Document 4vdyz94BXGYBmwwNNM7bGQbra
From: Sent: To: Subject:
Peele, Nancy Tue, 11 Mar 2025 18:44:17 +0000 Meachum, Pete (OST) FW: Rep. Westerman (AR)- White Rock Mountain road repair (follow up)
This email originated from outside of the Department of Transportation (DOT). Do not click on links or open attachments unless you recognize the sender and know the content is safe.
From: Dean, Heather (FHWA) <Heather.Dean@dot.gov> Sent: Monday, March 10, 2025 3:34 PM To: Bolin, Miles <Miles.Bolin@mail.house.gov>; Peele, Nancy <Nancy.Peele@mail.house.gov> Cc: Lomax, Brian (FHWA) <Brian.Lomax@dot.gov>; Guendert, Zan (FHWA) <zan.guendert@dot.gov>; French, Maureen (FHWA) <maureen.french@dot.gov> Subject: Rep. Westerman (AR)- White Rock Mountain road repair (follow up)
Good afternoon Miles,
Per our chat, below is a more comprehensive list of what would be included in the advertisement documents.
Let me know if you would like to discuss.
"Completion of construction advertisement documents" involves preparing and compiling a comprehensive set of materials essential for advertising a construction project to potential bidders. The following documents are typically included in the package issued to potential bidders: o Pre-Solicitation Information: Overview of the project and bidding process issued prior to the formal solicitation. o Plans: Engineering drawings o Special Contract Requirements: Project-specific specifications and conditions. o NEPA_Categorical Exclusion: Environmental Compliance. o Permit Tracking Form: List of required permits with associated expiration dates. o Government Furnished Information: Including Permits, Geotechnical Report, and Hydraulics Report o Instructions to the Bidders and Bid Schedule o Construction Schedule: Anticipated construction duration.
The following documents are prepared for the advertisement for the evaluation and management of the bidding process but are not disclosed to the bidders. o Engineer's Estimate: Independent Government Estimate (to be used as a benchmark for evaluating bids). o Mailing List, Acquisitions Plan, Incentive Spreadsheet, and other documents
OST-2025-1200 Page 02984
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0028694
Thanks,
Heather Dean Simei Congressional Affairs Team Leader Office of Policy and Governmental Affairs Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 E83-303 (b)(6)
From: Dean, Heather (FHWA) Sent: Thursday, February 13, 2025 3:59 PM To: Miller, Murray <Murray.Miller@mail.house.gov>; Conner, Jackson <Jackson.Conner@mail.house.gov>; Peele, Nancy <Nancy.Peele@mail.house.gov>; Bolin, Miles <Miles.Bolin@mail.house.gov> Cc: French, Maureen (FHWA) <maureen.french@dot.gov>; Guendert, Zan (FHWA) <zan.guendert@dot.gov>; Lomax, Brian (FHWA) <Brian.Lomax@dot.gov>; Rusnak, Allison (FHWA) <Allison.Rusnak@dot.gov> Subject: Rep. Westerman (AR)- White Rock Mountain road repair
Good afternoon all,
WHITE ROCK MOUNTAIN ROAD & EAST FLY GAP ROAD (AR)
DESCRIPTION: Multiple landslides from rainfall events in 2020, 2021 and 2022 have affected White Rock Mountain Road (FR-1003) on the Ozark -- St. Francis National Forest in Arkansas. In spring 2022, a rainfall event damaged the western section of White Rock Mountain Road and the East Fly Gap Road (see attached location map). The resulting roadway and landslide damage repair costs are eligible for Federal Highway Administration's (FHWA) Emergency Relief for Federally Owned Roads (ERFO) funds. The FHWA Eastern Federal Lands Highway Division (EFLHD)'s White Rock Mountain Road and East Fly Gap Road project ("the project") will consist of the following:
1. reconstruct approximately 380 feet of White Rock Mountain Road with a 6-inch gravel surface and an embankment system, replace a culvert, recondition the road and ditch, and reconstruct the aggregate pavement structure.
