assistance
Outside police, fire and medical resources should be utilized if needed The guard will call if requested
Aberdeen Fire Department
369-9551
Ambulance or
369-2455 369-9393
Aberdeen-Monroe County Hospital Emergency Room
369-2455
Dr R E Coghlan (Office) (Home)
369-2411 369-4418
Dr J N Turnage (Office) (Home)
.
369-2413 369-6311
Dr Arthur Brown (Office) (Home)
369-6977 369-9426
Aberdeen Police Department
369-6454
Guidelines for the use of the Aberdeen Fire Department are
- The Aberdeen Fire Department has agreed to provide assistance in the areas of manpower and fire water pressure boosting for handlines
06/22/90 Replaces 11/10/88
VSP Page 11
ABD00005743
IMMEDIATE ACTIONS - Continued
VI Outside Assistance - continued
The Emergency Officer is responsible for determining if fire department assistance is necessary to control a fire If he determines that they are needed, he must initiate the call by notifying the guard He must assign someone to meet the fire truck at the guard house The guard should be informed as to who has been assigned to meet the fire truck so he can tell the fire truck driver who to follow. The guard will hold the fire truck until the escort arrives Specific instructions should be given to the employee assigned to meet the fire truck so the route of travel and destination are understood. (A reactor Lead Operator can give these instructions to the fire truck driver on entrance road east of the control room ) After the instructions have been given to the fire department personnel, one of their initial respondents will return to the gate to guide additional fire personnel to the scene as a group
The Emergency Officer shall retain control of all fire fighting operations
Additional manpower from the fire department may arrive at the
plant in personal vehicles They should be allowed to pass
through any roadblock
They are to park in the employee
parking lot Fire department personnel are to assemble at the
gate and will be escorted to the fire location by a Vista
employee, designated by the Emergency Officer or the fire
department respondent Aberdeen Fire Department personnel must
be equipped with fire turnout equipment The Emergency Officer
must judge the needs and send firemen back if the turnout
equipment is inadequate
VII General Plant Evacuation and Community Notification
Vista Chemical Company will act as a responsible citizen of Aberdeen and notify the community of any toxic or flammable gas release, or fire that could pose a hazard outside the plant boundaries
The Emergency Officer must make an initial assessment of the emergency In this evaluation, two questions must be answered and actions initiated if appropriate
A Can the emergency be controlled with personnel currently m the plant' If not, notify the guard to initiate callout of the Emergency Organization as noted in Attachment B of this plan
B Can the gases or smoke and vapors enter other populated areas in sufficient concentration to be harmful' If other unit areas of the community can be harmed by the emergency, the following items must be considered
06/22/90 Replaces 11/10/88
VSP Page 12
ABD00005744
IMMEDIATE ACTIONS - Continued
VII General Plant Evacuation and Community Notification - continued
1 Wind direction and speed, 2. The size of the leak, release or fire, 3 Is the gas/smoke cloud dispersing or is it staying together and
headed for nearby unit areas or neighborhoods.
Sound judgement is of the utmost importance If the Emergency Officer or Emergency Crew Chief believes the decision to evacuate plant areas and/or notify community officials can safely wait until the Plant Manager or his designee arrives, he should do so If, however, there is a clear risk if the decision is delayed, paragraph B below should also be implemented The actions which follow any decision to evacuate down wind areas are
A Instruct the Vinyl Lead Operator to sound the evacuation alarms
(Gaitronics alarm for evacuation local to the plant, Gaitronics
and siren for conditions when harm can come to nearby
neighbors)
Plant evacuation instructions should reference
general plant areas to avoid confusion
B Instruct the guard to notify the police department
The guard should repeat the following message to the police department dispatcher*
"THIS IS(NAME), SECURITY GUARD AT VISTA POLYMERS THERE HAS BEEN A (FIRE. TOXIC GAS, FLAMMABLE GAS RELEASE AT THE PLANT YOU SHOULD INITIATE EVACUATION PROCEDURES (DIRECTION FROM PLANT) OF THE PLANT
INSTRUCT RESIDENTS TO LEAVE (ON FOOT, BY VEHICLE), OR STAY IN HOME AND CLOSE WINDOWS AND DOORS AND STOP AIR CIRCULATION"
C Instruct control room personnel to turn on the big siren
The City of Aberdeen has an evacuation plan
In order to
prevent exposure to people in vehicles passing by or traveling
into an emergency, roadblocks will be established as early as
possible in an emergency as manpower resources are available.
Plant salaried personnel will be issued to photo identification
emergency roadblock passes to allow them to respond to
emergencies at the plant
VIII RE-ENTRY TO WORK AREAS
Areas that have been involved in plant emergencies shall not be entered for the resumption of work until the area supervisor has verified the problem has been corrected, the area is free of hazards, and the "all clear" alarm sounded
06/22/90 Replaces 11/10/88
VSP Page 13
ABD00005745
EMERGENCY ORGANIZATION
Please refer to the attached EMERGENCY ORGANIZATION chart (Attachment A) for the following discussion When activated, this organization shall be directed by the Management Group, which bears overall responsibility for meeting the objectives of the plan
I Activation
The shift supervisor responsible for the area where the emergency occurs will become the Emergency Chief He is then responsible for all initial immediate actions which can include activation of the Emergency Organization to obtain help If the Emergency Organization is needed, it is activated as follows
Normal Office Hours - The Emergency Officer or Emergency Chief will have an announcement made over the public address and Gaitronics systems to "ACTIVATE EMERGENCY ORGANIZATION" The announcement and the specific assembly instructions will be given two times
Back Shifts - The announcement and assembly instructions should
be given as noted above and the guard should be instructed to
make the initial callout for the area involved
Once the
personnel from this callout arrive, they may request the guard
to call out additional specific personnel
All personnel
contacted for emergency duties should immediately report to the
plant to assume their emergency duties
The Acting Emergency Officer can request all announcements and callouts to be accomplished through the control room
II Emergency Organization Specific Duties
The following is a discussion of the specific duties assigned to each position in the Plant Emergency Organization
A Management Group
The Management Group will consist of the Plant Manager, the Plant Superintendent and the Employee Relations Director The Vinyl or Compound Operations Superintendent not serving as the Emergency Officer will serve as an alternate for a vacancy in the Management Group The duties of the Management Group are
1 Provide leadership for the Emergency Organization and coordinate all activities connected with control of the situation Three portable radios are designated for use in these situations They will be kept by the Plant Superintendent
2 Promptly release factual information to the news media in order to prevent erroneous reports
