Document 4vZ2QQ9yKVowgQzvmb7gGk62G
700 WEST CAROLINE STREET. PAULDING. OHIO 45879 419/399-3015
grizziy
BRAKE PRODUCTS
March 2, 1976
Glen Butler Area Director Occupational Safety and Health Administration Federal Office Building - Boom 734 234 Summit Street Toledo, Ohio 46304
Dear Mr. Butler:
REF: OSHA-1, No. 320
This is our first progress report for correction of alleged violations stemming from an inspection made on 2/4/76.
This report is divided into two sections. First are items which have been corrected. Second is a progress report on items not yet corrected.
COMPLETED ITEMS
Citation # Item #
Corrective Action Taken
2 1 Guards were located and immediately in stalled following the inspection.
ITEMS REMAINING TO BE COMPLETED
Citation # Item # 11
Status
An electrical contractor and atn electrical supply house are currently evaluating lighting needs throughout the plant.
This is to be completed by 4/15/76, after which quotes will be requested so that a purchase order may be written.
This item will be completed by 8/16/76.
1 2 An electrical contractor has been hired to rewire the motors and equipment at the Bond line.
New work will comply with all applicable codes and will be completed by 3/16/76.
MAR 001712
Glen Butler March 2, 1976 Page Two
Citation Item # 13
31
Status
Caution signs are scheduled to be affixed to the asbestos tubs on 3/10/76.
Labeling of the large metal tubs is to be done in conjunction with correction of Citation #1, item #3 on 3/10/76.
Sincerely,
APS:llw
cc: R. Hexnmelgam R. Rogers J. Sherr R. Treinen
ft./?
A. P. Staszak OSHA and EPA Compliance Director
MAR 001713