Document 4vQ3rBJEjZY65qjmxwz7yRo6x
SENT VIA ELECTRONIC MAIL
Lee Locke Environmental Manager MTI Baths, Inc. 670 North Price Road Sugar Hill, Georgia 30518 llocke@mtibaths.com
Re: Final Clean Air Act Inspection Report
Dear Lee Locke:
On November 29, 2023, the U.S. Environmental Protection Agency Region 4 Air Enforcement Branch conducted a partial compliance inspection of MTI Baths, Inc., located in Sugar Hill, Georgia. Enclosed is a copy of the final report generated by the U.S. Environmental Protection Agency's Region 4, North Air Enforcement Section.
Should you have questions regarding this inspection report, contact me at (404) 562-9177, or by email at Rieck.Stephen@epa.gov.
Sincerely,
STEPHEN
Digitally signed by STEPHEN RIECK
RIECK
Date: 2024.01.31 09:21:42 -05'00'
Stephen Rieck
Environmental Scientist
North Air Enforcement Section
CC: Jack Habib, Georgia EPD
United States Environmental Protection Agency (EPA) Region 4 Air Enforcement Branch Final Inspection Report
I. GENERAL INFORMATION
Facility Name: MTI Baths, Inc.
Location (Address):
670 North Price Road Sugar Hill, Georgia 30518
Inspection Date: November 29, 2023
Type of Inspection (Full or Partial Compliance Evaluation): Partial Compliance Evaluation
PROGRAMMATIC ID: GA0000001313900155
PERMIT NUMBER: Permit # 3088-135-0170
EPA Region 4 Investigator(s)/Inspector(s): Steve Rieck, Environmental Scientist Kevin Taylor, Environmental Engineer Sharron Porter, Environmental Engineer
State/Local Investigator(s)/Inspector(s): Jack Habib, Georgia EPD
Person(s) Contacted at Facility (Name and Title): 1. Lee Locke, Environmental Manager 2. Kevin Hyde, Vice President of Operations
Report Prepared by: Stephen Rieck
Project Name: MTI Baths, Inc. - Inspection ICIS/Project No GA0000001313900155-2023
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 1 of 12
FACILITY INFORMATION A. Facility and Permit Information
Facility and Permit Information
Comments
1. Type of facility (e.g., chemical plant, refinery, cement manufacturer, etc.).
2. Air permit number(s) and type of permit (e.g., Title V, PSD, Synthetic Minor, etc.).
3. Air permit issuance date.
Bathtub Manufacturer Permit # 3088-135-0170 November 24, 2020
4. Air permit expiration date.
November 24, 2025
5. Facility classification (Major, Synthetic Minor/Conditional Major, Minor).
6. Major source pollutants (if applicable).
7. Applicable regulations (e.g., State Implementation Plan, MACT Subpart FFFF, NSPS Subpart EEEE, etc.).
8. Types of air emission points (e.g., tanks, process vents, boilers, etc.).
9. Types of air pollution control equipment (e.g., baghouse, scrubber, afterburner, etc.).
Major
Hazardous Air Pollutants (HAPs) - Styrene
40 C.F.R. Part 63, Subpart WWWW - National Emissions Standards for Hazardous Air Pollutants (NESHAP): Reinforced Plastics Composites Production Vents in booths and building
Fabric Filters
B. Process Description
MTI Baths, Inc., operates a fiberglass-resin reinforced plastic products manufacturing facility. The facility uses resins and other materials subject to 40 C.F.R. Part 63, Subpart WWWW, the NESHAP for reinforced plastic composites production.
II. INSPECTION ACTIVITIES
Project Name: MTI Baths, Inc. - Inspection ICIS/Project No GA0000001313900155-2023
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 2 of 12
Activity
Opening Meeting 1. Date and time entered the
facility.
Yes No NA
Y
2. Credentials presented to facility Y personnel (include name and title).
3. Conducted an opening meeting Y to explain the purpose and objectives of the inspection.
Comments
The EPA Region 4 inspection team and the Georgia EPD inspector arrived at the facility on November 29, 2023, at 9:30 AM EST. Upon arrival, EPA inspectors presented credentials to Lee Locke and Kevin Hyde.
