Document 4mJyy2R5ww559wJbYOa0BLXj

UC 149-2 UNION CARBIDE INTERNAL CORRESPONDENCE RECEIv MAY 2 r MINING AND METALS DIVISION Di'v/sJon Locoison Mr. W. C. Thurber Metals Division 33th Floor New York, NY Copy fo R. J. Kronkhyte R. 0. Marsten G, L. Vessels P. 0. BOX K, KING CITY. CALIFORNIA 93930 Dafa May 18, 1981 Originating Dept, Answering letter date Production .NY. High Purity Super Standard Grade Standard Grade RG-244 Comments: The 244 circuit produced at 1.71 tons/shift (5-13 tons/day) or 116% of plan. No obvious problems in this circuit. We are operating without the cooling water in the pellet cooler shell cue to leaks. The screw does not appear to provide adequate cooling by itself, and throughput is down to insure pellets cool enough to be wrapped in plastic. A new pellet cooler trough is to be installed 5/21/Sl. Shipments Grade Domestic Export High Purity Super Standard Grade Standard Grade RG-244 61.5 Tons 357 Tons 330.49 Tons 12.4 Tons 7.59 Tons 0.0 Tons 0.0 Tons 15.4 Tons Inventory 5/16/81 5/9/81 I/I/Si 4693 Tons 4589 Tons 4217 Tons Safety: There were no accidents this week. General: Both the local company-purchased houses have been re-insulated and are placed with a real estate agency for re-sale. Electrical and mechanical installation at ore slurry pit continues as time permits. First on-going weekly meetings of Duality Circle groups--N r>-C , }l'(coto R. 0, Marsten _ /$m UCC 025354 UC F49 2 UNION CARBIDE INTERNAL CORRESPONDENCE MINING AND METALS DIVISION RECE1 w JUIT5-- I P. 0. BOX K, KING CITY. CALIFORNIA 33930 y . To (Name) W. C. Thurber oimion Metals Division loco(ion 38th Floor New York, NY Cap/ to W. B. DeAtley R. J. Kronkhyte J. L. Myers G. L, Vessels June 2, 1981 Originating Dept, Answering teller data .X / suL;#rf Weekly (operating ReporJ/j W/O 5/25/'81 - 5/50/^81 / Production High Purity Super Standard Grade Standard Grade RG-244 26.0 0.0 597.4 20.6 Tons Tons Tons Tons Comments: All operations were shut down for Memorial Day, 5/25/81. The 244 circuit produced at 1.21 tons/shift or 82% of plan. Some shortage of operators due to sickness. The main circuit produced at 105.4 tons/day or 109% of plan. Shipments Grade High Purity Super Standard Grade Standard Grade RG-244 Domestic 70.0 Tons 114.7 Tons 423.0 Tons 4.8 Tons Export 130.3 Tons 0.0 Tons 131.2 Tons 7.5 Tons Inventory 5/30/81 5/23/81 1/1/81 4603 Tons 4782 Tons 4217 Tons Safety: There were no accidents this week. General: J. L. Myers becomes Plant Manager, effective June 1, 1981. W. 3. DeAtley to New York office as Business Analyst. / dm R. O.Marsten UCC 025355 <JC 149-2 UNION CARBIDE INTERNAL. CORRESPONDENCE // / L- RECEJV -MAY 2 Q MINING AND METALS DIVISION P. 0, SOX K, KING CITY, CALIFORNIA 93930 TofNams) Division location Mr. W. C. Thurber Metals Division 33th Floor New York, MY Copy io R. J. Kronkhyte R, 0. Marsten J, L. Myers G. L. Vessels Oat* May 26, 1981 Orr'gjrtofj'iicj Dpf. Asmrerjng /eftef data ' Subject Weekly Operating Report W/O 5-17-81 through 5/23-81 / l / \o-' Production High Purity Super Standard Grade Standard Grade RG-244 273 Tons 256.3 Tons 265-3 Tons 23.6 Tons Comments: The 244 circuit produced at 1.43 tons/shift or 97$ of plan. There were no major problems in this circuit. The main circuit produced at 82.5 tons/day or 85$ of plan. This rate was slightly low considering the product mix of 50$ standard grade. The pellet cooler which has slowed down production for the past three weeks was finally repaired on Thursday and is now in operating condition. Shipments Grade Domestic Export High Purity Super Standard Grade Standard Grade RG-244 4.7 Tons 8l.O Tons 324.9 Tons 9.2 Tons 75.0 Tons 0.0 Tons 0.0 Tons 15-0 Tons Inventory 5/23/81 5/I6/8I 1/1/31 4782 Tons 4693 Tons . 4217 Tons ` Safety: There were no accidents this week. UCC 025356 UC U9 2 UNION CARBIDE INTERNAL CORRESPONDENCE rece/v MAY \ d MINING AND METALS DIVISION To (blame) KmTM location Mr. W . C. Thurber Metals Division 33th Floor Mew York, MY Copy to R. J. Kronkhyte r, 0. Marsten G. L. Vessels P 0. SOX K, KING CITY, CALIFORNIA 93930 Don. May 11, 1981 Originofj'ng Depf, Answan'ng /altar da fa Subject Weekly Operating Repc w/o 5/3/81 - 5/9/frj Production High Purity Super Standard Grade Standard Grade RG-244 0.0 373.0 255.0 28.7 Tons Tons Tons Tons Comments: The 244 circuit produced at 1.43 tons/shift or 97% of plan. There were no major problems in this circuit. The main plant produced at 94.2 tons/day or 97% of plan. The loss of the pellet cooler shell caused slow production when making Supervis. The retained heat caused melting of the bag wrap when op erating the dryer at normal temperatures. We, therefore, ran the dryer at lower temperatures which cut into the production