Document 4aqEXLddj8rYgxeg2Or0yD98G
IVIUllbdlllU //// Dictate in sequence:
1. HEADING INFORMATION 2. NAMES OF ADDRESSEES 3. NAMES OF CARBONEES , 4. IMMEDIATE ACTION NEEDED 5. REPORT ON CALL
CALL REPORT - ORGANIC DIVISION
/ ~J$TOMER NAME
v\
LlTJB/LR tv?03. .120.'
CITY AND STATE
DATE RECEIVED
date of cm
1 /0 7/'p DATE TYPED '
_________________ Los. Ar^igleg, On._______________ 1/28
1 /oc
CUSTOMER MAILING LIST CHANGES - SERVICE CENTER USE ONLY '
NAME AND HUE
PUT TAKE ON OFF
MP MAG.
CATEGORY CCSSS
REPORT CAPTIONS:
1. OBJECTIVE 2. PERSONS CONTACTED 3. RESULTS 4. ACTION REQUIRED
REGION
SERVICE CENTER
SALESMAN
Eastern:_______________ Los Angeles_____ , --------- T.-- H. Davidson/ jfo
TO J. R. Fallon/ht. Louis
CC cf D.E. ...Roush/St. Louis R. A. Garcia/Akron
Persons Contacted: Riclc Richards, Manufacturing Supervisor Chris Fehling, Process Engr.
Purpose of Call: Meet with Lever personnel concerning condition of .. Therminol FR-2 in their systems.
Results: Pbeert Lever Brothers sample showed viscosity has risen to _
9313 cs. and hi-boiler content to 11.5m. Today's meeting was set up after I had informed Richards by phone of the condition of the fluid and our - recommendation that it immediately be replaced.
Only last summer., the condition of the PR-2 in this system was apparently
good. Analysis at that time showed a viscosity of 33 cs. although 1'urtne examination by C-LC showed that th fluid contained about 53 contamination, After several tests by research, it was concluded that this contaminate was a high molecular weight organic acid. This 'was reported to Lever- Bros. and it was emphasised that their re earch people should, confirm SUSWl this fact. Apparently, the presence of this acid (later reported to be stearic acid, by Richards) has caused a so ere buildup of carbon in the system ns well as significant degradation of the PR-2.
It was recommended that the present fluid be immediately drained from the systemand replaced with ER-1. In addition, a seal flush - system for the main Therminol pumps was recommended to reduce mechanical seal failures which have been occurring as a result of the carbon buildup. Details of the reeonimeridations are contained in a letter to Lever Brothers dated 1/23.
S All- from Level' who were in attendance were very disturbed by the degraded
condition of the Theminol, but agreed that it must be changed. At
several points during the meeting, there was ffirther evidence, particularly
by Maintenance people, that such contamination of the Therminol had
occurred. In one instance, it was reported that Ther-mindl was seen pouring
from one of the process pumps. Although the pump -was tested for leaks, ami
none were found, it is obvious that The-rminol was finding its way into
the product and vice-versa. Richards stated that he would contact the
engineering office in'N.Y* to report fluid condition and confirm the fact
that the fluid should be changed. They anticipate shutting down In the
next 2 to 4 wks. in order to affect the change. Information on
.
S-331 (REV. 12/68)
2- REGIONAL OFFICE COPY
DSW 435052
STLCOPCB4088113
fUfisdriio
CALL REPORT - ORGANIC DiViSiON
DICTATE IN SEQUENCE:
! 1. HEADING INFORMATION / 2. NAMES OF ADDRESSEES ' 3. NAMES OF CARBONEES
' 4. IMMEDIATE ACTION NEEDED 5. REPORT ON CALL
TOMER NAME
DATE OF CALL
.lever -Bros._____________ Inc....
CITY AND STATE
DATE RECEIVED
DATE TYPED
. _______________ Pr:::o 2_________________________
CUSTOMER MAILING LIST CHANGES - SERVICE CENTER USE ONLY
NAME AND TITLE
PUT ON
TAKE OFF
MP MAG.
CATEGORY CODES
REPORT CAPTIONS:
1. OBJECTIVE 2. PERSONS CONTACTED 3. RESULTS 4. ACTION REQUIRED
REGION
SERVICE CENTER
SALESMAN
TO CC
contacting [-ilt Together!' of Fin ett ran given to aichards since he felt that even if the recovered fluid would not be used here, it could be urn
in the 1C-2 GyatOivin at Lever Boo ,L I-i i a o .LN i-V-A 1 C ilGO -1/0 j .;0. tPiC.) j.cij O; O i iv < ^
e.r. .
Total BSiSS nyataei fill here la appraxirately hoOO gallons. it v:ae re
orvTiondod tort the nor fluid can go he
rather tnau Fh-2 since ir -:
will give tno.Ct icov-e r001:1 foe n a ;rp.;. mc.narcnj j.,m.Oi!tno v/eunn
follow this rceoprenention rnle n -a-
engineering reported core
reason why they should stay v;ith PT.-2.
s - 331 (REV. 12/63)
DSW 435053
2- REGIONAL OFFICE COPY
STLCOPCB4088114