Document 4vg9J9D3e8k7k3BDVLQY15NGR

F. i ! '!I I ans PLAINTIFF'S EXHIBIT DUP-2313 J. J. NACZI R. C. REBER - F. W. MAY J. M. RINGEL W. H. ZANE D. SOURS - RICHMOND CONSTR. A. F. MC ELWEE - BEAUMONT CQ85T J. L. DE HAMM t- ' " CENTRAL FILE " " MARCH 25, 1968 TO: FROM: W. J. JOHNS SUPVR. POWER ENGR. ATTENTION: R. C. AUER W. S. BRIGGS - R. L. MOONEY, JR. SUBJECT: CONSTRUCTION - BEAUMONT PROJECT 3815 - METHANOL Regarding letter dated February 26, 1968 from W. L. Johns - R. C. Auer to J. C. Besperka in relation to insulation specification -- Paragraph 2 of letter states that aluminum jacketing will be held in place with "Type 304 S/S Bands". "No screws or rivets are to be used. The purpose for restricting the banding material is to assure that, in the event of fire, the banding will not be destroyed, with consequent loss of jackets and insulation." The melting point of 3003 or 5005 alloy aluminum used for jacketing is between U70F and 1210F. Most industrial fires exceed this temperature and the jacketing will melt between the stainless steel bands. The basic insulation is held on with stainless steel wire and should not come off. Fire fighting at Beaumont is done with foam, powder, or fog nozzles; the only time a straight stream would be used would be for cooling down a vessel. Theeefore, damage to insulation due to hose play would be negli gible. The use of S/S or any type of strapping would greatly increase the cost of securing the jacketing and no appreciable gain would result. Based on the CCE, there is approximately 24,000 L.F. of pipe to insulate. A band would be required on approximately 9" centers for a total of 32,000 bands. Using 9.5" as average O.D. it would require ?,150 lbs. of S/S bands at 69 cents a pound for a total of $1,480.00. 32,000 S/S clips at $18.50 M for 434.00 32,000 bands at .25 labor fab and installed 8.000 9,910 oo --o1. a> DU 051096 rmMMiMMiiiatii 15-j; :OMt a i. .jaaiUisria&iHis 2- - Screvs are applied mechanically here at Beaumont with a true torque- automatic screw driver at a cost of - 2 cents a foot for a total of 72,000 screws at 3.95 per M 480 Labor 275 Material .. 755 Total Bands Screws $9,110 755 $9,155 Sabings The possibility of corrosion around the screws has failed to materialize here at this site. We have used screws exclusively over calcium silicate for the past two years. P0p4.ri.vets were used to some extent on the Acrylonitrile unit which has been installed for six years. A recent examination of the metal applied over "Unibestos" showed no corrosion of the aluminum.jacketing at the rivets The CCE is largely based on calcium silicate, and has the advantage of bet ter compressive strength than "Unibestos" - C.S. 60 lbs. per sq. in. at 5Z deformation vs. 27 lbs. per sq. in. at 10Z deformation - Dry, and does not need a special high density insert at-hanger locations. A list of comments on C.S. "Unibestos" is enclosed. There is a potential savings of $6,000 by suing Code 102.1. Since the CCE is based on calcium silicate as well as aluminum-, I recommend that -we take advantage of these savings. RLM/ja Enclosure DUP 1008017 DU 051097