Document 4vnDe3ymvKRJowmpK099YK1BV

0 @'S"B @ 0 0 0 Aroclor: Logical Capacity Increase personnel!W. B. Johnson, M. Magnetti (W. F. Taffee) problem! Aroclor production will not be capable of meeting the demand In 1964. The latest five-year sales forecast for Aroclors Indicates that the total Monsanto, national, Aroclor manufacturing capacity will be Insufficient in 1964. A deficit of 4.6M lbs. in 1964, 10.2JI lbs. in 1965, 14.6M In 1966, 18.8FT in 1967, and 22.4M lbs. in 1968 will exist at present production levels. This report outlines proposals to Increase Aroclor production capa city at W. G. Krummrich in two phases or steps as summarized on pages 4 and 5 to help off-set this deficit. The proposals are based on studies and plant tests which are currently continuing. Estimated savings (B.T.) will be $106,000/yr. for phase I and $70,000 for phase II which gives a grand total savings of $176,000/yr. The major part or $170,000 of the $176,000/yr. savings is based on the reduction of manufacturing costs by an increased devisor. The .savings are dependent on increased sales, but no claim is made as to new earnings or increased sales. The recovery of the chlorinator off-gas carry-over material will save at least $6,000/yr. to Dept. 246, Aroclors. It is estimated that $12,000/yr. additional savings can be realized at W. G. Krummrich if the off-gas quality is improved. This estimate is based on downtime and expenses of other departments resulting from contaminants in the off-gas system. Production of Aroclor at W. G. Krummrich can be increased from 20.4 M lbs/yr. to 28.65T lbs/yr. in phase I and from 28.6 to 35.4M lbs/yr. in phase II to give a grand total of 15W lbs/yr. The cost will be $88,000 new capital and $43,000 expense for phase I. The cost of phase II will be $53,000 capital and $19,000 expense to give a grand total of $l4l,000 capital and $62,000 expense or a $203,000 expen diture. This represents a 4o# overall department increase in phase I and a 33# increase in phase II or a total of 73# increase tfO K #00 0361331 TOWOLDMONOQ57669 91370:2849 (l) -2- September 4, 1963 without any additional labor force. The savings were calculated by com paring the actual current Aroclor manufacturing costs at the maximum rate of 20.4in_lbs/yr. to the estimated costs at the proposed rates of 28.6m lbs/yr. and 35.4m lbs/yr. This comparison Is found on page 7 in the appendix. FUTURE WORK Further PTS work will continue on production rate and quality problems. Work on the expansion of Aroclor capacity will also continue. W. B.l/Uohnson Plant Technical Services /me 036133P TOWOLDMON0057670 91570:2849 (1) -3- September 4, 1965 DETAILS Aroclors are produced at Anniston and W. G. Krummrlch by chlorinating bi phenyl and polyphenyls. Only liquid Aroclors are produced at W. G. Krummrlch. Biphenyl Is first chlorinated to make crude Aroclor. Crude Aroclor Is air blown, distilled, earth treated, filtered, and stored as finished product. Several special Aroclor blends called Pydrauls and Pyranols are made at W, G. Krummrlch. There are five chlorlnators, 2 blow tanks, and 2 stills at W. G. Krummrlch. The chlorinating and storing steps are limiting production at the present time. The stills and other major equipment are capable of handling an in creased load with a few minor alterations and/or repairs. Present storage capacity is limited and requires careful scheduling, and would not be ade quate to handle the increased load. Studies and tests indicate the present Aroclor production rate at W._G. Krummrich can be increased in the first phase from 20.4m lbs/yr. to 28.6m lbs/yr. l^ie rate can be increased from 28.6M lbs/yr. to 35-4FT lbs/yr. in the second phase, and with substantial savings over-all. The present average production cost is about $6.78/cwt of product. This cost will be reduced to $6.43/cwt with a savings of $0.35/cwt by increasing production with the same work force. The annual savings expected in phases I and II on 28.6W lbs/yr