Document 4qe6gzbVMRjKbOkLNV97MZ9j

-+oO .0902 - Asbestos-Procedures Building Management Programs Dallas, June 5 > <.991 District Manager-Building Operations & Maintenance - Houston (Bill Nicks) District Manager-Architecture - San Antonio: (Herb Looney) Area Manager-Construction Management - Houston: (Peter M. Mistrot) Area Manager-Architecture - Houston: (Jim White) Area Manager-Architecture - San Antonio: (Pete Campos) Area Manager-Network Engineering - Dallas: (Mel West) Area Manager-Network Operations Staff - Dallas: (Perry G. Lambert) Manager-Architecture - Dallas: (David Keeling) Manager-Architecture - Dallas: (Yadira Lopez) Manager-Architecture - Dallas: (Kathy Schneider) Manager-Buildings - El Paso: (Bettye G. Marable) ___ Manager-Buildings - Ft. Worth: (Ralph McCloud) Manager-Buildings - Dallas: (Marion Solomon) Manager-Building Engineering - Houston: (Charles E. Broussard) Manager-Safety-Network Operations - Dallas: (Larry Peterson) Manager-Architecture - Dallas: (Mike Oliver) Manager-Buildings - Houston: (Ronald H. Brandenberg) Manager-Buildings - Dallas: (J.J. Garza) Manager-BOCC-Tec'nnical Support - Dallas: (Becky Brigham) Manager-Removal Operations - Dallas: (Mike Miller) Manager-Safety - Dallas: (Joey Grubbs) Senior Reports Clerk - Dallas: (Susan Papesh) The next North Texas Building Asbestos Committee meeting will be on Thursday, July 18, 1991, at 9:00 a.m., One Bell Plaza, Room 1310, Dallas, Texas. The meeting will adjourn at 4:30 p.m. Please schedule your plane reservations appropriately. This meeting will be a pilot course for the Asbestos Training that is to be presented across Texas this year. Attached are May meeting: A Member list " Prior meeting attendee list " Subcommittee Assignments/Results * Resolutions 008377 BUILDING ASBESTOS COMMITTEE MEETING COVER LETTER May 23, 1991 PAGE 2 Should you have any questions, please contact me on 214-464-2228. Tobey D. Nealy Area Manager-Bldgs. Operations Staff Operations and Maintenance Attachments cc: G.W. Fox Roberta Ballantyne Bob Jackson 006378 BUILDING ASBESTOS COMMITTEE North Texas Area Correspondence Identification: 460.0902 - Asbestos-Procedures Building Management Programs Revised: 3/8/91 District Manager-Bldg. Opers. & Mtce. - Houston (Bill Nicks) 3100 Main/r607 (77002) 713-521-6138 District Manager-Architecture - San Antonio: (Herb Looney) 4119 Broadway/rG60E 512-841-0788 Area Manager-Buildings - Dallas: (Tobey D. Nealy) I Bell/rPCIO 214-464-2228 Area Manager-Environmental Regulation - Houston: (Peter M. Mistrot) 3100 Main/r609 (77002) 713-521-8976 Area Manager-Architecture - Houston: (Jim White) 3100 Main/r609 (77002) 713-521-7203 Area Manager-Architecture - San Antonio: (Pete Campos) 4119 Broadway/rG60J 512-841-0797 Area Manager-Network Engineering - Dallas: (Mel West) I Bell/rl640.08 214-464-5919 Area Manager-Network Operations Staff - Dallas: (Perry G. Lambert) I Bell/r3225 214-464-8361 Manager-Architecture - Dallas: (David Keeling) III Bell/r804 214/464-3834 Manager-Architecture - Dallas: (Yadira Lopez) III Bell/r804 214/464-4762 Manager-Architecture - Dallas: (Kathy Schneider) III Bell/r8G4 214/464-6075 Manager-Architecture - Dallas: (Mike Oliver) III Beil/r804 214-464-4074 Manager-Buildings -Houston: (Ronnie H. Brandenberg) 1310 Richmond/rB23 (77002) 713-520-0698 Manager-Buildings - Dallas: (J. J. Garza) III Beil/rSB-2A 214/464-4879 Manager-Buildings - El Paso: (Bettye G. Marable) 510 Texas/rl15 (79901) 915-542-4670 Manager-Buildings - Ft. Worth: (Ralph McClo.ud) 1116 Houston/r800 (76118) 817-338-6083 Manager-Buildings - Dallas: (Marion Solomon) I Bell Plaza/rPB10 214-464-3400 Manager-BOCC-Technical Support - Dallas: (Becky Brigham) III Bell/r904 214-464-3872 Manager-Building Engineering - Houston: (Charles E. Broussard) 3100 Main/r609 (77002) 713-521-8524 Manager-Safety - Dallas: (Joey Grubbs) I Bell/r910 214-464-8652 Manager-Safety Network Operations - Dallas: (Larry M. Peterson) I Bell/r3240 214-464-8755 Manager-Removal Operations - Dallas: (Mike Miller) I Bell/rl903 214-464-6693 Senior Reports Clerk - Dallas: (Susan Papesh) 3 Bell/r804 214-464-6670 0uS379 