06/22/89 Replaces 11/10/88
VSP Page 14
ABD000U5146
II Emergency Organization Specific Duties - Continued
Management Duties - continued
3 Notify Corporate Management and keep them apprised on the situation
4 Notify next of kin in cases of serious or fatal injuries
5 Maintain close communication with the Emergency Officer
B Emergency Officer
The Operations Superintendent of the area affected will serve as the Emergency Officer. He will report directly to the Management Group and will be in overall charge of emergency control activities. He will be assisted in this duty by the Safety Director and the Chief Process Engineer The alternate to the Operations Superintendent is the Operations Supervisor of the area involved When the Operations Supervisor and Superintendent are both present, the Operations Supervisor will also act as an Assistant Emergency Officer The duties of this function are
1. Work closely with the Emergency Crew Chief in determining the most effective manner of establishing control of the situation
2 Keep the Management Group informed of the situation and the action being taken to bring it under control
3 Rely on the advice and help of the Assistant Emergency Officers and the Safety Director
4 Issue instructions for the "Call-Out" of off-duty employees and advise the Security Officer of who is authorized to enter the plant
C Assistant Emergency Officers
The Chief Process Engineer and Operations Supervisor will serve
as the Assistant Emergency Officers
They will assist the
Emergency Officer in the evaluation of the situation and the
planning of action necessary to establish control of the
emergency They will also provide any technical information
regarding the equipment of process that might be necessary They
will keep the Emergency Officer informed of their whereabouts at
all times Senior Process Engineers will serve as alternates to
the Assistant Emergency Officers
D Security Officer
The Safety Supervisor will serve as the Security Officer, and will report to the Management Group His specific duties are
06/22/90 Replaces 11/10/88
VSP Page 15
ABD00005747
II Emergency Organization Specific Duties - Continued
D Security Officer - continued
1. Provide security protection for all plant property and material This will include procurement and assignment of guards, as needed.
2. Dispatch personnel to the roadblocks so that authorized personnel may be identified and allowed into the area. Unauthorized personnel must be turned back in a firm, tactful manner.
3. Media representatives will be directed to the Management Group in the front office area as directed by the Plant Manager
4 Provide emergency supplied that might be needed during the emergency. This includes emergency arrangements to obtain diesel fuel for the fire pumps and emergency generators
5. Monitor VCM concentrations in the area of the secondary evacuation area southwest of the guard house In the event of high VCM concentrations, he shall direct personnel to a safe area along the highway If the gate area becomes unsafe due to hazardous chemicals in the air, he will direct the guard to move to the alternate evacuation gate at the east warehouse.
E Safety Director
The Safety Director will assist the Emergency Officer in controlling the emergency. His primary responsibility is in helping with fire fighting and rescue efforts He will work closely with the Emergency Crew Chief
Following an emergency, the Safety Director will assist Department Heads in restoring safe conditions throughout the plant. He will also see that emergency equipment is serviced and placed in the proper locations He will act as leader of a team appointed by the Manager to make a detailed study of the causes of the emergency, action taken, and any recommendations made to prevent similar emergencies
The Safety Director will also be responsible for the following areas of emergency preparedness
1. Review of the Fire Prevention and Emergency Plan on an annual basis.
2 Organize training programs as necessary to insure prompt and adequate response to emergencies in the following areas
06/22/90 Replaces 11/10/88
VSP Page 16
ABD00005748
II Emergency Organization Specific Duties - Continued
E Safety Director - continued
a Basic Fire Training All personnel who work in the plant operating areas will be given basic fire fighting training pertaining to the use of portable fire extinguishers, emergency alarm systems and evacuation procedures This will normally occur on an annual basis New employees will receive basic fire training within 120 days of employment
b Advance Fire Training All operating, mechanical and engineering personnel will be trained more extensively in automatic fire control systems, operation of the plant fire water system, fire fighting methods and basic fire theory
c First Aid Organize annual refresher first aid training of first aid personnel
d Mock Drills
Organize mock drills in which serious plant emergency
conditions are staged
The drills will include
notification of the Aberdeen Fire Department and Aberdeen
Police Department
A critique will be conducted
immediately following the drill All drills and critique
results will be documented and reported as necessary
For communication purposes, Walker Manufacturing will be
notified of drills
3 Emergency Crew Chief
The Vinyl Shift Supervisor will fill the position of the
Emergency Crew Chief during emergencies in the vinyl unit
areas, boiler house, waste treatment and VCM tank farm areas
The Compound Shift Supervisor will act as the Emergency Crew
Chief in the remaining areas The appropriate Chief will
direct the Emergency Crew and others involved in fire control
or other emergency action
He will work closely with
Emergency Officers and the Safety Director m the effective
use of manpower and equipment necessary to bring the
situation under control
The Emergency Chief will usually be the first individual in
authority to recognize the existence of an emergency
situation He must make the immediate decisions regarding
the emergency action and continue in this capacity until the
Emergency Organization can assemble, if required
The
Emergency Chief will initiate the actions to put this plan
into effect
Once the Emergency Officer arrives, the Emergency Chief will report to him
06/22/90 Replaces 11/10/88
VSP Page 17
ABD00005749
II Emergency Organization Specific Duties - Continued
G Assistant Emergency Crew Chief
The Compound Shift Supervisor will serve as the Assistant Emergency Crew Chief during emergencies in all areas of the plant, except Compound, Plasticizer, Laboratory, Office and Warehouse In those areas, the Vinyl Shift Supervisor will act as Assistant Emergency Crew Chief The Assistant Chief's duties will be as follows
1. Make sure that all of the Emergency Crew members in his area leave for the scene of the emergency.
2 Report to the Emergency Crew Chief for instructions
H Mechanical Chief
The Mechanical Superintendent will act as the Mechanical Chief
during the time of the emergency
The alternate is the
Maintenance Superintendent. In this capacity, the Mechanical
Chief will report to the Emergency Officer He will carry out
the following duties
1. Organize and direct damage control work as directed
2 He will be in charge of all personnel reporting to the shop area
3 Assist the Emergency Officer m any way necessary to bring the situation under control
4 Establish relations with outside utility companies and work closely with them, maintaining or restoring service as soon as possible.