and 35-4FT lbs/yr of Aroclor produced is about $100,000 and $70,000 to give a total of $170,000 as tabulated on page 7 in the appendix. Detailed on page are the figures showing a savings of at least $6,000/yr. resulting from the recovery of chlorlnator off-gas carry-over material. This carry-over problem will be even more critical as chlorinating rates E\re increased. The equipment to solve this problem of poor quality off-gas should be installed immediately, since other departments are suffering downtime and other expenses amounting to approximately $12,000/yr. due to HC1 gas line pluggage problems. The total installation and alteration costs to achieve a 40$ production rate increase in phase I will be $131,000 and to achieve a 33$ increase in phase II will be $72,000 making a grand total of $141,000 capital plus $62,000 expense or a $203,000 expenditure. This project summary of items, costs, savings, capacities, and dates is on pages 4 and 5- 0361333 TOWOLDMONOQ57671 1. Chlorinator . off-gas carry-over W. G. Krummrich Aroclor Expansion Project Summary Phase I $ Cost C - capital E - Expense Annual Savings $ B.T. Capacity Increase lb/yr Project Submitted Date Design Completed wks after 8.000-C 2.000-E $6,000 11/1/63 6 0 2. Intermediate crude Aroclor storage. 3. Chlorinator cooling 18,000-C 8,000-E 25.000-C 20.000-E 8.2M b. Chlorinator specific , gravity recorder ?,ooo-c 2,000-E 100,000 Chlorine gas controls 57^o-c 2,000-E b. Chlorine gas supply 1.000-c 4.000-E 7. Product storage 207000-C 5,000-E TOTAL PHASE I $a,ooo-c 43,000-E $106,000 8.2M Total Aroclor Capacity Will Be SO.4 8..2 = 28.6m lbs/yr. 9-23-63 10-1-63 10-15-63 10-23-63 11-1-63 11-1-63 6 6 6 6 6 6 Redesign chlorinator off-gas system to recover carry-over and improve quality of the off gas. poor quality off-gas costs Dept. F-218 and 217 approxi- .. mately $12,000/yr in repairs and downtime. Need additional capacity to "age" crude Aroclor, conse quently improve quality. Redesign and install better chlorinator cooling facilities to increase production. Air cooled heat exchanger successfully demonstrated on one chlorinator. Install sp. gr. recorder to lighten work load of present labor force so that no addi tional labor force will be needed. Install automatic chlorine gas control to chlorinators to in crease the product output. Chlorine gas supply must be in creased if the product output is increased. Product storage is tight now, and more will be needed as pro duction is increased. m*> tt o TOWOLDMONOQ57672 Phase II Item 1. Car loading facilities 2. Drum-off station y. Still Jets Still Capacity b. Product Storage b. Topping Still $ Cost C - Capital E - Expense 2.000-C 1.000-E ?700CM3 2,000-E b,OOO-C 2,000-E 20,000-C 5,000-E 20,000-C 5,000-E b,000-C 4,000-E Annual Savings $ B.T. 70,000 Capacity Increase Ib/yr. Project Submitted Date n-1-63 Design Completed wks after approval 8 n-15-63 8 6.8M , n-15-63 n-25-63 8 6 12-1-63 12-15-63 8 10 TOTAL PHASE II GRAND TOTAL bb,ooo-c 19,000-E i4i,ooo-c 62,000-E 70,000 $176,000 6.8m 15-OM if' Remarks 0 Install facilities to load rail cars. Production increase will make this necessary Up-grade.present facilities to drum product without an increase in labor.' Redesign jet system to the increased load. Distillation step is limiting, hence, redesign to increase output. Therminoi heating will be considered An increase in production will mean a need for more storage capacity. Estimated sale of 1.0M lbs/yr. of Aroclor can be had by meeting cus tomer specs which can be met by the use of a topping still TOTAL AROCLOR CAPACITY WILL BE 28.6 t 6.8 = 35.4m Ibs/yr. TOWOLDMONOQ57673 91370:2849 (l) -6- September 4, 1963 Discussion of Items 1. Tests have been run which indicates that at least $6,330/year*are lost by carry-over from the chlorinator off-gas system. An average of 30 gal. a day is lost and biphenyl costs $0.067/lb. 30 gal/day x 9 lbs/gal x $0.067/lb x 350 days/yr = $6,330/yr. With a 95$ recovery a savings of $6,000/yr would be realized. Poor quality off-gas (contaminated) from the chlorinators last year caused $10,000 downtime in Depts. F-218 and 217. This is based on the cost to buy chlorosulphonic acid. $2,000 was spent in cleaning the plugged line to the Dept, to give an over-all cost of $12,000 which can be saved. 