BUILDING ASBESTOS COMMITTEE MEETING ATTENDANCE MAY 16, 1991 IN ATTENDANCE: District Manager-Building Operations & Maintenance - Houston: Area Manager-Buildings - Dallas: (Tobey D. Nealy) Area Manager-Architecture - San Antonio: (Pete Campos) Area Manager- Network Engineering - Dallas: (Mel West) Manager-Architecture - Dallas: (Yadira Lopez) Manager-Architecture - Dallas: (Kathy Schneider) Manager-Architecture - Dallas: (David Keeling) Manager-Buildings - Dallas: (J.J. Garza) Manager-Buildings - Dallas: (Marion Solomon) Manager-Buildings - Ft. Worth: (Ralph McCloud) Manager-Buildings - Houston: (Ronald H. Brandenberg) Manager-Removal Operations - Houston: (Helen Parker) Manager-Removal Operations - Dallas: (Mike Miller) Manager-Safety-Network Operations - Dallas: (Larry Peterson) Senior Reports Clerk - Dallas: (Susan Papesh) (Bill Nicks) ABSENT: District Manager-Architecture - San Antonio: (Herb Looney) Area Manager-Architecture - Houston: (Jim White) Area Manager-Environmental Regulation - Houston: (Peter M. Mistrot) Area Manager-Network Operations Staff - Dallas: (Perry G. Lambert) Manager-Architecture - Dallas: (Mike Oliver) Manager-Buildings - El Paso: (Bettve G. Marable) Manager-BOCC-Technical Support - Dallas: (Becky Brigham) Manager-Safety - Dallas: (Joey Grubbs) Manager-Building Engineering - Houston: (Charles E. Broussard) OuS3oO Sub-Committees Established on 7/12/90 1. "Management Plan Development" Yadira Lopez Kathy Schneider (Reported) Ronnie Brandenberg Charles Broussard Marion Solomon GOALS: 1) Prepare a management plan for a small C.O. -COMPLETE 2) Establish a time frame by which all surveyed buildings are to have plans developed by July 18 meeting RESULTS: 1) Management Plan Teams will consist of the Building Manager, an Architect or Engineer, and a Planner. 2) The Management Plans will consist of: MASTER BOOK (GENERIC): *0 & M Procedures; ^Administrative Procedures; - update *Awareness training records for SWBT employees; *Asbestos Practice; *Purple Book; *Green Book REMAINDER IN BUILDING SPECIFIC FILES/BINDERS AT MANAGERS OFFICE *Surve'v;7 *Schedule for removal, enclosure, encapsulation, or 0 & M of asbestos areas; ^Letter of notification to tenants (copy); *Air Monitoring Results; *Follow-up survey reports; *Contact list. *??? ** Both the Master Binder and Individual Building Binders will be kept in the Building Manager's Office. 3) Kathy, Pete and Bill Nicks are to determine and advise committee as soon as possible as to how many management plans can be done by 1/1/92. 0 3SJ *6 3 8 1 Training" Subcommittee Kathy Schneider Mel West Pete Campos Charles Broussard Perry Lambert Ronnie Brandenberg Mike Miller GOALS:1 2 3 4 5 1. Develop and deliver training across Texas for the Asbestos Practice/O&M procedures. (90 day time frame?) - May 16th rough draft of class 2. Modular for needs of different departments. Covers: 1 - 904 Practice 2 -0&M 3 - Management Plant 3. Present final product to committee. - May or June 4. Determine locations and dates for training. 1. Dallas Houston San Antonio Austin Midland Lubbock El Paso Approx. 500-525 persons to be trained from various depart ments. One full day of training at each location 25/class Approx. 32 classes - Concentrated training - O&M by Trainers - Maneck teaches Trainers 2. Possibility of video taping or teleconferencing to reduce training. (Possibly consultation O&M Procedures on tape.) 3. Flow diagram has been developed for class. 4. Presentation of pilot in 60 days 5. Pilot to be presented on July 18th. RESOLUTIONS - STATE OF TEXAS Six (6) copies of Asbestos survey are to be prepared: 2 for BOM I for Arch 1 for Network Operations 1 for Safety 1 for District Asbestos Library 1 for ATT (condo buildings only) INSURANCE A) All policies must be approved by Julie Dople. B) Certificates are required on each job and are approved by the Project Manager. All managers are to keep track of all asbestos related expenditures, "loaded costs". (Page 33) All buildings where asbestos has been identified requires a notice as employees enter the building that asbestos is present. Initial notification