Subject: Action Items from 9/16 C-8 Sampling Meeting
1. Data analysis of Nichols' c-8 sampling project
Develop format for data entry
6AC
Have data entered
RRM
Analyze Data
6AC
2. Insure proper PPE is used in the PP/Disp. Wax Room
CJ6
3. Reduce c-8 exposure risk from Granular ingredients hood
Implement short-tern) measures (fix leak, etc.)
CJG
Implement long-term measures (surfactant addition system) RJ2
4. Mork Mith Hailey to move B162 2nd floor smoking area
RRM
5. Install filter on FP dryer C-8 vent
RJZ
6. Insure proper maintenance is performed on FP dryer as noted in incident investigation FDL 970015
See
Writs Up
7. Set standard in the BTO to not near clothes contaminated RRM Mith dispersion (or other c-8 containing materials)
8. Resolve exposure potential associated with draining of FP float tank (automated valve?)
CJ6/RJZ
9. Insure proper PPE is used for changing air filters with CJQ
g
emphasis on the roof of B162.
N
10. Manage C-8 exposure potential in vicinity of C-8 scrubber
o\
Understand G*8 exposure potential on B162 roof &
S
surrounding areas
R<JZ
institute appropriate administrative controls & PPE
CJQ
Take additional air samples to complete mapping
AJP/BSD
11. compare Nichols' data Mith previous data (particularly
blood data) and look for correlations
AJP
12. Take Mipe samples in FEP clean room.
BSD
13. if C-8 is going to continue to be used in FEP, investigate
engineering controls on C*8 levels.
By Loch
14. Evaluate Nichols' data and recommend additional sampling BSD
needs.