Document 4mJyy2R5ww559wJbYOa0BLXj
UC 149-2
UNION CARBIDE
INTERNAL CORRESPONDENCE
RECEIv
MAY 2 r
MINING AND METALS DIVISION
Di'v/sJon Locoison
Mr. W. C. Thurber Metals Division 33th Floor New York, NY
Copy fo
R. J. Kronkhyte R. 0. Marsten G, L. Vessels
P. 0. BOX K, KING CITY. CALIFORNIA 93930
Dafa May 18, 1981
Originating Dept, Answering letter date
Production
.NY.
High Purity Super Standard Grade Standard Grade RG-244
Comments: The 244 circuit produced at 1.71 tons/shift (5-13 tons/day) or 116% of plan. No obvious problems in this circuit.
We are operating without the cooling water in the pellet cooler shell cue to leaks. The screw does not appear to provide adequate cooling by itself, and throughput is down to insure pellets cool enough to be wrapped in plastic. A new pellet cooler trough is to be installed 5/21/Sl.
Shipments
Grade
Domestic
Export
High Purity Super Standard Grade Standard Grade RG-244
61.5 Tons 357 Tons 330.49 Tons 12.4 Tons
7.59 Tons 0.0 Tons 0.0 Tons
15.4 Tons
Inventory
5/16/81 5/9/81 I/I/Si
4693 Tons 4589 Tons 4217 Tons
Safety: There were no accidents this week.
General:
Both the local company-purchased houses have been re-insulated and are placed with a real estate agency for re-sale. Electrical and mechanical installation at ore slurry pit continues as time permits. First on-going weekly meetings of Duality Circle groups--N
r>-C , }l'(coto
R. 0, Marsten
_
/$m
UCC 025354
UC F49 2
UNION CARBIDE
INTERNAL CORRESPONDENCE
MINING AND METALS DIVISION
RECE1 w JUIT5--
I
P. 0. BOX K, KING CITY. CALIFORNIA 33930 y .
To (Name) W. C. Thurber oimion Metals Division loco(ion 38th Floor
New York, NY
Cap/ to
W. B. DeAtley R. J. Kronkhyte J. L. Myers G. L, Vessels
June 2, 1981
Originating Dept, Answering teller data
.X /
suL;#rf Weekly (operating ReporJ/j W/O 5/25/'81 - 5/50/^81 /
Production
High Purity Super Standard Grade Standard Grade RG-244
26.0 0.0
597.4 20.6
Tons Tons Tons Tons
Comments: All operations were shut down for Memorial Day, 5/25/81.
The 244 circuit produced at 1.21 tons/shift or 82% of plan. Some shortage of operators due to sickness.
The main circuit produced at 105.4 tons/day or 109% of plan.
Shipments
Grade
High Purity Super Standard Grade Standard Grade RG-244
Domestic
70.0 Tons 114.7 Tons 423.0 Tons
4.8 Tons
Export
130.3 Tons 0.0 Tons
131.2 Tons 7.5 Tons
Inventory
5/30/81 5/23/81 1/1/81
4603 Tons 4782 Tons 4217 Tons
Safety: There were no accidents this week.
General: J. L. Myers becomes Plant Manager, effective June 1, 1981. W. 3. DeAtley to New York office as Business Analyst.
/ dm
R. O.Marsten
UCC 025355
<JC 149-2
UNION CARBIDE
INTERNAL. CORRESPONDENCE
// / L-
RECEJV -MAY 2 Q
MINING AND METALS DIVISION
P. 0, SOX K, KING CITY, CALIFORNIA 93930
TofNams) Division
location
Mr. W. C. Thurber Metals Division 33th Floor New York, MY
Copy io
R. J. Kronkhyte R, 0. Marsten J, L. Myers G. L. Vessels
Oat* May 26, 1981
Orr'gjrtofj'iicj Dpf.