5 Notify the Security Officer of the names of those people in the plant under his direction and of any who have been called out
6. Keep the Emergency Officer informed of his whereabouts at all times
7 Organize and direct clean-up and repair crews for the purpose of getting the plant safety back into operation as soon as possible
I First Aid Chief and Assistants
The Nurse will act as the First Aid Chief and will report to the
Emergency Officer
Laboratory "A" Technicians will act as
Assistants The alternate for the Nurse will be the Laboratory
Lead Technician
The laboratory personnel will assist the
Emergency Officer and/or the Nurse The duties of this function
are
06/22/90 Replaces 11/10/88
VSP Page 18
ABD00005750
II Emergency Organization Specific Duties - Continued
I First Aid Chief and Assistants - continued
1 The First Aid Chief will dispatch personnel to the emergency scene whenever the Emergency Organization is activated and there is a call for first aid help The remaining first aid personnel will report to the Lab office area (near the radio)
2 Give first aid to the injured
3 Advise the Communications Chief if ambulances are needed (Note An ambulance may be requested to stand by as noted in the Medical Treatment Section below)
4 Keep the Management Group and the Security Officer informed of injuries, including the names and estimates of severity
5 Accompany injured personnel being transported by ambulance
J Messengers/Escorts
The Messengers will report to the Emergency Organization member to whom they are assigned. The Mechanical Superintendent will assign Mechanical Engineers to the messenger positions as appropriate Process Engineers not assigned duties shall report to the Management Group
K Fire Pump Operators
Serious plant emergencies can require extended operation of fire
pumps
In order to meet this need, the first pumps will be
staffed using Mechanical Department personnel During normal day
operation, the Mechanical Superintendent will assign a mechanic
to report to the number 1 (north) pump house, and the Shift
Mechanic will report to the number 2 (south) fire pump house
Whenever the Shift Mechanic is the only employee available, he
will move back and forth between the two pump house buildings
during emergencies that do not involve the fire pumps, the
mechanics should remain in the shop
Normally, coverage is necessary at both pump houses anytime the Emergency Organization is called out The guard is to call out mechanics to fill the positions as rapidly as possible
The duties of the fire pump operator are
1 Monitor engine temperatures and oil pressures
2 Be alert for abnormal sounds and conditions
3
06/22/90 Replaces 11/10/88
Monitor fuel levels and alert the security officer (Alternate Safety Director) when fuel levels fall below 50 percent The Security Officer will then initiate procurement of the fuel
VSP Page 19
ABD00005751
II Emergency Organization Specific Duties - Continued
K Fire Pump Operators - continued
4 Monitor and report any abnormal conditions to the Security Officer (Alternate Safety Director)
Whenever there is no coverage by any of the above, the Dryer Lead
Operator or Reactor Lead Operator shall ensure that the north
fire pumps are operating
The guard can start the pumps
manually, if requested The Vinyl Shift Supervisor shall be
responsible for the shutdown of the fire pumps when any emergency
condition has been corrected
I Emergency Crews
There are two Emergency Crews The objectives of these are to insure that, through quick action, we will be able to protect employees and minimize any damage due to fire Both crews are to report to the announced location of the emergency when summoned by alarms, the Shift Supervisor, or when the Emergency Organization is activated The crews will consist of the following based on a Vinyl area emergency
Number 1 Emergency Crew
Emergency Crew Chief - Vinyl Shift Supervisor and personnel noted on Attachment A "Emergency Organization"
Number 2 Emergency Crew
Assistant Crew Chief - Compound Shift Supervisor and personnel noted on Attachment A "Emergency Organization"
The specific duties and responsibilities are discussed at length in the section entitled "Emergency Control" beginning on page five of this plan
M Maintenance Support Group
The Support Group will consist of all Maintenance personnel (supervisors and hourly) They will report to the Maintenance Shop and be under the direction of the Mechanical Chief The Maintenance Superintendent will stay in the shop with the personnel The Mechanical Chief will contact him to assign emergency duties to this group as needed
N Guards
The specific emergency duties of the Security Guard are
Direct ambulance and other vehicles to the emergency as noted in this plan using plant personnel as guides
06/22/90 Replaces 11/10/88
VSP Page 20
ABD00005752
XI. Emergency Organization Specific Duties - Continued
N Guards - continued
2 Stop all vehicle traffic into the plant anytime an alarm is sounded. Have the driver park without blocking the gate. Do not permit unauthorized personnel to enter the plant (See media response below).
3 Phone the Emergency Organization when instructed to do so by the Vinyl Shift Supervisor, the Compound Supervisor, and their designees (See Attachment B).
4. Monitor fire pump operation as noted in K above.
5. Record wind direction and speed, barometric pressure, time and outside temperature at the time of a gas release or fire.
6 Announce the wind speed and direction (i e from to ______________ _) over the plant public address system.
7 Receive all calls regarding the headcount status
This
information shall be reported to the Management Group.
(Alternate* Emergency Officer, Emergency Crew Chief)
8 Media Response - In a serious plant emergency, media personnel with either be calling in or coming to the gate Calls by the media on the telephone shall be handled by requesting the caller's name, who he/she represents, a phone number where they can be reached and a promise that the message will be given to the Manager or his designee The statement should also include the fact that either the Plant Manager or his designee will call them with a statement. Media personnel who arrive at the gate will be escorted by Vista personnel from the gate area to a pre determined location where the Manager or his designee will make statements
9 In the event the main gate area becomes unsafe because of smoke or high vapor concentrations, the guard shall open the east gate (Transportation Warehouse) for an evacuation exit
0. Communications Chief
The Director of Administrative Services will act as the Communication Chief His alternate will be the Plant Accountant The Security Officer will act as Communications Chief until the Director of Administrative Services or the Plant Accountant can be contacted and arrive In this capacity, he will
06/22/90 Replaces 11/10/88
VSP Page 21
ABD00005753
II Emergency Organization Specific Duties - Continued 0 Communications Chief - continued 1 Establish the gatehouse switchboard as an emergency and communications headquarters. An off-duty Security Guard will be provided to assist the Communications Officer 2 Handle all incoming and outgoing calls.
06/22/90 Replaces 11/10/88
VSP Page 22
ABD00005754
REPORTING REQUIREMENTS
All significant emergencies will be reported by the Plant Manager to the General Manager - PVC and VCM Operations within 24 hours For this reason, the Plant Manager must be promptly informed of any emergency incident. The guidelines for reporting emergency conditions are shown below.
