SUBJECT KAISER ENGINES! HEWCLY FTET.Tl ACTIVITY REPORT
April 16, 1968 0. A. Finsand
C
Middletown Construction 7100
Transmitted herewith is the subject report for the week ending April 16, 1968. OAF/sec
Distribution
Armco D. C. Osborne
C. G. Kramer F. W. Barnes
T. R. Foley P. R. Smith D. Cox J. S. Lotz R. L. Brannaman
Jrbli? (Oakland) W. F. Sort (Oakland) D. A. Daly F. X. Kast S. Ustel
V. L. Frankson A. L. Gordon H. Co Boucher
cc: Central File Kaiser Reading File Armco Reading File
KEN 004362
KAISER jsMGIKEEBS WEEKLY FIELD ACTIVITY REPORT Week jxding April 16, 1968
WEATHER: Clear weather with some scattered showers.
TEMPERATURE: Maximum - 72 degrees Minimum - 36 degrees
CLIENT:
Armco Steel Corporation
LOCATION: Middletown, Ohio
JOB NUMBER: 6471
JOB VISITORS W. F. Bort and L. H. Misner
Management General Supervision Field Engineering W&rehs. & Mtl. Control Survey Office Srv.A Repro. Clerical Craft *
TOTAL
SUMMARY FORCE REPORT
Kaiser Engineers Exannt Nbn-Ebcemot Subcontractors
44 18 1 41 15
36 1 14 15
--m
68 830
20 13
3
16 m
989
Foothill Electric Total
19 5 44 14 83 1 10
18 6
15 31
689 2,566
* Average for week of men on payroll.
Average for week of Crafts is as follows:
Kaiser Engineers Subcontractors Foothill Electric
Total Crafts Working
715 892 -J2k
2,181
KEN 004363
&$****' m
mf
-3-
msXLZ FIELD ACnVHT HEPOflT Week finding April l, 1968
PfiOJcCT PROGRESS
1. 7148 - HOT STRIP MILL
1.3 Structural and Miscellaneous Steel: An average work force of fifteen ironworkers was maintained in the hot strip will during the period. In the furnace area, progress continued on the punch list items and the re turn for the extractor dry scale bucket was reworked. In the finisher area* the drains at the pinch roll scalebreaker pits were reworked and progress continued on the scale pit punch list items. An average work force of seventeen sheetaetal workers was maintained during the period. In the furnace area, guards were being installed at the slab reject car, skip hoist and dry scale removal systems. In the runout area, the fume elimination ductwork was being reworked and in the scale pits, guards were installed in the conveyor structure.
1.5 Heating and Ventilating: Sags have now been hung in all bag houses. KE pipefitters have completed rework in bag houses 7, 8, 10, 12 and 14.
lo6 Mechanical; Ho mechanical work by Eicbleay forces was required tfcU
period in the hot strip mill area. In the waste heat boiler area, the
over-heating of fan bearings continued to be a major problem. At fur
nace #1, the induced draft and forced draft fan bearings were inspected
while the furnace was shut down for refractory repairs. After inspec
tion, these bearings were reassembled tinder supervision of a Worthington
representative and test operations were conducted to both the forced
draft and induced draft units. During these operations, the bearings
for both units over heated. It was then necessary to remove the bull
gear bearings from the #3 induced draft unit as well as the forced draft
fan gear drive bearings and install them in the #1 unit. At the close
of this period, the #1 furnace was started with the forced draft fan in
operation at minimum speed. Hie bearing replacement for the induced
draft fan is in progress. Furnace #2 was operating throughout the
period by Anaco for heating of slabs used for operations. The dry-out
and start-up of waste heat boiler #3 is pending delivery of new fan
bearings from the Worthington factory. It was also necessary to replace
the #1 forced draft fan governor with the governor from unit #3* The
governor., for #1 forced draft fan turbine was returned to Worthington for
repair,
--
1.7 Piping: "Work has been completed on the additional supports required for the downcoiler hydraulic systsns. The vendor's representative for the sump pumps will be on site early next period to start the installation of the new shaft seals for the fourteen pumps which were not reworked in the vendor's shop. Three reworked pumps were received this period.