through PR. Network Engineering is to receive list of surveyed building from the Architects. To Mel West by 15th of month following quarter end. Architects are to supply a list of surveyed buildings to Safety for six (6) month air monitoring. Safety is to forward air monitoring results to the Architects. All AIA contracts with Scope of Work need not go through Legal. Only if they are modified. Building Managers or an Architect can be responsible for the handling of small glovebag or small abatement type projects. Which group will handle the job is determined by the size and time requirement of the project. For example, a glovebag job can be handled by either group. Abatement of floor tile should be handled by the Architects. Drilling of VAT can be performed by Network: *providing that an Exhibit 24 is completed and approved prior to beginning the work; *the work is done in accordance to the Practice and laws; *that a qualified (16 hr. training) contractor is utilized to do the work; 0uS383 *and that all paperwork is completed and forwarded to the Centralized Record Center immediately upon completion of the work. *See procedure for using "foam" method. (Ref. Letter from Div. Mgr.-Switching and Div. Mgr. - Switching Engr. dated December 28, 1990. File Subject 219.02, 220.0 and 290.4520.) 10. Building asbestos surveys should include testing of standby generator exhaust insulation. 11. "CAD" - Symbols and layers are standardized. Database will be incorporated into CAD. Network Frame Planners are to receive a list of buildings that are on the CAD system. 12. The "Asbestos Action Items" Committee determined that there should be three action levels: significant damage, damage, no damage 13. "Database Establishment and Centralized Bookkeeping" -A PC based data base is to be used. Downloading certain data to TNESS will be investigated. The Asbestos Database will be in DBASE IV incorporated into AUTOCAD. 14. Asbestos contracts can utilize a standard A1A contract with one page Insurance requirements from Risk Management. 0uS384 -60.0902 - Asbestos-Procedures Building Management Programs Dallas, June 5"" 1991 District Manager-Building Operations & Maintenance - Houston (Bill Hicks) District Manager-Architecture - San Antonio: (Herb Looney) Area Manager-Construction Management - Houston: (Peter M. Mistrot) Area Manager-Architecture - Houston: (Jim White) Manager-Architecture - San Antonio: (Pete Campos) Area Manager-Network Engineering - Dallas: (Mel West) Area Manager-Network Operations Staff - Dallas: (Perry G. Lambert) Manager-Architecture - Dallas: (David Keeling) Manager-Architecture - Dallas: (Yadira Lopez) Manager-Architecture - Dallas: (Kathy Schneider) Manager-Buildings - El Paso: (Bettye G. Marable) Manager-Buildings - Ft. Worth: (Ralph McCloud) Manager-Buildings - Dallas: (Marion Solomon) Manager-Building Engineering - Houston: (Charles E. Broussard) Manager-Safety-Network Operations - Dallas: (Larry Peterson) Manager-Architecture - Dallas: (Mike Oliver) Manager-Buildings, - Houston: (Ronald H. Brandenberg) Manager-Buildings - Dallas: (J.J. Garza) Manager-BOCC-Technical Support - Dallas: (Becky Brigham) Manager-Removal Operations - Dallas: (Mike Miller) Manager-Safety - Dallas: (Joey Grubbs) Senior Reports Clerk - Dallas: (Susan Papesh) The next North Texas Building Asbestos Committee meeting will be on Thursday, July 18, 1991, at 9:00 a.m., One Bell Plaza, Room 1310, Dallas, Texas. The meeting will adjourn at 4:30 p.m. Please schedule your plane reservations appropriately. ""--" This meeting will be a pilot course for the Asbestos Training that is to be presented across Texas this year. Attached are May meeting: * Member list * Prior meeting attendee list Subcommittee Assignments/Results * Resolutions OuS'385 BUILDING ASBESTOS COMMITTEE MEETING COVER LETTER May 23, 1991 PAGE 2 Should you have any questions, please contact me on 214-464-2228. Tobey D. Nealy Area Manager-Bldgs. Operations Staff Operations and Maintenance Attachments cc: G.W. Fox Roberta Ballantyne Bob Jackson 0uS386 BUILDING ASBESTOS COMMITTEE North Texas Area _____ Correspondence