Document 4vmvnYE91wJ4rqmJ9Ng9NVzwV

BASIC APPLICATION SECTION 4 DUAL-TEMP EQUIPMENT & DUCTWORK Page 10 V) FLAT VESSEL HEAD INSUL. (cont'd.) 4A1V5 The application shall start at the end of the center line where the insul-pin marking begem. The blocks must be kept square to the center line to maintain adequate pin support of the blocks. All contact surfaces of the blocks (insul. to head and insul. to insul.) shall be buttered with 41-99 P.V.A. mastic. 4A1.6 If the insulation has not been precut in the shop to fit the head, each course of blocks shall be started in the middle of the head and completed before starting the next course.