KEN 004364
wesklt field actihti hspost
Week fending April 16, 1968
1.8 Electrical: Foothill Electric Corporation maintained an average work force of one hundred and seventeen electricians in the hot strip will. during the period. Foothill installed 1,680 lbs. of exposed conduit for a total to date of 1,569,870 lbs. or 995*1 complete. 1,500 feet of low voltage cable was installed for a total to date of 1,977,800 feet or 100# complete. 12 low voltage cable terminations were made for a total to date of 33,308 or 99$ complete. 4,000 feet of control cable was installed for a total to date of 2,082,250 feet or 100$ complete* 36 control cable terminations were made for a total to date of 63,084 or 99$ complete. 1,339 lb3. of lighting conduit and 6,400 feet of lighting wire was installed. 800 feet of communications and TV cable was installed. 180 lbs, of structure grounding was installed for a total to date of 147,492 lbs. or 99$ complete. 1,900 feet of computer cable was installed for a total to date of 932,700 feet or 100$ complete.
1.9 Miscellaneous Subcontracts: Owens Corning Fiberglas Company maintained an average work force of twelve men on insulation during the period. Progress was continued on the rework items required in the boiler house and in the hot strip mill.
Delta Pipeline Constructors maintained an average work force of twenty i men in the hot strip mill during the period. 200 feet of 2 inch well water piping was installed during the period thus completing the supply to the waste heat boiler area. Valves ware being re-installed in the oxygen system and weld tie-ins were being completed and nitrogen pressure testing of the scarfing area oxygen piping was started. Delta Pipeline Constructors have been installing the fuel unloading system and pressure testing of the receiving tank will be performed early next period.
Stuart Painting Company maintained an average work force of twelve men in the hot strip mill during the period. Painting continued on the various piping systems, equipment and architectural items*
Salem-Brosius has now completed the design change on the charge end structural steel at furnace #1 and is virtually complete at furnace #3* Charge end design changes on the refractory for #3 unit will be started upon delivery of the material. Installation of cooling water, drains and impulse lines for the #3 unit continued during the period together with thfKtj&ting of steam, oil and gas lines.
2. 7146 - aLA&MILL
2.1 Excavation and Backfill: 720 cubic yards of excavation was completed for a total to date of 234,447 cubic yards. 192 cubic yards of backfill was made for a total to date of 296,564 cubic yards. This earthwork con sisted mainly of requirements for the slab spray cooling syaten in the slab storage area.
KEN 004365
JIJ." 'I'WIJ^y
.'n-*
-5-
WEEKLY FIELD ACTIVITY REPORT Wade Jsnding April 16, 1968
2.3 Structural and Miscellaneous Steel: An average work force of eleven ironworkers continued with miscellaneous iron installation in the slab mill. The scale pit gantry crane 3&4 including the Jib unit was com pleted. Rail plates in the scale pit area was also completed. At column 14.5 erection of a jib crane was started and is expected to complete next period.
2.3 Heating and Ventilating; Bag house 3 was tested and accepted for opera tions. At bag house 4, a manufacturer's representative is on the job site inspecting the malfunction of the shaker mechanism to establish corrective measures. Test runs were conducted at bag house 5. Design changes were coupleted for the ductwork in the office area and duct in stallation was resumed this period.
2.6 Mechanical: Eichleay Corporation maintained an average work force of fifty men on mechanical installation in the slab mill. In the main mill area, the inspection of grease and lubrication for the line shaft continued. All covers are being removed and a thorough inspection made. The installation of speed and position indicating devices is also in progress. In the main mill area, the upper main mill motor base was grouted in place with minor dowelling and aligxment remaining. Dowelling of the lower main drive motor was completed and auxiliary equipment in stallation is in progress. Erection progress continued at the vertical mill main motor on levelling and alignment. The four bearings for the main MG set were removed and cleaned and reinstalled. At the scarfer fume exhaust system, installation of the fan was completed and grouted in place. Progress is continuing on the remaining ductwork in this area. Some modifications were necessary in fitting duct units together.
2.7 Piping: Hunter Corporation maintained an average work force of fiftytwo men on slab mill piping this period. Major piping systems worked on during the period were: clarified water, circulating oil system 4, oxygen, steam and grease piping. 898 feet of piping was installed thi3 period for a total to date of 38,073 feet. 15,334 feet remain to be in stalled. Hydraulic system 2 was made ready for hydro testing which is scheduled for next period.