Identification: 460.0902 - Asbestos-Procedures Building Management Programs Revised: 3/8/91 District Manager-Bldg. Opers. & Mtce. - Houston (Bill Nicks) 3100 Main/r607 (77002) 713-521-6138 District Manager-Architecture - San Antonio: (Herb Looney) 4119 Broadway/'rG60E 512-841-0788 Area Manager-Buildings - Dallas: (Tobey D. Nealy) I Bell/rPCIO 214-464-2228 Area Manager-Environmental Regulation - Houston: (Peter M. Mistrot) 3100 Main/r609 (77002) 713-521-8976 Area Manager-Architecture - Houston: (Jim White) 3100 Main/r609 (77002) 713-521-7203 Area Manager-Architecture - San Antonio: (Pete Campos) 4119 Broadway/rG60J 512-841-0797 Area Manager-Network Engineering - Dallas: (Mel West) I Bell/ri640.08 214-464-5919 Area Manager-Network Operations Staff - Dallas: (Perry G. Lambert) I Bell/r3225 214-464-8361 Manager-Architecture - Dallas: (David Keeling) III Bell/r804 214/464-3834 Manager-Architecture - Dallas: (Yadira Lopez) III Bell/r804 214/464-4762 Manager-Architecture - Dallas: (Kathy Schneider) III Bell/r804 214/464-6075 Manager-Architecture - Dallas: (Mike Oliver) 111 Bell/r804 214-464-4074 Manager-Buildings -Houston: (Ronnie H. Brandenberg) 1310 Richmond/rB23 (77002) 713-520-0698 Manager-Buildings - Dallas: (J. J. Garza) III Bell/rSB-2A 214/464-4879 Manager-Buildings - El Paso: (Bettye G. Marable) 510 Texas/rll5 (79901) 915-542-4670 Manager-Buildings - Ft. Worth: (Ralph McClojid) 1116 Houston/r800 (76118) 817-338-6083 Manager-Buildings - Dallas: (Marion Solomon) I Bell Plaza/rPBlO 214-464-3400 Manager-BOCC-Technical Support - Dallas: (Becky Brigham) III Bell/r904 214-464-3872 Manager-Building Engineering - Houston: (Charles E. Broussard) 3100 Main/r609 (77002) ' 713-521-8524 Manager-Safety - Dallas: (Joey Grubbs) I Bell/r9lo" 214-464-8652 Manager-Safety Network Operations - Dallas: (Larry M. Peterson) I Bell/r3240 214-464-8755 Manager-Removal Operations - Dallas: (Mike Miller) I Bell/rl903 214-464-6693 Senior Reports Clerk - Dallas: (Susan Papesh) 3 Bell/r804 214-464-6670 0uS3S7 BUILDING ASBESTOS COMMITTEE MEETING ATTENDANCE MAY 16, 1991 IN ATTENDANCE: District Manager-Building Operations A Maintenance - Houston: Area Manager-Buildings - Dallas: (Tobey D. Nealy) Area Manager-Architecture - San Antonio: (Pete Campos) Area Manager- Network Engineering - Dallas: (Mel West) Manager-Architecture - Dallas: (Yadira Lopez) Manager-Architecture - Dallas: (Kathy Schneider) Manager-Architecture - Dallas: (David Keeling) Manager-Buildings - Dallas: (J.J. Garza) Manager-Buildings - Dallas: (Marion Solomon) Manager-Buildings - Ft. Worth: (Ralph McCloud) Manager-Buildings - Houston: (Ronald H. Brandenberg) Manager-Removal Operations - Houston: (Helen Parker) Manager-Removal Operations - Dallas: (Mike Miller) Manager-Safety-Network Operations - Dallas: (Larry Peterson) Senior Reports Clerk - Dallas: (Susan Papesh) (Bill Nicks.) ABSENT: District Manager-Architecture - San Antonio: (Herb Looney) Area Manager-Architecture - Houston: (Jim White) Area Manager-Environmental Regulation - Houston: (Peter M. Mistrot) Area Manager-Network Operations Staff - Dallas: (Perry G. Lambert) Manager-Architecture - Dallas: (Mike Oliver) Manager-Buildings - El Paso: (Bettye G. Marable) Manager-BOCC-Technical Support - Dallas: (Becky Brigham) Manager-Safety - Dallas: (Joey Grubbs) Manager-Building Engineering - Houston: (Charles E. Broussard) OOS338 Sub-Committees Established on 7/12/90 1. "Management Plan Development" Yadira Lopez Kathy Schneider (Reported) Ronnie Brandenberg Charles Broussard Marion Solomon GOALS: 1) Prepare a management plan for a small C.O. -COMPLETE 2) Establish a time frame by which all surveyed buildings are to have plans developed by July 18 meeting RESULTS: 1) Management Plan Teams will consist of the Building Manager, an Architect or Engineer, and a Planner. 