2. Limited plant tests show the Aroclor quality can be improved by aging crude Aroclor prior to distillation. Two 10,000 gal. tanks will be needed due to the frequent change of products, usually every 3 days, to prevent excessive downtime. 3. The major factor that is limiting present production at the chlorinators is the inadequate cooling capacity. With an Increase in cooling rate the chlorinating rate can be increased proportionally. The cost of Increasing the cooling capacity would be $45,000. An air-cooled heat exchanger has been installed on #5 chlorinator. The capacity of this chlorinator has been Increased by at least 4o# as shown by current data on page 8 of the appendix. 4-6 Some piping alterations will be necessary to increase the chlorine supply to the department. Installation of automatic chlorine flow rate control and specific gravity recorders will be necessary in achieving-at least a 40$ department production Increase with the existing labor force. The cost of this phase is $25,000. 7. Storage for the many different Aroclors, Pydrauls, and Pyranols is real tight at present. Careful scheduling and the use of rail cars will have to be employed with one additional storage tank in order to handle the storage problem. This tank will cost $25,000. The engineering time and the Installation time will take about 4 months. The production rate will be reduced only 4o# for about 2 months. The changes can be made in steps or increments as desired. The present and proposed cycles on major department equipment are tabulated in the appendix on page 8. APPENDIX The following is a detailed breakdown on the savings calculations and the equipment cycles. These cycles allow 1/2 hours to charge and 1/2 hour to discharge the chlorinators as well as 1-1/2 hours to drop still bottoms. The cycles on the stills we figured on a basis of 22 chlorinator batches to a still-bottom drop. The capacity of the stills was figured at about 3,000 4,000 lbs/hr. All other equipment cycles are not important in affecting production rates. 0361336 TOWOLDMONOQ57674 91370:2849 (1) -7- September 4, 1963 * Cost Standard on 1254 Aroolor Revised Jan. 1, 1963 Production Bracket Item Raw Material Total Dir. Conv. depreciation T tal Ind. Conv. F.I. Exp. 1 xnu. Total Prod. Cost Cost per lb Aroclor 1,700,000 lbs/mo. Present cost $91,069/mo. 19,310 2,06l 2,898 $115,338/mo. $0.06785 2,380,000 lbs/mo. Proposed cost $127,500/mo. 19,828 2,711 3,018 2,950,000 Proposed cost 158,000 20,906 3,256 3,119 $153,057/mo. $0.06430 $185,28l/mo $0.06280 Savings per year: $0.00355/lb Aroclor x 2,380,000 lbs/mo x 12 mo/yr = $101,500/yr. $0.00505 x 2,950,000 x 12 mo/yr,, = $170,000/yr. * The Cost Standard for 1254 was used because a check of 2 years of cost sheets showed the average cost was $0.067/lb. The 1254 standard was $0.0678/lb or a conservative average. Also the cost of producing 1242 Aroclor Is $0.072/lb and 1260 Is $0.065/lb. An Aroclor average mix would be $0.0685/lb. Aroclor production Is currently running about 30# of 1242, 25# of 1248, 20# of 1254 and 25# of 1260. 036133? TOWOLDMONOQ57675 Equipment Cycles at 2.38W lbs/mo. 100# On Stream Time Equipment Cycles Ea. Chlorlnator cycle Ea. Still Cycle (22 chi. batches) 1242 1248 1254 1260 2.5 batches/ 2.34 bat/day 1.95 bat/day 1.76 bat/day day 43 hr/bottom 45 hrs/bd drop 54 hrs/bd 60 hrs/bd Ea. Chlor. cycle Ep. Still Cycle Aroclor Production 2.75 b/d 2.55 b/d 38.7 hrs/bd 40.5 hr/bd 2.l4 b/d 49 hr/bd 1.95 b/d 54 hrs/bd Chlor. Batches Current #5 Chlorlnator with Air cooled H.E. Aroclor Production 7.6 hr/batch 8.2 hr/batch 10 hr/batch 11.6 hrs/batch Average 6 hrs/batch Average 14.5 hrs/batch 0361338 TOWOLDMONOQ57676