Asmrerjng /eftef data
'
Subject Weekly Operating Report
W/O 5-17-81 through 5/23-81 /
l / \o-'
Production
High Purity Super Standard Grade Standard Grade RG-244
273 Tons 256.3 Tons 265-3 Tons
23.6 Tons
Comments: The 244 circuit produced at 1.43 tons/shift or 97$ of plan. There were no major problems in this circuit.
The main circuit produced at 82.5 tons/day or 85$ of plan. This rate was slightly low considering the product mix of 50$ standard grade. The pellet cooler which has slowed down production for the past three weeks was finally repaired on Thursday and is now in operating condition.
Shipments
Grade
Domestic
Export
High Purity Super Standard Grade Standard Grade RG-244
4.7 Tons 8l.O Tons 324.9 Tons
9.2 Tons
75.0 Tons 0.0 Tons 0.0 Tons
15-0 Tons
Inventory
5/23/81
5/I6/8I
1/1/31
4782 Tons
4693 Tons
. 4217 Tons
`
Safety: There were no accidents this week.
UCC 025356
UC U9 2
UNION CARBIDE
INTERNAL CORRESPONDENCE
rece/v
MAY \ d
MINING AND METALS DIVISION
To (blame) KmTM location
Mr. W . C. Thurber Metals Division 33th Floor Mew York, MY
Copy to
R. J. Kronkhyte r, 0. Marsten
G. L. Vessels
P 0. SOX K, KING CITY, CALIFORNIA 93930
Don. May 11, 1981
Originofj'ng Depf, Answan'ng /altar da fa
Subject Weekly Operating Repc w/o 5/3/81 - 5/9/frj
Production
High Purity Super Standard Grade Standard Grade RG-244
0.0 373.0 255.0
28.7
Tons Tons Tons Tons
Comments: The 244 circuit produced at 1.43 tons/shift or 97% of plan. There were no major problems in this circuit.
The main plant produced at 94.2 tons/day or 97% of plan. The loss of the pellet cooler shell caused slow production when making Supervis. The retained heat caused melting of the bag wrap when op erating the dryer at normal temperatures. We, therefore, ran the dryer at lower temperatures which cut into the production rates. When we got into bulk cars at the end of the week we attempted to repair the shell. However, it appears to be rusted through in too many spots. We have a new shell here and are looking into what will be required to replace it. This may cause some down time.
Shipments
Grade
Domestic
Export
High Purity Super Standard Grade Standard Grade RG-244
64.0 Tons 180.8 Tons 346.0 Tons
0.0 Tons
36.4 Tons 112.5 Tons 112.5 Tons
5.0 Tons
Inventory
5/9/81 5/2/81 1/1/81
4589 Tons 4705 Tons
4217 Tons
Safety:
m
UCC 025357
UC 143 2
UNION CARBIDE
INTERNAL CORRESPONDENCE
RECE1V
MAY 1
MINING AND METALS DIVISION
r<>(Name) D/mhn
Location
Mr. W, C. Thurber Metals Division
38th Floor
New Y ork, NY
Copy to
R, J. Kronkhyte R. 0. Mars ten
G. L. Vessels
P 0. BOX K. KING CITY, CALIFORNIA 33930
l
Oof April 27, 1981
U
Originating Dept*
Answering letter tfafo
Subject Weekly Operating Report W/O 4/19/81 - 4/25/81
Production
High Purity Super Standard Grade Standard Grade. BQ-2hb
71-3 36.5 486.0 20.6
Tons Tons Tons Tons
Comments:
The RG circuit produced at 1.21 tons/shift or 82% of plan. Lost one shift due to shrink tunnel break down. Also, low viscosity flow bins from "T" run were all that was available at beginning of week.
* The main circuit produced at 104.8 tons/day or 108% of plan. There were no major problems in this part of the plant.
