Document 4v1jGpXb5ZL9zRQkddjogQJNN
wJ
Interoffice Communication
To
From
A. H. Sather J. V. Uptain
Date February 9, 1978
Subject CONTINUOUS MONITORING SUMMARY FOR JANUARY, 1978
Stream No.
1 2 3 4 5 6 7 8 9 10 % of Total
Laboratory Unit
Range, PPM .0 - 0.5 0.5 - 1.0 1.0 - 5.0 + 5.0 % over 5
. 744 0 0 0
0.0
Dryer Building Unit
744 0 0' 0
0.0
744 0 0 0
0.0
744 744 744 0 00 0 00 0 00
0.0 0.0 0.0
744 744 744 744
0000
0000
0000
o o
0.0 0.0
0.0
100.0 0.0 0.0 0.0
-
Range, PPM .0 - 0.5 0.5 - 1.0 1.0 - 5.0 + 5.0 % over 5
645 1 1 1
0.15
643 2 2 1
0.15
645 1 1 1
0.15
Large Reactor'Unit
644 2 1 2
0.31
644 644 22 1 0 1- 2
0.15 0.31
643 643 644 312 110 112
0. 15 0.15 0.31
in by-Operations
645 1 1 1
0.15
99.4 0.3 0.1 0.2 -
Range, PPM .0 - 0.5 0.5 - 1.0 1.0 - 5.0 + 5.0 % over 5
Tank Farm Unit
672 674 642
645 663 602
47 36 62
55 56 82
23 28 35
38 16 48
265
5 9 12
0.27 0.81 0.67 0.67 1.21 1.61
This unit was down on 1/14/78.
Range, PPM .0 - 0.5 0,,5 - 1.0 CL.O - 5.0 +. 5.0 % over 5
613 559 615
646 619 568
43 59 32
19 42 67
16 40 21
7 9 33
0 14
5
0 24
0.0 2.08 0.45 0.0 0.30 0.60
This unit was down 1/13 and 1/15.
660 45 32 7
0.94
660 58 25 1
0.13
662 48 29 5
0.67
731 9 4 1
_Q. L3-
575 637 655 657 _
54 19 11
9
33 16 6 3
9000
1.34 0.0 0.0 0.0
88.9 6.7 3.7 0.7
-
91.5 5.3 2.7 0.5
-
irald V. Uptain c: GGD, Dept. Heads, DAK-Houston, ODS-Ponca City jf
DTH 000050454
ABERDEEN LABORATORY VCM CONTINUOUS MONITORING UNIT TRENDS -PERCENTAGE OF SAMPLES WITHIN CONCENTRATION RANGES
OS
El
5o
ziO? *Ui
5
v>a
(Wu*Ai
Zu
< u.
u>jPU.
IA I 2C
DTH 000050455
ABERDEEN DRYER VCM CONTINUOUS MONITORING UNIT TRENDS -PERCENTAGE OF SAMPLES WITHIN CONCENTRATION RANGES
oo>
CNJ CO
to
in zo jo
> X<
(0 2 o
z
0 ?> 8UJ Q01 *_,
tt UJ
Sfc en3X
DTH 000050456
ABERDEEN LARGE REACTOR VCM CONTINUOUS MONITORING UNIT TRENDS -PERCENTAGE OF SAMPLES WITHIN COCENTRATION RANGES
12 10
8 6 4 2 0 12 10 8 6 4 2 0 12 10 8 6 4 2 0
DTH 000050457
ABERDEEN VCM TANK CONTINUOUS MONITORING UNIT TRENDS -PERCENTAGE OF SAMPLES WITHIN CONCENTRATION RANGES 12
10 8 6 4 2 0
12 10
8 6 4 2 0 12 10 8 6 4 2 0
in August, 1976
DTH 000050458
HONEYWELL CONTINUOUS MONITOR STREAM LOCATIONS
Laboratory
Stream No,
Location
1 Mounted on middle bagger in warehouse , 2 Mounted in Quality Control Laboratory 3 Mounted on Line I Blenders '4 Mounted on Line III mill 5 Mounted in Development Laboratory 6 Mounted on Welex Deck in Dry Blend 7 Mounted in Dry Blend Control Room 8 Mounted on Dry Blend Blender 9 Mounted in Section B of East warehouse 10 Mounted on shrink wrap unit
Large Reactor Area
Stream No.
Location
1 Mounted at east side of Control Room 2 Mounted at 401 VCM Receiver 3 Mounted on 1st floor at H-5 Reactor 4 Mounted on second floor of Large Recovery System 5 Mounted above Sweco 6 Mounted on 1st floor, bottom of D-300 7 Mounted at top of D-300 8 Mounted at bottom of D-500 9 Mounted at top of D-600 10 Mounted on inlet air to Control Room
Dryer Building
Stream No.
Location
1 Mounted on 1st floor between #5 8 #6 activator 2 Mounted in Dryer Control Room 3 Mounted on 1st floor between #7 5 #8 activator 4 Mounted on 2nd floor sifter area east of #6 5 Mounted on 1st floor under slurry hose station 6 Mounted on 1st floor between #7 $ #8 Birds 7 Mounted on 1st floor between #4 #5 Birds 8 Mounted on 2nd floor between # 7 #8 Birds 9 Mounted on 2nd floor between #4 #5 Birds 10 Mounted on V-10 bagger
VCM Tank Farm
Stream No.
Location
1 Mounted on bottom of D-600 reactor 2 Mounted at #3 Recovery System 3 Mounted at South unloading station 4 Mounted at respiratory air inlet 5 Mounted at middle unloading station 6 Mounted ar North unloading station 7 Mounted at Compressor shed 8 Mounted at blowdown tank - South end 9 Mounted at North Receiver
10 Mounted at Gear Room (West side)
DTH 000050459