2. reconstruct and realign approximately 700 feet of East Fly Gap Road, using a 6inch gravel surface and an embankment system.
LOCATION AND CONGRESSIONAL DISTRICT: Ozark -- St. Francis National Forests, Franklin County, Arkansas. Congressional District number 3.
STATUS/TIMELINE: EFLHD awarded a task order for Architectural and Engineering design work in September 2024.
OST-2025-1200 Page 02985
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0028695
Completion of construction advertisement documents -- planned for late summer 2025.
Advertisement of construction contract -- planned for fall 2025. Award of construction contract -- planned for winter 2025/2026.
Please let us know if you have any questions. Thank you,
Heather Dean Simei Congressional Affairs Team Leader Office of Policy and Governmental Affairs Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 E83-430 I (b)(6)
From: Miller, Murray <Murray.Miller@mail.house.gov> Sent: Tuesday, February 11, 2025 10:02 AM To: Dean, Heather (FHWA) <Heather.Dean@dot.gov>; Conner, Jackson <Jackson.Conner@mail.house.gov>; Peele, Nancy <Nancy.Peele@mail.house.gov>; Bolin, Miles <Miles.Bolin@mail.house.gov> Cc: French, Maureen (FHWA) <maureen.french@dot.gov>; Guendert, Zan (FHWA) <zan.guendert@dot.gov>; Lomax, Brian (FHWA) <Brian.Lomax@dot.gov>; Rusnak, Allison (FHWA) <Allison.Rusnak@dot.gov> Subject: RE: Rep. Westerman (AR)- White Rock Mountain road repair
This email originated from outside of the Department of Transportation (DOT). Do not click on links or open attachments unless you recognize the sender and know the content is safe.
Good morning all, and thanks for your time today. We appreciated the opportunity to discuss the White Rock Mountain road issue directly with Executive Director Shepherd this morning. I'm writing to confirm a few follow up action items:
Heather will share brief after internal review (Thursday COB) Heather will share timeline/schedule with milestones (Thursday COB) ED Shepherd is checking to see if this project falls under the programmatic agreement Staff will set up biweekly check-ins with FHWA -- Murray will initiate this on a separate
thread with Miles and Heather
We look forward to seeing the information you all provide later this week. Thank you for your attention to this important issue -- as expressed in the meeting this morning, it continues to be a pressing issue for Congressman Westerman's constituents, and we'd like to see it resolved expeditiously.
Thanks! Murray
OST-2025-1200 Page 02986
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0028696
From: Dean, Heather (FHWA) <Heather.Dean@dot.gov> Sent: Friday, February 7, 2025 9:17 AM To: Conner, Jackson <Jackson.Conner@mail.house.gov>; Peele, Nancy <Nancy.Peele@mail.house.gov>; Bolin, Miles <Miles.Bolin@mail.house.gov>; Miller, Murray <Murray.Miller@mail.house.gov> Cc: French, Maureen (FHWA) <maureen.french@dot.gov>; Guendert, Zan (FHWA) <zan.guendert@dot.gov>; Lomax, Brian (FHWA) <Brian.Lomax@dot.gov>; Rusnak, Allison (FHWA) <Allison.Rusnak@dot.gov> Subject: RE: Rep. Westerman (AR)- White Rock Mountain road repair
Good morning,
Yes, apologize I meant the 11 th. Thank you. And you can use my cell, which is (b)(6)
Thank you,
Heather Dean Simei Congressional Affairs Team Leader Office of Policy and Governmental Affairs Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 E83-430 I (b)(6)
From: Conner, Jackson <Jackson.Conner@mail.house.gov> Sent: Friday, February 7, 2025 9:15 AM To: Dean, Heather (FHWA) <Heather.Dean@dot.gov>; Peele, Nancy <Nancy.Peele@mail.house.gov>; Bolin, Miles <Miles.Bolin@mail.house.gov>; Miller, Murray <Murray.Miller@mail.house.gov> Cc: French, Maureen (FHWA) <maureen.french@dot.gov>; Guendert, Zan (FHWA) <zan.guendert@dot.gov>; Lomax, Brian (FHWA) <Brian.Lomax@dot.gov>; Rusnak, Allison (FHWA) <Allison.Rusnak@dot.gov> Subject: RE: Rep. Westerman (AR)- White Rock Mountain road repair
This email originated from outside of the Department of Transportation (DOT). Do not click on links or open attachments unless you recognize the sender and know the content is safe.