2.8 Electrical: 5,000 lbs. of exposed conduit was installed for a total to date of l31,8Q0 lbs. or 91$ complete. 783 lbs. of structure grounding was installed for a total to date of 32,400 lbs. or 81$ complete. 32,700 feet of loir voltage cable was installed for a total to date of 339,0C0 feet or 69$ complete. 921 low voltage terminations were made for a total to date of 5,190 or for an adjusted percentage complete of 75$. 7,700 feet of control cable was installed for a total to date of 156,500 feet or 66$ complete. 414 control cable terminations were made for a total to date of 4,350 or 43$ complete. 3,300 feet of computer cable was installed for a total to date of 47,000 feet or 67$ complete. 360 computer termina tions were made for a total to date of 3,800 or &L$ complete. 470 feet of lighting wire was installed. 1,600 feet of TV and communications material was installed and 176 terminations were made.
KEN 004366
6
WKEKLT FIELD ACTIVITT fiBPOBT Week Ending April 16, 1966
3. 7143 - SOAKING PITS
3*3 Structural and Miscellaneous Steel: A .work force of fifteen ironworkers installed miscellaneous steel in the soaking pit area this period. After the acceptance inspection of crane 358 on Monday, ironworkers continued with the completion of punch list items in order to finalise their work in this area. Handrail at the skip hoist floor openings were also in stalled this period. Sheetmetal workers installed the condenser for the control house air conditioner at elevation 136 together with some siding repair work at column 18.$ and line.
3.6 Mechanical: Loftus Engineering maintained an average work force of one hundred and four men on battery installation. At battery 6, the ranming of final refractory lining was essentially completed at pits 21 through 24* Progress is continuing on the four pits for battery $. Refractory insulation was completed for two cover pits one of which was set in .. . place over pit 24 thus all refractory requirements for this pit are com pleted. Progress was maintained throughout the soaking pit area on elec trical and piping requirements related to batteries 1 through $. Pre parations are now underway for dry-out, test and start-up on battery 6 which is scheduled for the early part of May. Cover carriages were also : test operated in the battery 6 area.
3.7 Piping: Delta Pipeline Constructors maintained an average work force of twenty-four men on service piping in the soaking pit area. Major piping systems worked on were: steam, natural gas, oxygen, well water, fuel oil and bulk grease piping. During the period, 1,245 feet of piping was installed for a total to date of 19,183 feet. 7,628 feet remain to be installed.
3*8 Electrical: 9,000 lbs. of exposed conduit was installed for a total to date of 85,700 lbs. or 62$ complete. 3,323 lbs. of lighting conduit, 850 feet of lighting wire and twenty-eight fixtures were installed.. 1,800 feet of low voltage cable was installed for a total to date of 29,600 feet or 47% complete. 91 lbs. of structure grounding was in stalled for a total to date of 4,230 lbs. or 42$ complete.
4. 7128 - BASK! OgGM SHOP AND MOID YARD
4.1 Excavaticaafrand Backfill: 3,763 cubic yards of excavation was accomplished at the B.Q.F. facility this period for a total to date of 207,855 cubic yards. 984 cubic yards of backfill was completed for a total to date of 247,135 cubic yards. Excavation included the initial excavation for the filter building footings and the continuation of the underground conduit in the furnace area and the east wall of the electrical control room. Backfill included the underground conduit at the track hopper and at E line from columns 12 to 16.
KEN 004367
WEEKLY FIELD ACTIYUT REPOHT Week Ending April 16, 1968
4*2 Concretes 41$ cubic yards of concrete was placed at the main B.O.F. facility for a total to date of 19*630 cubic yards. This concrete in cluded the walls and top of electrical manhole 6* the pump building basement slab* track hopper curbs and underground conduit at column 18 and 24. Concrete was also placed on the north wall on the suspended slab between the furnaces.
4.3 Structural and Miscellaneous Steels 680 tons of structural steel was erected at the main B.O.F. facility for a total to date of 9*483 tons (excluding 328 tons of anchor bolts and base plates). Bolt-up and detailed work progressed during the period and areas are being released for painting* siding and roofing as they are completed. Welding con tinued on the liner plates in the bins. Several large crane girders were set for cranes $02 and 503 and this work helped the high period tonnage installed. Ohio Valley continued the laying of the floor deck ing on the operating floor during the period.
4.4 Roofing and Siding: At the main B.O.F. facility during the period, roofing continued with 6,828 square feet being installed for a total to date of 24*710 square feet. Major progress during the period was from column 17 to 24 between D and H lines. Siding installation con tinued on the freight elevator shaft* the lab and office building and on D line between column 17 and 20. During the period* 9*737 square feet of siding was installed for a combined total to date of 32*448 square feet.