I Fires
A Any fire which causes damage should be reported to the Plant Manager
B Any other fire incidents should be reported to the Plant Manager by the next workday after the fire
All significant fires will be thoroughly investigated by a team appointed by the Plant Manager A FIRE REPORT (Attachment C) must be completed as rapidly as possible
II Vapor Releases and Other Emergencies
A The Operations Superintendent will issue a written report on each VCM emergency as soon as possible, not to exceed 24 hours
B The Plant Safety Director or the Plant Superintendent will report VCM emergencies and the facts obtainable to the OSHA Area Director as required by OSHA regulations
C The Environmental Coordinator or the Chief Process Engineer will report VCM emergencies and the facts obtainable to the Mississippi Bureau of Pollution Control and/or the Environmental Protection Agency if required by regulations.
D The Environmental Coordinator or the Chief Process Engineer must be notified regarding any spill of a potentially hazardous material as soon as the spill is discovered He will promptly report the spill to the Superfund National Response Center if required by regulation
06/22/90 Replaces 11/10/88
VSP Page 23
ABD00005755
MEDICAL TREATMENT
Anyone who is injured during an emergency is to be treated promptly
Anyone who loses consciousness because of inhalation of any substance is to be taken to the Aberdeen-Monroe County Emergency Room as soon as possible In all cases, the treating physician must be given the chemical name of the agent (material) which is suspected of causing the injured person to be overcome Material Safety Data Sheets are available at the Aberdeen- Monroe County Hospital Emergency Room
If needed, the Aberdeen-Monroe County Ambulance Service may be requested to stand by at the plant to treat/transport personnel
EMERGENCY TELEPHONE NUMBERS
Medical
Ambulance, Monroe County Hospital Dr Coghlan, Office
Home Dr Turnage, Office
Home Dr Brown, Office
Home.
.
369-2455 369-2411 369-4418 369-2413 369-6311 369-6977 369-9426
Police
Aberdeen Police Department Sheriff's Office Mississippi State Police
369-6454 369-2468 (Contact Police Department)
Fire Department
Aberdeen Fire Department
369-9551
Light and Water Department
Aberdeen Light & Water Department or or
369-4731 369-2159 369-6454
Gas Company
Mississippi Valley Gas
961-6900
06/22/90 Replaces 11/10/88
VSP Page 24
ABD00005756
EMERGENCY NUMBERS - Continued
Headquarters Personnel
R D. Garablin, Office.
.
713-531-3586
Home............................................................................................ 713-531-0674
T. H. Huffman, Office...................................................................................713-531-3496 Home................................................................................................713-579-9832
M. S. Reynolds, Office................................................................................ 713-531-3210 Home............................................................................................. 713-726-0936
T. G. Grumbles, Office.................................................................................. 713-531-3445 Home ................................................................................... 713-445-4053
J. C Ledvina, Office
..
Home
.
...
...
.713-531-3446 713-879-8732
J R Drumwright, Office .
Home
.
... .. ............... 713-531-3444 . .................... 713-492-8449
06/22/90 Replaces 11/10/88
VSP Page 25
ABD00005757
ATTACHMENT A EMERGENCY ORGANIZATION
06/22/90 Replaces 11/10/88
VSP Page 26
ABD00005758
ABD00005759
ATTACHMENT B EMERGENCY ORGANIZATION LIST
06/22/90 Replaces 11/10/88
VSP Page 28
ABD00005760
Attachment B
Emergency Organization Call List
When advised by the Shift Supervisor, or his designee, the Guard will start calling the people listed below in numerical sequence (rank order) from the appropriate list.
Call Semience
1 2. 3 4. 5 6. 7 8
Vinvl
Rodger Collins 369-6184
John Olson 1-327-4356
Chris Markerson 1-840-7395
Paul Kober 1-328-0173
Jerald Uptain 369-8109
Jerry Roberts 369-7451
Steve Carroll 1-328-7811
Dean Honeycutt 343-5595
Comoound
Charles Worlow 369-8862
Steve Hillman 369-7892
Chris Markerson 1-840-7395
Paul Kober 1-328-0173
Jerald Uptain 369-8109
Jerry Roberts 369-7451
Utilities
Terry Noland 1-205-698-9568
Jimmie Autrey 1-328-2955
Chris Markerson 1-840-7395
Paul Kober 1-328-0173
Jerald Uptain 369-8109
Jerry Roberts 369-7451
Attachment B-l is a Secondary Call List The personnel to be called by the Guard will be identified by any of the above noted Emergency Organization respondents after they arrive on the scene
Effective date
February 23, 1995
Mechanical
Johnny Hull 343-8495
Dale Andrews 369-4582
Craig English 1-329-8766
Joseph Hegwood 1-356-4118
Michael Carter 1-680-4655
Sam Brown 256-8164
John Ray Hamilton 369-8290
Gilbert Morgan 369-6522
ABD00005761
Attachment B-l
Process Enoineerino & Environmental Ted Nickerson 369-9235 Veldon Messick 1-328-2474 Kenny Akins 1-327-3851 Reed Mackay 1-329-2533 Rory Sneed 1-329-2368
Lab
Amy Bagwell 369-4406
Richard Williams 256-3810
Charles Clark 369-6255
Administrative
Mike Swierc 1-328-5887
Tommy Cummings 369-6058
Joe Beall 1-328-1189
Janice Cullum 369-6768
Vinvl
Alton Reeves 369-4315
Billy King 256-7086
0 C Pace 256-3791
David Covington 369-7301
Mike Langford 256-7693
Comoound
James Howell 256-8991
Bill Davis 369-9181
Ronnie Gilreath 343-5406
Dave Gathings 343-5815
Effective date
February 23, 1995
ABD00005762
ATTACHMENT C FIRE REPORT
06/22/90 Replaces 11/10/88
VSP Page 31
ABD00005763
ABERDEEN CHEMICAL PLANT
FIRE REPORT
PART I. (To be filled in by Supervisor of area or activity involved) A.M.
-D---a--t-e----o---f----F---i-r-e-- -'-------------------------------------- --T---u--n--e--:----------------------------------,,P.Mw . Exact location of tire: _____________________________________________________ __
Equipment involved (tank no., pump no., name ot bldg., etc.)
How did the fire start?
How was the fire put out? __________ Description of personnel injuries: Description of property damage: _
What immediate action have you taken to prevent a recurrence?
Was fire protection adequate? ___________________________________________________ Estimate of damage: (A) 0 - $1000 (B) $1000-$15,000 (C) $15,000 + Production delays. ____________________________________________ _____________________
Signed DateSigned_Date
(Supervisor)
(Dept. Head)
PART II.