The inspection team held an opening conference with Mr. Locke and Mr. Hyde to discuss inspection objectives.
4. Discussed safety issues.
Y
5. Discussed which records to be Y reviewed.
6. Discussed the facility walk-
Y
through and the areas to be
observed in the facility.
The inspection team discussed appropriate personal protective equipment prior to going to process areas. Facility staff provided the inspection team with records associated with Subpart WWWW compliance. A list of documents reviewed can be found in Item 10 of this report. The inspection team discussed the bathtub manufacturing process and facility process areas. All process areas of the facility were inspected during the walk-through.
7. Discussed facility policy
Y
regarding photographs or video
(if applicable).
8. Discussed the use of the
Y
infrared camera, TVA, PID,
and any other equipment.
9. Discussed CBI.
Y
The inspection team notified facility staff when photographs were taken during the walkthrough. All photographs are considered Confidential Business Information (CBI) until reviewed by facility staff. The inspection team discussed use of a digital camera.
The inspection team indicated that any material claimed to be CBI would be treated in accordance with regulations.
Project Name: MTI Baths, Inc. - Inspection ICIS/Project No GA0000001313900155-2023
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 3 of 12
Activity
Records Reviewed at the Facility 10. The types of records reviewed,
and the time period reviewed.
Yes No NA
Y
Comments
The inspection team reviewed facility records on-site. The facility provided electronic copies of records by email following the inspection. Records requested during the inspection:
1. Safety Data Sheets for materials used in the process.
2. Filter changeout logs for all process areas.
3. Filter pressure logs. 4. Monthly production hours. 5. Gel coat and resin usage.
Facility Walk-Through Observations
Project Name: MTI Baths, Inc. - Inspection ICIS/Project No GA0000001313900155-2023
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 4 of 12
Activity
11. The process equipment observed and the associated operational rate observed (e.g., Furnace 1 production rate was 5 lbs/hr on 1/1/15, at 2:00 pm - permit requires max rate at 6 lbs/hr).
Yes No NA Y
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
Comments
Inspection of process areas began at approximately 10:00 AM. The inspection started in Building 3, where acrylic tubs are manufactured. Acrylic sheets are heated to 350 degrees Fahrenheit and adhere to the tub mold. After about ten minutes, the shaped acrylic tub is reenforced with spray fiberglass and resin. The tub cures for approximately three hours and is removed from the mold. The tub is then trimmed and assembled with other tub pieces.
The process area is equipped with air filters that are changed weekly. No visible emissions were noted. Resin storage tanks are submerged fill and in good condition.
The team then observed the engineered solid stone tub manufacturing process. The process uses an auto-caster, which mixes filler material, resins, and a catalyst. The material is poured into a mold and hardened in an oven. No visible emissions were noted in the process area.
The team then observed the acrylic shower base manufacturing area in Building 2. This is the only area that uses gel coat in the process. The facility maintains one tank of gel coat. The team also observed the resin storage tank. No visible emissions were noted in the process area.
Project Name: MTI Baths, Inc. - Inspection ICIS/Project No GA0000001313900155-2023
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 5 of 12
Activity
12. The type of process parametric monitoring observed and the associated value observed (e.g., Furnace 1 flux injection rate was 200 lbs/batch at 1/1/15, at 2:00 pm - permit requires max rate at 225 lbs/batch).
Yes No NA N/A
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
13. If process equipment or
N/A
parametric monitoring
equipment was not operating,
state the reason by facility
personnel why the equipment
was not operating.
Comments
Project Name: MTI Baths, Inc. - Inspection ICIS/Project No GA0000001313900155-2023
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 6 of 12
Activity
14. The type of air pollution control equipment, the process equipment it is controlling, and the associated parametric monitoring value observed (e.g., baghouse pressure drop, temperature, scrubber flow rate, etc.).
Yes No NA Y
(For example - RTO 1 controlling furnace 1, 1,500 degrees F on 1/1/15, at 2:00 pm - permit requires 1,400 degree F or higher).
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
Comments
The facility operates fabric filters to control particulate matter and improve indoor air quality. No issues were noted with the control device.
Pressure drop of the filters is measured and recorded. Filters are changed regularly.