4*6 Mechanical: Combustion Engineering started placing material on the ser vice floor at the end of this period for the assembly of the hoods and coolers.
4.7 Piping: Progress continued on the Installation of the roof drains in the charging aisle and the maintenance aisle from column 17 to 20. Storm sewer piping was being installed from manhole 381 to the scrap scale pits. Progress also continued on the installation of the ser vice piping west of the B.O.F. facility and the steam line from the combination valve pit 2 to steam valve pit 5. Crane grease piping in stallation; continued on cranes 502 and 503.
4.8 ELectrical: Foothill Electric continued installation of the underground conduit from electric manhole 6 to the electric control room together with the underground conduit between the north wall of the electrical control room and F line at column 24. Installation of underground con duit continued in the pump building. 40 lbs. of structure grounding was installed for a total to date of 2*335 lbs. or for a corrected percentage of 2$ complete. 154 feet of crane conductor rail was installed for a total to date of 2*374 feet or 26% complete. 46*000 lbs. of embedded conduit was installed for a total to date of 134*900 lbs. or U7% complete. 3*060 lbs. of exposed conduit was installed for a total to date of 32*400 lb3. or 1056 complete. 594 lbs. of lighting conduit and 7*630 feet of lighting wire was installed. 3*000 feet of low voltage cable was installed for a total to date of 12*500 feet or IQ% complete.
KEN 004368
WEEKLX FIELD ACTI7ITI REPORT Week Ending April 16, 1968
4*9 Miscellaneous Subcontracta: Charging Crane 501 -- This crane is now in operation. The final safety inspection was made on April 13th and final operational check-out on April 15th.
Lance Crane 506 -- This crane is now in operation.
Service Crane 502 -- Installation of electrical equipment was started on April Uth. Work on conduit junction buses and trolley rails is now in progress. Piping installation continued during the period.
T sealing Crane 503 - Erection of this crane continued through the period and electrical work has not yet started. Installation of piping con tinued during the period.
Ladle Additive Crane 50t -- Parts of this crane have now arrived on site.
-Maintenance Crane 503 -- This crane is completely erected with bolt-up yet to be completed.
At the lab and office building, McGraw Construction Company placed the concrete slab between columns 4 and 6 during the period together with the concrete in the side walls of acid pit #1. On the second floor, the main duct lines have been installed with progress continuing on the individual room runs. Masonry work along A line will be started during next period with the wall partitions on the second floor to be started near the end of this month.
At the flux material handling system, Rex Chainbelt are scheduled to receive two railroad cars of track unloading hopper material during next period. This equipment will be erected by a lower tier subcon tractor, Thelen Construction Company.
David L. Smith have completed the temporary area foundations for C5&X in the charging aisle between columns 17 and 20 for the erection of the furnace vessels. Seven car lbads of furnace material have been received but not yet unloaded.
5. ms - SflEBSFPiR BPILDINQ
The finkfe inspection of the stripper building was held on April 16th and a punch'liat will now be developed. The heat shield was completed during the period together with punch list items on cranes 354 and 356. The heating and ventilating system in the rectifier building is now ready for testing.
KEN 004369
W&KLT FIELD ACTIVITT fiEPOBT Week Ending April 16, 1968
*7*
6. 7150. TlSfif end 7159 - PICKLE AREA
*
6.2 Concrete:-* 252 cubic yards of concrete was placed on pickle line 4
during the period for a total to date of 13,655 cubic yards. Major concrete pours included floor slabs between columns 17 and 20, the for the pipe trenches between columns 26 and 31 and the slab and piers for bag house "A". Encasement of concrete this period was 68 cubic yards. On pickle line 5, 36 cubic yards of concrete was placed for a total to date of 7,536 cubic yards. This concrete was for encasement of conduit.
6.3 Structural and Mienaiinnona Steel: At the pickled coil storage building, structural bolt-up continued. The remainder of the top cord steel has now been released for painting. Work continued on the vent, walkway and plat forms. At the pickle line, outside access ladders were being set.
6.4 Hoofing and Siding: At the pickled coil storage building, 7,746 square
feet of roofing was installed for a total to date of 39,140 square feet.