(Safety Department Review)
Remarks: ________________________________________________________________________
SignedDate (Safety Director)
PART III. Remarks .
(Management Review) _____________________________________________________
Signed DateSigned Date (Plant Supt.)
RETURN TO SAFETY DEPARTMENT
(Plant Mgr.)
ABD00005764
ATTACHMENT D DEPARTMENTAL HEADCOUNT PLANS
06/22/90 Replaces 11/10/88
VSP Page 33
ABD00005765
COMPOUND. DRY BLEND. PLASTICIZER EVACUATION PLAN
Non-Fire Emergency
The Shift Supervisor will be responsible for the headcount during a non-fire related emergency evacuation All personnel except the following will evacuate to the Primary Evacuation ARea (warehouse at northwest corner of the staging area directly south of the auditorium)
Line V Mill Operator Line I Mill Operator Dry Blend Compounder Line III Mill Operator Plasticizer Operator Shift Supervisor
The Shift Supervisor will take a headcount at the Primary Evacuation Area and
direct those personnel to evacuate as appropriate After he has reported his
headcount results to the guard, he will return to the operating area to assist the
above personnel in the shutdown of the process equipment
When shutdown is
complete, he will lead the evacuation of the above personnel and report headcount
results to the guard
In the event that the Primary Evacuation Area is contaminated, the alternate
evacuation site will be used The alternate evacuation area is the fence line east
of the parking lot and south of the guard house
If the alternate site is
contaminated, the personnel will move to a safe location along the property line
north of the plant
Fire Emergency
The Line I Mill Operator will be responsible for the headcount during a fire emergency The fire team from the Compound Department will consist of
Shift Supervisor - Team Leader Line III Compounder Dry Blend Utility Operator Line I Compounder Line I Utility Operator Automatic Bagger Operator Line V Compounder Line V Utility General Helper Assigned to Compound
Upon notification of a fire, each member of the fire team will report to the Line I mill area for headcount and assembly When the team has assemble/organized, they will depart for the equipment storage point or emergency location whichever is appropriate The Line I Mill Operator will report the results of the headcount to the guard
06/22/90 Replaces 11/10/88
VSP Page 34
ABD00005766
Fire Emergency - Continued
The following personnel will remain in the department to shut down the process equipment
Line I Mill Operator - Headcounter Dry Blend Compounder Line III Mill Operator Plasticizer Operator Line V Mill Operator
The Line I Mill Operator will lead the evacuation of the above personnel after all equipment has been shut down Normal procedure will be to evacuate to the Primary Evacuation Area, take a headcount and report as a group to the emergency scene Again, the headcount results must be reported to the guard
06/22/90 Replaces 11/10/88
VSP Page 35
ABD00005767
MECHANICAL DEPARTMENT
MAINTENANCE
Monday Through Friday. 7 00 A M to 3'30 P M
All Maintenance Supervisors, the Maintenance Engineer, and all hourly personnel will report to the Primary Evacuation Area (Maintenance Shop) The Maintenance Supervisor will be responsible for performing the headcount and will report the name of those individuals not accounted for to the guard
Headcount Backup
The Maintenance Engineer will be responsible for headcount should the Maintenance Superintendent not be available If both the Maintenance Superintendent and Maintenance Engineer are absent, the I&E Supervisor will be responsible for headcount
Evacuation Backup
The secondary evacuation point is the guard house and will be used in the event conditions make the maintenance shop unusable Should both the shop and the guard house become inaccessible, the east gate (by the drum storage area) will be used for evacuation
ALL OTHER SHIFTS
During all other shifts, Maintenance personnel (excepting the Shift Mechanic) will report to the guard house for headcount purposes, after reporting to the guard, the personnel will go to the Primary or Secondary Evacuation Points (described previously) until released When arriving at the plant, the Mechanical Chief will check the time cards to confirm the accounting of all personnel
UTILITIES
In all cases, the Utility Technicians will evacuate to the boiler house and notify the guard as to their location
CONTRACT PERSONNEL
Contract personnel will go to the Primary Evacuation Point and report to their
supervisor After reporting at his evacuation area, the Contract Supervisor will
consolidate the contractors' reports and report to the guard
The Senior
Mechanical Engineer will backup for these duties
Evacuation Area
Primary - Visitor parking area north of guard house
Secondary - East gate (by drum storage area)
06/22/90 Replaces 11/10/88
VSP Page 36
ABD00005768
LABORATORY
The Primary Evacuation Area for laboratory personnel is the radio area of the lab If this area is contaminated, lab personnel shall proceed to the guard house and assemble as a group Any visitors must be escorted to their point of entry to clear their name from the visitor log
WHEN THE EMERGENCY ALARM SOUNDS - All lab personnel are to assemble at the primary evacuation area for a headcount The Chief Plant Chemist will assign a laboratory technician to monitor the Honeywell VCM monitor in the laboratory Two personnel are to be available to be dispatched to the vinyl control room with the first aid equipment and the lab portable radio The remaining lab personnel are to remain near the radio for immediate dispatch as needed When an ambulance is needed, one of the lab personnel may be dispatched to the gate to escort the ambulance along a safe route to the scene
06/22/90 Replaces 11/10/88
VSP Page 37
ABD00005769
VINYL
Non-Vinvl Emergency
All personnel are to report to the Primary Evacuation Area at the concrete pad north of the Vinyl control room The Old Module Lead Operator will be responsible to account for all personnel. A status of all personnel will be given to the Vinyl Shift Supervisor as soon as possible with missing personnel reported to the guard
The people that are to report to this area are
Chief Operator Old Unit "A" Operator New Unit "A" Operator Dryer "A" Operators (2) Yard Operator General Helpers assigned to Vinyl Shift Mechanic (off-hours)
An alternative to reporting to the area would be to contact the Lead Operators by radio with the operator giving his position All operators must report either in person or by radio The Old Module Lead Operator will report the headcount results to the guard
After the headcount has been done, the Vinyl Emergency Crew will assemble to respond to the emergency
Vinyl Emergency
During an emergency in Vinyl, the Emergency Crew will assemble at the scene of the problem with the Vinyl Shift Supervisor reporting personnel status of the Crew to the Old Module Lead Operator The reactor "A" operators are to report m person to the Supervisor if the problem is m their unit, or in person or by radio to the Lead Operator if the problem is not in their unit
The Old Module Lead Operator will be responsible to account for all personnel All personnel not on the Emergency Crew are to report to the Primary Evacuation Area The only exception will be the reactor "A" operators as previously discussed The remaining personnel include
1) Yard Operators 2) General Helpers assigned to Vinyl 3) Shift Mechanic (off-hours)
The Yard Operator will escort outside truck drivers to the guard to clear their name from the entry log after all engines have been shut down for all non-yard related emergencies
In the case of an emergency in the VCM tank farm, the Yard Operator is to report to the Primary Evacuation Area to be counted and will then proceed to the tank farm
06/22/90 Replaces 04/01/89
VSP Page 38
ABD00005770
VINYL - Continued
Vinyl Emergency - continued
If the Primary Evacuation Area is declared unsafe, proceed to the Secondary Evacuation Area near the guard gate If the guard gate cannot be used (due to hazardous vapors), the east gate will be open for an evacuation exit.