Shipments Grade
Domestic
Export
High Purity Super Standard Grade Standard Grade RG-244
39*6 Tons 11.9 Tons 219-1 Tons 21.2 Tons
35*75 Tons 0.0 Tons
75.0 Tons 15.0 Tons
Inventory
4/25/81 4/l8/8l 1/1/81
46l3 Tons 4566 Tons 4217 Tons
Safety: There were no accidents this week.
General: The installation of the equipment in the slurry pit commenced this week. We lost our main well on Friday, We are now operating on our secondary well wJ^rcTTkeeps up but pumps a great deal of air.
Very truly yours.
UCC 025358
UC 1492
UNION CARBIDE
INTERNAL CORRESPONDENCE
MAr?--
MINING AND METALS DIVISION
jo (Nemo} Dmsion location
Mr. W. C. Thurber Metals Division 38th Floor New York, NY
Copy to
R. J. Xronkhyte R. 0. Marsten G. L. Vessels
Production
P- o. box k, king city, California 93930
Daft May 4, 1981
Orrgjftcfjrtg Dfipf.
.
A/iiworing falser date
Subjoif Weekly Operating Report W/O 4-26-81 through 5-2-81
n f .
High Purity Super Standard Grade Standard Grade RG-244
0.0 Tons 104.7 Tons 603.6 Tons
27.8 Tons
Comments: The 244 circuit produced at 1.39 tons/shift (4.17 tons/day) or 94$ of plan. No obvious problems in this circuit.
The main plant produced at 106.2 tons/day or 110$ of plan. Good production rates resulted from mostly standard grade production. We are operating without the cooling water in the pellet cooler shell due to leaks. The screw appears to provide adequate cooling by itself.
Shipments
Grade
High Purity Super Standard Grade Standard Grade HG-244
Domestic
1.4 Tons 112.5 Tons 379-6 Tons
0.0 Tons
Export
8.3 Tons 0.0 Tons 75.0 Tons 22.1 Tons
Inventory
5/2/81 4/25/81 I/1/8I
4705 Tons 46l8 Tons 4217 Tons
Safety: 'There were no accidents this week.
General: Started hauling ore today, Started introducing Quality Circles to the hourly employees today.
/d m
UCC 025359
UC I 49 2
UNION CARBIDE
INTERNAL CORRESPONDENCE
MINING AND METALS DIVISION
rofNo.iTM) Di'Wsion locafron
Mr. W. C. Thurber Metals Division ' 38th FlOOr New York, NY
Copy to
R. J. Kronkhyte R. 0. Marsten G. L. Vessels
P. 0. BOX K, KING CITY, CALIF0RflfcgT3f* j ^
Oof. April 6, 1981
Originating 0pf.
Answering leSler'data
Subfset Vfeekly Operating Report W/$t 3/29/81 - 4/4/81
^{
/ 7-
/ -f > V,
Production
High PuritySuper Standard Grade Standard Grade RG-244
439.55 Tons 0.0 Tons 0.0 Tons
24.18 Tons
Comments:
The RG circuit produced at 1.21 tons/shift or 82$ of plan. Appar ently much time was lost due to having the bagger help the wet endoperator fix leaks in the dryer dust collector. The secondary Rietz mill is again operating and the second filter press is once again in service. The wet end should now be able to feed the dryer at capacity.
The main circuit produced at 65-93 tons/day or 68$ of average plan. With high purity we actually need to produce around 75-80 tons/day to absorb at a proper rate.
Shipments
,
Grade
Domestic
Export
High Purity Super Standard Grade Standard Grade RG-244
82.5 Tons 29.4 Tons 285.8 Tons 10.4 Tons
7.1 Tons 0.0 Tons 0.0 Tons 13.9 Tons
Inventory: 4/4/81 4598 tons compared to 4217 tons on l/l/8l.
Safety:
There were no accidents this week. During the first quarter the main tenance crew, one shift crew, the mine crew and the office staff won the safety awards for having no medical cases. The other three shift crews had four medical cases during the quarter. The members of the safe crews each received a $5.00 award.
id
W. B. DeAtley /dm
UCC 025360