rates. When we got into bulk cars at the end of the week we attempted to repair the shell. However, it appears to be rusted through in too many spots. We have a new shell here and are looking into what will be required to replace it. This may cause some down time. Shipments Grade Domestic Export High Purity Super Standard Grade Standard Grade RG-244 64.0 Tons 180.8 Tons 346.0 Tons 0.0 Tons 36.4 Tons 112.5 Tons 112.5 Tons 5.0 Tons Inventory 5/9/81 5/2/81 1/1/81 4589 Tons 4705 Tons 4217 Tons Safety: m UCC 025357 UC 143 2 UNION CARBIDE INTERNAL CORRESPONDENCE RECE1V MAY 1 MINING AND METALS DIVISION r<>(Name) D/mhn Location Mr. W, C. Thurber Metals Division 38th Floor New Y ork, NY Copy to R, J. Kronkhyte R. 0. Mars ten G. L. Vessels P 0. BOX K. KING CITY, CALIFORNIA 33930 l Oof April 27, 1981 U Originating Dept* Answering letter tfafo Subject Weekly Operating Report W/O 4/19/81 - 4/25/81 Production High Purity Super Standard Grade Standard Grade. BQ-2hb 71-3 36.5 486.0 20.6 Tons Tons Tons Tons Comments: The RG circuit produced at 1.21 tons/shift or 82% of plan. Lost one shift due to shrink tunnel break down. Also, low viscosity flow bins from "T" run were all that was available at beginning of week. * The main circuit produced at 104.8 tons/day or 108% of plan. There were no major problems in this part of the plant. Shipments Grade Domestic Export High Purity Super Standard Grade Standard Grade RG-244 39*6 Tons 11.9 Tons 219-1 Tons 21.2 Tons 35*75 Tons 0.0 Tons 75.0 Tons 15.0 Tons Inventory 4/25/81 4/l8/8l 1/1/81 46l3 Tons 4566 Tons 4217 Tons Safety: There were no accidents this week. General: The installation of the equipment in the slurry pit commenced this week. We lost our main well on Friday, We are now operating on our secondary well wJ^rcTTkeeps up but pumps a great deal of air. Very truly yours. UCC 025358 UC 1492 UNION CARBIDE INTERNAL CORRESPONDENCE MAr?-- MINING AND METALS DIVISION jo (Nemo} Dmsion location Mr. W. C. Thurber Metals Division 38th Floor New York, NY Copy to R. J. Xronkhyte R. 0. Marsten G. L. Vessels Production P- o. box k, king city, California 93930 Daft May 4, 1981 Orrgjftcfjrtg Dfipf. . A/iiworing falser date Subjoif Weekly Operating Report W/O 4-26-81 through 5-2-81 n f . High Purity Super Standard Grade Standard Grade RG-244 0.0 Tons 104.7 Tons 603.6 Tons 27.8 Tons Comments: The 244 circuit produced at 1.39 tons/shift (4.17 tons/day) or 94$ of plan. No obvious problems in this circuit. The main plant produced at 106.2 tons/day or 110$ of plan. Good production rates resulted from mostly standard grade production. We are operating without the cooling water in the pellet cooler shell due to leaks. The screw appears to provide adequate cooling by itself. Shipments Grade High Purity Super Standard Grade Standard Grade HG-244 Domestic 1.4 Tons 112.5 Tons 379-6 Tons 0.0 Tons Export 8.3 Tons 0.0 Tons 75.0 Tons 22.1 Tons Inventory 5/2/81 4/25/81 I/1/8I 4705 Tons 46l8 Tons 4217 Tons Safety: 'There were no accidents this week. General: Started hauling ore today, Started introducing Quality Circles to the hourly employees today. /d m UCC 025359 UC I 49 2 UNION CARBIDE INTERNAL CORRESPONDENCE MINING AND METALS DIVISION rofNo.iTM) Di'Wsion locafron Mr. W. C. Thurber Metals Division ' 38th FlOOr New York, NY Copy to R. J. Kronkhyte R. 0. Marsten G. L. Vessels P. 0. BOX K, KING CITY, CALIF0RflfcgT3f* j ^ Oof. April 6, 1981 Originating 0pf. Answering leSler'data Subfset Vfeekly Operating Report W/$t 3/29/81 - 4/4/81 ^{ / 7- / -f > V, Production High PuritySuper Standard Grade Standard Grade RG-244 439.55 Tons 0.0 Tons 0.0 Tons 24.18 Tons Comments: The RG circuit produced at 1.21 tons/shift or 82$ of plan. Appar ently much time was lost due to having the bagger help the wet endoperator fix leaks in the dryer dust collector. The secondary Rietz mill is again operating and the second filter press is once again in service. The wet end should now be able to feed the dryer at capacity. The main circuit produced at 65-93 tons/day or 68$ of average plan. With high purity we actually need to produce around 75-80 tons/day to absorb at a proper rate. Shipments , Grade Domestic Export High Purity Super Standard Grade Standard Grade RG-244 82.5 Tons 29.4 Tons 285.8 Tons 10.4 Tons 7.1 Tons 0.0 Tons 0.0 Tons 13.9 Tons Inventory: 4/4/81 4598 tons compared to 4217 tons on l/l/8l. Safety: There were no accidents this week. During the first quarter the main tenance crew, one shift crew, the mine crew and the office staff won the safety awards for having no medical cases. The other three shift crews had four medical cases during the quarter. The members of the safe crews each received a $5.00 award. id W. B. DeAtley /dm UCC 025360