Thank you, Heather!
Confirming the following meeting for Chairman Westerman. Please note that the date will be Tuesday, February 11.
Meeting: Gloria Shepherd -- FHWA Executive Director Date: Tuesday, February 11, 2025 Time: 9:00AM ET Location: Cannon House Office Building, Rm. 202 Attendees:
Gloria Shepherd, FHWA Executive Director
OST-2025-1200 Page 02987
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0028697
Brian Fouch, Associate Administrator for the Office of Federal Lands Highways Heather Dean Simei, Team Lead, FHWA Congressional Affairs Team
Could you please provide a cell number for an attendee in the event of any last-minute changes?
If you have any questions, please let me know. Thank you and have a great rest of your week!
Jackson Conner, Director of Scheduling
202 Cannon HOB I Washington, DC 20515 I (b)(6)
jackson.conner@mail.house.gov I westerman.house.gov
UNITED STATES CONGRESSMAN
BRUCE WESTERMAN
PFPRF ;F ,:T'Nn, I ti n Pict OF ARKANSAS
From: Dean, Heather (FHWA) <Heather.Dean@dot.gov> Sent: Friday, February 7, 2025 9:10 AM To: Peele, Nancy <Nancy.Peele@mail.house.gov>; Conner, Jackson <Jackson.Conner@mail.house.gov>; Bolin, Miles <Miles.Bolin@mail.house.gov>; Miller, Murray <Murray.Miller@mail.house.gov> Cc: French, Maureen (FHWA) <maureen.french@dot.gov>; Guendert, Zan (FHWA) <zan.guendert@dot.gov>; Lomax, Brian (FHWA) <Brian.Lomax@dot.gov>; Rusnak, Allison (FHWA) <Allison.Rusnak@dot.gov> Subject: Rep. Westerman (AR)- White Rock Mountain road repair
Good morning,
In attendance will be:
Gloria Shepherd, FHWA Executive Director Brian Fouch, Associate Administrator for the Office of Federal Lands Highways Heather Dean Simei, Team Lead, FHWA Congressional Affairs Team
Please let us know if you need any further information. We look forward to meeting with you all next Tuesday, the 12th at 9am in 202 Cannon.
Thank you,
Heather Dean Simei Congressional Affairs Team Leader Office of Policy and Governmental Affairs Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 E83-430 (b)(6)
OST-2025-1200 Page 02988
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0028698
From: Peele, Nancy <Nancy.Peele@mail.house.gov> Sent: Thursday, February 6, 2025 2:37 PM To: Dean, Heather (FHWA) <Heather.Dean@dot.gov>; Conner, Jackson <Jackson.Conner@mail.house.gov>; Bolin, Miles <Miles.Bolin@mail.house.gov>; Miller, Murray <Murray.Miller@rnail.house.gov> Cc: French, Maureen (FHWA) <maureen.french@dot.gov>; Guendert, Zan (FHWA) <zan.guendert@dot.gov>; Lomax, Brian (FHWA) <Brian.Lomax@dot.gov>; Rusnak, Allison (FHWA) <Allison.Rusnak@dot.gov> Subject: RE: Rep. Westerman (AR)- White Rock Mountain road repair
This email originated from outside of the Department of Transportation (DOT). Do not click on links or open attachments unless you recognize the sender and know the content is safe.