Tornadoes
Tornado Alert or Watch
A tornado watch issued by the Weather Bureau warns that conditions exist for tornadoes to develop. The weather radio should be monitored closely if Monroe County is included in the watch area
Tornado Warning
A tornado warning is issued by the Weather Bureau after a tornado has been sited Once a tornado warning has been issued that includes Monroe County, all reactors are to be killed using normal kill procedures The possibility of a power failure will be large so preparation according to the Power Failure Procedures should be followed No reactor will be charged back until the tornado warning has been lifted
If a tornado is within sight of the plant with reactors not killed, use the emergency AMS system in the automatic mode Monitoring levels of AMS added will be of little concern. Secure the recovery systems and all fired equipment (dryers and incinerator) Evacuate personnel to a safe area away from the reactor areas
06/22/90 Replaces 04/01/89
VSP Page 39
ABD00005771
ADMINISTRATIVE SERVICES DEPARTMENT
This plan is intended to provide the guidelines necessary to
1 Assemble department personnel in the designated evacuation area,
2 Designate an individual responsible for performing and reporting the results of the personnel headcount,
3 Provide guidance to department employees on actions to take m response to emergency situations
An emergency situation is defined as, but not limited to, the following
1 Fire,
2 A release of toxic, flammable or corrosive materials, or,
3 Explosion
Emergency Action
In the event of an emergency situation, department personnel should take no action other than reporting to the situation to the Vinyl control room and clearing the area When clearing the area, care should be taken not to take any action which would impede the action(s) of emergency crews responding to the situation or which would endanger the health and safety of the employee or emergency crews Such action would include, but are not limited to
1 Failure to shutdown internal combustion engines or electrically powered operating equipment, or
2 Entering or passing through contaminated areas
Assembly
When notified that an emergency situation exists, department personnel are to assemble in the department evacuation area which is located
1 During normal working hours Beneath the canopied entrance to the main warehouse adjacent to the administrative offices
2 Outside normal working hours (after 4 13 p m , on weekends and holidays) At the main gate guard house
3 If primary evacuation area (1 or 2 above) is contaminated Along the fence east of the parking lost and south of the guard house If the guard house area is contaminated, the alternate secondary evacuation area is the east Transportation warehouse gate
06/22/90 Replaces 04/01/89
VSP Page 40
ABD00005772
ADMINISTRATIVE SERVICES DEPARTMENT - Continued
Assembly - continued
4 The Receiving and Warehouse leads are to escort outside truck drivers to the guard to clear their name from the entry log after all engines have been shut down
If further evacuation is necessary, personnel will be instructed to move to a safe location along the property line north of the plant
Personnel movement to an evacuation area should be orderly and by the most direct route available Car should be taken when approaching a contaminated area The rule of thumb is to move around the contaminated area at right angles to the prevailing winding keeping yourself between the wind and the source of contamination Wind direction may be determined by observation of the wind socks located atop silos 417 and 281 or slurry blend tank 502
Headcount and Reporting
Immediately upon reporting to the appropriate evacuation area, the Warehouse Purchasing Supervisor must commence a headcount of all assigned personnel After completion and reconciliation of the headcount, a report of all missing personnel by name(s) and the last known location(s) must be made to the security guard. In the absence of the Warehouse Purchasing Supervisor, responsibility for the headcount shall pass to the following personnel in numerical order
1 Plant Accountant
2 Stores/Supervisor
3 Materials Coordinator
Warehouse personnel working outside normal hours, on weekend or holidays will be counted by the lead warehouse person A report of missing personnel, of those reporting to work, will be made to the security guard as stated above
06/22/90 Replaces 04/01/89
VSP Page 41
ABD00005773
MAIN OFFICE PERSONNEL10
DURING REGULAR WORKING HOURS
Primary Evacuation Area Main Office Lobby
Secondary Evacuation Area
Guard House
HEADCOUNT
Responsibility
Primary
Senior Mechanical Engineer
Secondary Senior Process Engineer
The following will be accounted for
Production Schedulers Mechanical Engineers Process Engineers Drafters Environmental Coordinator Employee Relations Assistant Secretaries Visitors as noted in main office log book
The following other main office personnel have other responsibilities to attend to and the headcount will be made as part of the emergency organization
Plant Manager Plant Superintendent Employee Relations Director Vinyl Operations Superintendent Compound Operations Superintendent Mechanical Superintendent Maintenance Engineer
The Operations Engineers will report to their departments' evacuation area
OFF-SHIFT
All main office personnel and visitors must log in and out at the guard house The primary evacuation area for off-shift personnel is the guard house The guard is responsible for checking the log book and accounting for personnel during an emergency evacuation
(1) Includes visitors for which mam office personnel are responsible
All
visitors must sign in and out If during normal working hours at log book
m the lobby, if off-hours, at guard house Personnel on test runs will be
informed of evacuation responsibilities by the individuals responsible for
the test run
06/22/90 Replaces 04/01/89
VSP Page 42
ABD00005774
ATTACHMENT E POWER FAILURE PROCEDURES
06/22/90 Replaces 04/01/90
VSP Page 43
ABD00005775
POWER FAILURE PROCEDURES
I INTRODUCTION
When a power failure occurs, the first consideration is the in-plant personnel and secondly, to secure the plant When power is lost, the reactor agitators stop and cooling tower pumps and fans are lost This makes each reactor in the polymerization mode a potential runaway reactor where the pressure and temperature may rise significantly and uncontrollably Most power failures are of short duration (just a few seconds) but occasionally an extended power outage will occur All shift personnel must know what action to take in either situation. These procedures will be outlined in this manual along with steps to take once power is regained
II UNEXPECTED AND EXPECTED POWER FAILURE PREPARATIONS
Unexpected power outages are hard to plan for Preparations can be made for expected power outages that could result from the presence of threatening weather such as thunderstorms
A Weather Awareness - All operating personnel should be appraised of upcoming weather conditions There are two ways to do this The first is just looking at the cloud patterns and current conditions, the second is the weather alert radio monitor m the Vinyl Shift Supervisor's office which will sound an alarm as severe weather approaches our area The change of a power outage increases during thunderstorms and we should prepare ourselves accordingly