In the pickle lines, siding for the maintenance aisle walls was reconmenced
during the period.
a
6.6 Mechanical: Ohio Valley continued with the support steel for the pickle tanks on #4 end 5 lines. . #5 pickle line is now ready to' receive the
pickle tanks. On #4 pickle line, three of the pickle tank sections have been field welded and are ready for vulcanizing. Wall plates have been set for the wet loop pit for #4 line and are ready for the side guides and slabs.
6.7 Piping: Delta Pipeline Constructors maintained one crew in the pickle line during the period. The pipe supports along F line have now been completed and 6 inch and 4 inch plant air header pipe is being set. Grease piping installation was continued on crane 406 and was started on crane 407. In the green coil storage building. Norm Woolley con tinued installing the risers and drops for the 2 inch plant air line. During the period, the oxygen and natural gas lines were tested and repairs to leaks were made in the plant air line. The oxygen and natural gas lines have now been accepted by inspection.
6.3 coil storage building, all the lighting panel feeder- cflMB^haifebeen: installed on C line. Lake Erie continued the ix^allj^H^if 'coxxiuit on B line east of column 10 for the high bay ligbtin|B^jj>;r!w^ pulled for the welding panels and the conveyor trenche3f?*j5sltho pickle lines, the remaining electrical gear was being brought inia the entry motor room for #4 line. Conduit was run for the high bay lighting in the maintenance and conveyor aisles and wire was pulled for the pickle building high bay lighting. Conduit was installed in the trusses for the welding panel distribution.
KEN 004370
HEESLI FIELD ACTI7HT HEPQHT
Week Ending April 16, I960
6.9 M^HriWnjpueiottB. Subcontracts: FS3 Builders continued the masonry walls in the delivery room up to column 34. This contract will continue when the remaining floor slabs for the delivery motor roan #4 line have been placed.
Stuart Painting continued painting .of the structural steel in the pickled coil storage building.
7. 7160 - COLD HILL
During the period, 18,346 cubic yards of excavation was completed for a total to date of 68,883 cubic yards. All rough excavation work will be held to an elevation 3 feet above those shown on the 70% drawings. The temporary substation has been located in the field and Foothill Electric has received the pole line drawings. Subcontracts are pre sently being reviewed for piling work to be done at column K 33* Prefabrication of the dewatering well CMP pipe has been started.
8*. 7186 - WASTE DISPOSAL FOR THE PICKLE FACILITY
During the period, 123 cubic yards of concrete was placed for a total to date of 2,065 cubic yards. This concrete included part of the floor slab at the 107 elevation. These slabs are now 80% complete. 1,701 square feet of siding was installed for a total to date of 5,373 square feet. Handrail was being installed on the stairs in the building. Pre parations of the tank farm pads were being made for setting of the 75,000 gallon fiberglas tanks. Excavation for the second clarifier was started during the period.
International Pollution Control continued drilling for the #2 disposal well during the period. The well has now been drilled to a depth of 2,946 feet.
9* UTILITIES
7105 - Water Distribution System; Delta Pipeline Constructors has exca vated for-hydrants and tie-ins for well water in the south area. In the ste a, the 8 inch well water line was being rerouted east of the #2. The piping and hydrant installation is now complete in
7110 - Power Distribution? At the melt area switching station, rough-in work for the relpcatlon of relays and isolating transformers was started at the end of the period. In the hot strip mill, progress continued on the installation of the pulse recorders in the dispatoher*s office.
KEN 004371
'.JSBKLI FIELD ACTIVITY RfiPOBT Week Ending April 16, 1968
7111 - Sanitary Sewara: In the steelmaking area. Delta Pipeline Con structors have repaired a faulty butt joint near manhole 572 and a final inspection is scheduled early next period. Progress continued on the manhole tops in the mold yard area.
7112 - Drainage and Site Development; 2,402 cubic yards of excavation was completed during the period for a total to date of 805,662 cubic yards. 6,110 cubic yards of backfill was placed for a total to date of 1,057,666 cubic yards. Delta Pipeline Constructors continued the in stallation of manholes on the storm sewer lines and fifteen manhole tops now remain to be completed. Westinghouse Jslectric Corporation started cable trenching at parking lot #3. Thirteen of the 100 foot towers have been framed and ballast tanks, installed.
7113 - Trackwork; DBS Corporation installed TOO feet of track and five turnouts south of existing mold yard and 762 feet of flangeway was in stalled in the south area during the period.
7114. - Locker Rooms: A final inspection of the ateelmaking area locker room is scheduled for April 18th.
OAF/LM/sec