Heather --
Chairman Westerman returns to DC on Monday mid morning.
We will take the 9 am on Tuesday, Feb 12th. Once you know the attendees, please let us know the names and titles. Thanks, Nancy
Nancy Peele
(b)(6)
cell
Chief of Staff
Office of Chairman Westerman
From: Dean, Heather (FHWA) <Heather.Dean@dot.gov> Sent: Thursday, February 6, 2025 11:21AM To: Peele, Nancy <Nancy.Peele@mail.house.gov>; Conner, Jackson <Jackson.Conner@mail.house.gov>; Bolin, Miles <Miles.Bolin@mail.house.gov>; Miller, Murray <Murray.Miller@mail.house.gov> Cc: French, Maureen (FHWA) <maureen.french@dot.gov>; Guendert, Zan (FHWA) <zan.guendert@dot.gov>; Lomax, Brian (FHWA) <Brian.Lomax@dot.gov>; Rusnak, Allison (FHWA) <Allison.Rusnak@dot.gov> Subject: RE: Rep. Westerman (AR)- White Rock Mountain road repair
Good morning Nancy,
Thank you again for the call. Per our conversation, please see the dates and times we can do below:
Monday, Feb. 10- 8:30am, 10-11am
Tuesday, Feb. 11- 9-10, 2:30-3:30pm
If you need additional dates/times please let us know.
OST-2025-1200 Page 02989
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0028699
Thank you,
Heather Dean Simei Congressional Affairs Team Leader Office of Policy and Governmental Affairs Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 E83-430 I (b)(6)
From: Peele, Nancy <Nancy.Peele@mail.house.gov> Sent: Wednesday, February 5, 2025 5:14 PM To: Dean, Heather (FHWA) <Heather.Dean@dot.gov>; Conner, Jackson <Jackson.Conner@mail.house.gov>; Bolin, Miles <Miles.Bolin@mail.house.gov>; Miller, Murray <Murray.Miller@mail.house.gov>; Meachum, Pete (OST) <charles.meachum@dot.gov>; (b)(6)
Cc: French, Maureen (FHWA) <maureen.french@dot.g_ov>; Guendert, Zan (FHWA) <zan.guendert@dot.gov>; Lomax, Brian (FHWA) <Brian.Lomax@dot.gov>; Rusnak, Allison (FHWA) <Allison.Rusnak@dot.gov> Subject: RE: Rep. Westerman (AR)- White Rock Mountain road repair
This email originated from outside of the Department of Transportation (DOT). Do not click on links or open attachments unless you recognize the sender and know the content is safe.
Heather -- as we come to close on Wednesday, Feb 5th, we have yet to hear back from you on Chairman Westerman's request for a meeting. What are the next steps to confirm a meeting with your team in 202 Cannon? We look forward to your response. Best, Nancy
Nancy Peele
Chief of Staff
Office of Rep. Westerman
(b)(6)
CELL
From: Dean, Heather (FHWA) <Heather.Dean@dot.gov> Sent: Monday, February 3, 2025 3:28 PM To: Peele, Nancy <Nancy.Peele@mail.house.gov>; Conner, Jackson <Jackson.Conner@mail.house.gov>; Bolin, Miles <Miles.Bolin@mail.house.gov>; Miller, Murray <Murray.Miller@mail.house.gov> Cc: French, Maureen (FHWA) <maureen.french@dot.gov>; Guendert, Zan (FHWA) <zan.guendert@dot.gov>; Lomax, Brian (FHWA) <Brian.Lomax@dot.gov>; Rusnak, Allison (FHWA) <Allison.Rusnak@dot.gov> Subject: RE: Rep. Westerman (AR)- White Rock Mountain road repair
Good afternoon, Nancy (and all)
OST-2025-1200 Page 02990
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0028700
Understood, we're working on this now. Do you have any additional details regarding the project, or is this to discuss the repair status?