B Dress For the Occasion - If thunderstorms are approaching, operations
personnel should be prepared by getting rainsuits on in advance of rain
downpour
All Shift Supervisors, Chief Operator, and Reactor "A"
Operators should always carry a radio when outside the control room,
regardless of the weather All field personnel should have a flashlight
and a pair of channel locks
C Double Check Emergency AMS Systems - Prior to thunderstorms, all Emergency AMS Kill Systems are to be double checked It is important that these systems work when needed
D Preload Catalyst Bombs - Preload catalyst bombs of each reactor in polymerization mode with kill solution This will allow these reactors to be killed on a timely basis if the decision is made to kill reactors early
E Panel Operator Precautions - In the event of imminent severe weather, the panel operator in each module should take the following precautionary measures
6/22/90 Replaces 4/01/89
VSP Page 44
ABD00005776
II UNEXPECTED AND EXPECTED POWER FAILURE PREPARATIONS - Continued
E Panel Operator Precautions - continued
Normally kill any reactors which have been running at least four hours (three for D-700 and 745) These reactors will have a fair amount of resin conversion and will be one less reactor to worry about should a power failure occur
Do not charge any reactors back until the weather front has passed and charging is approved by the Shift Supervisor
If possible, hold an empty reactor in each module down and under a vacuum This will allow you to vent a reactor to another if necessary
Keep a mental track of which reactors would need to be killed first and keep your Shift Supervisor, Chief Operator, and Reactor "A" Operator advised of which reactors he will have to kill and in what order if the power does go out
F Reactor "A" Operator Stationing - As severe weather approaches, the "A" Operator for each module is to be stationed in that module and be prepared to manually kill reactors as necessary
G Shift Supervisor and Chief Operator Stationing - Shift Supervisors and Chief Operators should be in the control room or in their assigned module
Shift Supervisor - Old Module
Chief Operator - New Module
H Panel Operator Stationing - All panel operators should be at their respective panel station
I Yard Operator - As severe weather approaches, the Yard Operator should shut down all VCM unloading compressors and block in each liquid and vapor line Contact Shift Supervisor or Chief Lead after this is done
III WHEN THE POWER GOES OUT
Short Duration Outage - Most of the power outages at the plant are of short duration (a few seconds) Actions during this time period mainly involve restarting equipment (reactor agitators, cooling tower pumps and fans, incinerator, etc ) but do not normally require use of the emergency systems Panel operators should closely monitor each reactor during the time frame of the power outage and when power is restored to ensure that the agitator restarts, cooling water flow is re-established, and the polymerization reaction is under control Reactors can be bumped/killed with AMS using the normal injection system if needed
6/22/90 Replaces 4/01/89
VSP Page 45
ABD00005777
III WHEN THE POWER GOES OUT - Continued
B Extended Power Outage
a) Panel Operator Response
Reset all panel alarms
The dryer panel operator is to turn on the emergency power systems by turning on the toggle switch in the supply room for the emergency lighting generator and place the battery pack m emergency by throwing the switch into the "Emergency" position
The dryer panel operator is to be the timekeeper on how long the power has been out, and communicate this information with reactor panel operators
The reactor panel operators should relay the status and pressure of each reactor to the affected field personnel
Reactor kill guidelines during a power failure
Bump 5265/5305 batches using a manual mode of "AUTO" system
within thirty seconds after the power is lost
These
products run at higher pressures and an increase m pressure
in these reactors is more critical. Have Shift Supervisor
or Chief Lead check outage in AMS pots to verity addition to
reactor
You will have between one and two minutes to kill the remaining reactors All reactors must be killed within two minutes
Reactors which have run the longest and those just reaching heat-up will tend to run away first
Once a reactor starts to run away, it will become increasingly difficult to kill The reactor contents stop swirling after three to four minutes and AMS injection is much less effective at this time
The automatic kill system should be used in the "Manual" mode
to add short AMS injections to a reactor
The field
personnel should verify addition by monitoring the level in
the sightglass on the AMS Emergency Kill pots If addition
is not successful through the automatic AMS line, the manual
addition system should be used
The "Auto" mode of the automatic system should be used as a
last resort
If repeated short AMS injections are not
successful m controlling the polymerization reaction (in
conjunction with use of the Emergency Cooling Water System),
the "Auto" mode should be used which will inject the entire
AMS pot contents into a reactor
6/22/90 Replaces 4/01/89
VSP Page 46
ABD00005778
III WHEN THE POWER GOES OUT - Continued B Extended Power Outage - continued
a) Panel Operator Response - continued
After approximately five minutes (time necessary to activate the
Emergency Instrument Air System), the Emergency Cooling Water
System can also be used for reactor control
The Emergency
Cooling Water System supplies enough cooling capacity for one
reactor m each module Do not use the Emergency Cooling Water
System if there is inadequate firewater available to fight an
existing fire since the diesel pumps supplying emergency cooling
water also supply water to the plant's firewater system
Operating procedures for each reactor module are as follows*
New Module
1 Close CV-104 (New Module Recovery Cooling Water Supply Valve) by using the switch located on the new module recovery panel
2 Open CV-102 (New Module Emergency Cooling Water Supply Valve)
3 Open the cooling water control valve on the reactor condenser that is to be supplied with emergency cooling water Close off other cooling water control valves in the new module by placing the individual reactor cooling water flow controller in manual and setting the output at 0%
4 Emergency cooling water flow can be switched from one reactor to another by opening and closing appropriate cooling water control valves
Old Module
1 Open CV-101 (Old Module Emergency Cooling Water Supply Valve) by using the switch located on the new module recovery panel
2 Open the cooling water control valve on the condenser that is to
be supplied with emergency cooling water
(Close all other
cooling water control valves in the old module by placing the
individual reactor cooling water flow controller in manual and
setting the output as 0%)
3 If cooling water is needed for D-300 and D-400, open CV-103 (Emergency Cooling Water Supply Valve for D-300/D-400)
6/22/90 Replaces 4/01/89
VSP Page 47
ABD00005779
III WHEN THE POWER GOES OUT - Continued
B Extended Power Outage - continued
a) Panel Operator Response - continued
Old Module - continued
4. Emergency cooling water flow can be switched from one reactor condenser to another by opening and closing the appropriate cooling water control valves