2) The Management Plans will consist of: MASTER BOOK (GENERIC): *0 M Procedures; Administrative Procedures; - update *Awareness training records for SWBT employees; *Asbestos Practice; Purple Book; Green Book REMAINDER IN BUILDING SPECIFIC FILES/BINDERS AT MANAGERS OFFICE Survey; Schedule for removal, enclosure, encapsulation, or 0 & M of asbestos areas; Letter of notification to tenants (copy); Air Monitoring Results; Follow-up survey reports; Contact list. *??? ** Both the Master Binder and Individual Building Binders will be kept in the Building Manager's Office. */ 60^ 3) Kathy, Pete and Bill Nicks are to determine and advise committee as soon as possible as to how many management plans can be done by 1/1/92. 0uS389 "Training" Subcommittee Kathy Schneider Mel West Pete Campos Charles Broussard Perry Lambert Ronnie Brandenberg Mike Miller GOALS: Develop and deliver training across Texas for the Asbestos Practice/O&M procedures. (90 day time frame?) - May 16th rough draft of class Modular for needs of different departments. Covers: L - 904 Practice 2 -0&M 3 - Management Plan\ Present final product to committee. - May or June Determine locations and dates for training. 1. Dallas Houston w,'b'ah Antonio w'Austin Midland Lubbock v^El Paso Approx. 500-525 persons to be trained from various depart ments. 4lvr*. ^ at eacITlocation 25/class Approx. 32 classes - Concentrated training - Q&M by Trainers - Maneck teaches Trainers 2. Possibility of video taping or teleconferencing to reduce training. (Possibly consultation 0 St M Procedures on tape.) 3. Flow diagram has been developed for class. 4. Presentation of pilot in 60 days.^ 5. Pilot to be presented on July 18th. i % Pt*T ........ "1 * SpuJ \Uf2* fa AM i GjG3S0 RESOLUTIONS - STATE OF TEXAS 1. Six (6) copies of Asbestos survey are to be prepared: 2 for BOH I for Arch I for Network Operations 1 for Safety 1 for District Asbestos Library I for ATT (condo buildings only) 2. INSURANCE A) All policies must be approved by Julie Dople. B) Certificates are required on each job and are approved by the Project Manager. 3. All managers are to keep track of all asbestos related expenditures, "loaded costs". 4. (Page 33) All buildings where asbestos has been identified requires a notice as employees enter the building that asbestos is present. Initial notification through PR. 5. Network Engineering is to receive list of surveyed building from the Architects. To Mel West by I5th of month following quarter end. 6. Architects are to supply a list of surveyed buildings to Safety for six (6) month air monitoring. Safety is to forward air monitoring results to the Architects. 7. All AIA contracts with Scope of Work need not go through Legal. Only if they are modified. 8. Building Managers or an Architect can be responsible for the handling of small glovebag or small abatement type projects. Which group will handle the job is determined by the size and time requirement of the project. For example, a glovebag job can be handled by either group. Abatement of floor tile should be handled by the Architects. 9. Drilling of VAT can be performed by Network: ^providing that an Exhibit 24 is completed and approved prior to beginning the work; *the work is done in accordance to the Practice and laws; *that a qualified (16 hr. training) contractor is utilized to do the work; 0uS391 *and that all paperwork, is completed and forwarded to the Centralized Record Center immediately upon completion of the work. *See procedure for using "foam" method. (Ref. Letter from Div. Mgr.-Switching and Div. Mgr. - Switching Engr. dated December 28, 1990. File Subject 219.02, 220.0 and 290.4520.) 10. Building asbestos surveys should include testing of standby generator exhaust insulation. 11. "CAD" - Symbols and layers are standardized. Database will be incorporated into CAD. Network Frame Planners are to receive a list of buildings that are on the CAD system. 12. The "Asbestos Action Items" Committee determined that there should be three action levels: significant damage, damage, no damage 13. "Database Establishment and Centralized Bookkeeping" -A PC based data base is to be used. Downloading certain data to TNESS will be investigated. The Asbestos Database will be in DBASE IV incorporated into AUTOCAD. 14. Asbestos contracts can utilize a standard A1A contract with one page insurance requirements from Risk Management. 0uS392