Thank you,
Heather Dean Simei Congressional Affairs Team Leader Office of Policy and Governmental Affairs Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 E83-430 (b)(6)
From: Peele, Nancy <Nancy.Peele@mail.house.gov> Sent: Monday, February 3, 2025 3:13 PM To: Dean, Heather (FHWA) <Heather.Dean@dot.gov>; Conner, Jackson <Jackson.Conner@mail.house.gov>; Bolin, Miles <Miles.Bolin@mail.house.gov>; Miller, Murray <Murray.Miller@nnail.house.gov> Cc: French, Maureen (FHWA) <maureen.french@dot.gov>; Guendert, Zan (FHWA) <zan.guendert@dot.gov>; Lomax, Brian (FHWA) <Brian.Lomax@dot.gov> Subject: RE: Rep. Westerman (AR)- White Rock Mountain road repair
This email originated from outside of the Department of Transportation (DOT). Do not click on links or open attachments unless you recognize the sender and know the content is safe.
Heather -- Chairman Westerman would like the meeting to be in person this week in 202 Cannon. Preferably Tuesday or Wednesday.
We also have reached out to Pete Meachum, chief of staff for Secretary Duffy, to coordinate a time for Chairman Westerman and Secretary Duffy to visit in 202 Cannon.
Thanks, Nancy
Nancy Peele
Chief of Staff
Office of Chairman Westerman
(b)(6)
cell
From: Dean, Heather (FHWA) <Heather.Dean@dot.gov> Sent: Monday, February 3, 2025 3:08 PM To: Conner, Jackson <Jackson.Conner@mail.house.gov>; Bolin, Miles <Miles.Bolin@mail.house.gov>; Miller, Murray <Murray.Miller@mail.house.gov>; Peele, Nancy <Nancy.Peele@mail.house.gov> Cc: French, Maureen (FHWA) <maureen.french@dot.gov>; Guendert, Zan (FHWA)
OST-2025-1200 Page 02991
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0028701
<zan.guendert@dot.gov>; Lomax, Brian (FHWA) <Brian.Lomax@dot.gov> Subject: Rep. Westerman (AR)- White Rock Mountain road repair
Good afternoon all,
Confirming receipt of your request. We will coordinate with the appropriate staff and someone from FHWA will follow-up with you all on setting up a call.
Thank you,
Heather Dean Simei Congressional Affairs Team Leader Office of Policy and Governmental Affairs Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 E83-430 I (b)(6)
From: Conner, Jackson <Jackson.Conner@mail.house.gov> Sent: Monday, February 3, 2025 2:29 PM To: Dean, Heather (FHWA) <Heather.Dean@dot.gov>; French, Maureen (FHWA) <maureen.french@dot.gov>; Guendert, Zan (FHWA) <zan.guendert@dot.gov>; Lomax, Brian (FHWA) <Brianlomax@dot.gov> Cc: Miller, Murray <Murray.Miller@mail.house.gov>; Peele, Nancy <Nancy.Peele@mail.house.gov>; Bolin, Miles <Miles.Bolin@mail.house.gov> Subject: RE: Meeting Request - ED Shepherd - White Rock Mountain road repair
Some people who received this message don't often get email from jackson.conner(a),mail.house.gov. Learn why this is important
This email originated from outside of the Department of Transportation (DOT). Do not click on links or open attachments unless you recognize the sender and know the content is safe.
Good afternoon,
Looking forward to working with you to schedule this meeting between Chairman Westerman and Executive Director Shepherd.
Please send over availability as soon as you can, and we will find a time that works mutually. The Chairman is incredibly motivated to have this meeting, in-person, in DC this week. Thanks in advance for working with us.
Jackson
Jackson Conner, Director of Scheduling 202 Cannon HOB I Washington, DC 20515 I (b)(6) jackson.conner@mail.house.gov I westerman.house. ov
OST-2025-1200 Page 02992
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0028702