Project Name: MTI Baths, Inc. - Inspection ICIS/Project No GA0000001313900155-2023
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 7 of 12
Activity
15. Continuous emissions monitoring devices and values observed. (e.g., CEMS, COMs, etc.).
Yes No NA N/A
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
16. If air pollution control
N/A
equipment was not operating,
state the reason by facility
personnel why the equipment
was not operating.
17. Capture and collection system N/A (enclosures and hoods) observations, if applicable (e.g., the magnitude and duration of emission escaping capture from the hood).
Comments
Project Name: MTI Baths, Inc. - Inspection ICIS/Project No GA0000001313900155-2023
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 8 of 12
Activity
18. Ductwork transferring the emissions to the air pollution control device observations, if applicable (e.g., the magnitude and duration of emission escaping from the ductwork, holes or deterioration in ductwork, no deterioration observed, etc.).
Yes No NA N/A
Comments
19. Any existing unpermitted
N
emission points, new
unpermitted emission points, or
non-permitted construction
activities observed. (if yes,
describe in the comments
field).
20. Were any visible emissions
N
observed? (if yes, identify the
location and equipment).
21. Was a Method 9 reading
N
performed? (if yes, identify the
location and equipment).
No visible emissions were observed during the inspection.
22. Was the cause of the visible
N
emissions investigated and the
information documented?
Project Name: MTI Baths, Inc. - Inspection ICIS/Project No GA0000001313900155-2023
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 9 of 12
Activity
23. Was a Method 22 performed for visible emissions? (if yes, identify the location and equipment).
Yes No NA N
Comments
24. Identify the cause of the visible N/A emissions as explained by facility personnel, if applicable.
25. Was the infrared camera used? N If so, attach the video log (which includes the equipment ID, and the date and time the video was recorded) and videos to this report.
The infrared camera was not used at this facility.
Project Name: MTI Baths, Inc. - Inspection ICIS/Project No GA0000001313900155-2023
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 10 of 12
Activity
26. Was the TVA used? If so, identify the equipment monitored and the results.
Yes No NA N
Provide the date and time the information was recorded by the inspector. Include actual instrument readings for each piece of equipment monitored above the leak definition and/or where the infrared camera identified a release.
An attachment may be used for a large amount of information.
Comments A TVA was not used at the facility.
27. Was the PID used? If so,
N
identify how the PID was used
and the results.
Provide the date and time the information was recorded by the inspector.
An attachment may be used for a large amount of information.
Closing Meeting 28. Conducted a closing meeting. Y
A PID was not used at the facility.
The Region 4 inspection team conducted a closing meeting on November 29, 2023, at 11:15 AM EST with Mr. Locke and Mr. Hyde.
Project Name: MTI Baths, Inc. - Inspection ICIS/Project No GA0000001313900155-2023
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 11 of 12
Activity
29. Summarize any additional information needed, if applicable?
30. Accept a declaration of CBI, if applicable?
31. Discussed observations.
32. Discussed next steps, if applicable?
33. Date and time inspection concluded.
Yes No NA N/A
N/A
Y
Y
Comments
Facility staff has reviewed the draft report and determined there was no CBI. Due to a malfunction with the digital camera, pictures taken during the inspection were not saved to the camera's memory card. The inspection team thanked facility staff for their time. The team discussed the facility walkthrough. A final inspection report from EPA Region 4 will be sent to the company within a 60-day timeframe. The inspection concluded on November 29, 2023, at 11:30 AM EST.
Miscellaneous 34. Include any additional
observations, if applicable.
EPA Investigator/Inspector Signature:
EPA Supervisor Signature & Title:
N/A
Digitally signed by STEPHEN
STEPHEN RIECK RIECK Date: 2024.01.31 09:22:17 -05'00'
___________________________________
JASON
Digitally signed by JASON
DRESSLER
_D__R_E_S__S_L_E_R_________D_a_te_: 2_0_24_.0_1._31_1_6:_04_:2_6_-0_5'_00'
Chief, North Air Enforcement Section
Project Name: MTI Baths, Inc. - Inspection ICIS/Project No GA0000001313900155-2023
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 12 of 12