Switches for major equipment such as recovery vacuum pumps and compressors, charge pumps, etc should be switched off to minimize a potential power surge when power is regained
If power is lost during a charge, take all pumps out of "AUTO" position or charge will restart when power is restored
C Reactor "A" Operator Response
If you are not on top of the reactors when the power goes out, you should go there immediately The only exception is if the Shift Supervisor determines that the weather is too severe for the Reactor "A" Operator to safely climb to the top of the reactor structure The reactors will be killed using the "Manual" mode of the automatic AMS Kill System This mode allows for short AMS injection through the automatic kill line
The 5265 or 5385 batches running will be bumped with AMS during the first thirty seconds of the power failure by using the "Manual" mode of the automatic AMS injection valves for two seconds or until the Shift Supervisor or Chief Operator give instructions to close the valves
The Shift Supervisor or Chief Operator will be stationed at the base of the reactor and will check that the AMS pot level has changed
When all reactors have been killed and are under control, assist the Shift Supervisor or Chief Operator in putting the duraseal systems on nitrogen, blocking in the mechanical seals on the recovery vacuum pumps and compressors, blocking in the VCM charge pumps, block m stripping steam supply to each reactor and to batch water strippers, and block in steam supply to blowdown tank Monitor the nitrogen pressure on the duraseal systems If the pressure does not hold, it will be necessary to block in the reactor seals
6/22/90 Replaces 4/01/89
VSP Page 48
ABD00005780
III. WHEN THE POWER GOES OUT - Continued
D. Shift Supervisor and Chief Operator Responsibility
If you are not at the base of the reactors when the power goes out, go there immediately
Shift Supervisor - Old Module
Chief Operator - New Module
You will be responsible for monitoring the pots and making sure AMS gets in when the panel operator kills a reactor.
The panel operator directs reactor killing from the control room. The Shift Supervisor may elect to kill reactors earlier at his discretion if in his judgement the situation is serious enough to do so
When all reactors have been killed and are under control, assist the
Reactor "A" Operator in putting the duraseal systems, blocking
nitrogen, blocking in the catalyst injection systems, blocking in the
mechanical seals on the recovery vacuum pumps and compressors,
blocking in VCM charge pumps, block in stripping steam supply to each
reactor and to the batch water strippers and block in steam supply
to blowdown tank Monitor the nitrogen pressure on the duraseal
systems
If the pressure does not hold, it will be necessary to
block m the reactor seals.
The first responsibility of the "A" operators assigned to drier room is to start-up the Emergency Instrument Air System as soon as possible. The reactor panel operators cannot use the Emergency Cooling Water System until instrument air pressure is established. Cooling water is essential to reactor control. Start-up procedures for the Emergency Instrument Air System are as follows
1. Check to see if the generator is operating. The generator should start automatically on power failure. If the generator is not running, make sure the starting mode switch on the generator's control panel is in the "Auto" position. If the generator still will not start, check the trouble indicating lights on the generator's control panel to determine the problem
2. Close the chain operated 3" cooling water valve located under walkway west of the Deltech building
3 Start the sump pump supplying cooling water to the Joy reciprocating air compressors and Deltech air dryer. This pump is the east - most pump on the north side of the chiller building
6/22/90 Replaces 4/01/89
VSP Page 49
ABD00005781
III WHEN THE POWER GOES OUT - Continued
D Shift Supervisor and Chief Operator Responsibility - continued
4. Start the Deltech air dryer by pressing the local "Start" button
on the dryer's instrument panel If the dryer does not start,
press the "RESET" button on the instrument panel and then the
"START" button.
If the dryer does not start, start air
compressors.
5. Start either no. 8 or no 9 compressor, located northwest of the Deltech building, by pressing the local "START" button.
6 After the compressor has started and the air system pressure has risen to at least 40 psig, notify the vinyl control room that the Emergency Air System is operating and that the Emergency Cooling Water System can now be used
After the Emergency Instrument Air System has been started up and instrument air pressure has been established, the dryer "A" operators should then block in all blend tank aeration lines. This will prevent slurry from backing into the air lines. Also close slurry supply valves from each blend tank
E Yard Operator
Lock out silo unloading valves to prevent valves from operating
IV WHEN THE POWER COMES ON
A Panel Operator
Check with Shift Supervisor, Chief or "A" Operator to see if duraseal units and mechanical seal purge water pumps have been restarted and that duraseal and lip seal flow to each reactor seal has been established If so, restart agitators
The dryer panel operator should turn off emergency lighting generator and reset battery pack power to normal mode
Set up cooling water system to normal operating position by opening/closing Emergency Cooling Water valves
B Reactor "A" Operator
Set up reactor agitator seals to normal operating position Restart duraseal units and check reactor seals
Set up the VCM charge pumps to normal operating conditions
Set up mechanical seals on the recovery vacuum pumps and compressors to normal operating conditions
6/22/90 Replaces 4/01/89
VSP Page 50
ABD00005782
IV WHEN THE POWER COMES ON - Continued
B Reactor "A" Operator - continued
Check all catalyst ram valves to be sure all are closed and then set up injection systems to normal operating positions. The "RESET" switch must be depressed before the ram valve will operate
Measure and record outage in each of the AMS kill pots Relay this information to Shift Supervisor or Chief Operator Refill each pot to proper level
C Shift Supervisor and Chief Operator
Restart cooling tower pumps and fans
Restart the incinerators
Contact Reactor "A" Operators for outages in each AMS kill pot
Reset deluge diesel fire pumps
Once the threat of power outage has passed, instruct utility operator to return instrument air system to normal operating positions The utility operator should also be told that the cooling water system has been returned to normal so that he can start chemical treatment of the water to prevent possible scaling in heat exchangers and condensers
D Dryer "A" Operator
Once air pressure has been re-established, set up blend tank aeration
Flush slurry lines
Restart all equipment, one dryer line at a time
Empty cones on fluid bed
Once the power outage has passed and all systems have been returned to
normal, the decision must be made as how to process the emergency killed
batches
Accurate outages from all AMS kill pots are essential in
determining what steps to take
The Vinyl Operations Supervisor or
Superintendent will make the decision as to how each batch is to be handled
6/22/90 Replaces 4/01/89
VSP Page 51