CONSTRUCTION 01VISIGN ANNUAL REPORT * SAFETY IS 8 3 On-the-Job Safety Du Pont and CPPC forces achieved a frequency rate of .141 injuries per 200,000 hours worxed in 1383. This compares with rates of .035 in 1982 and .077 in 1981. Nine LnC injuries were experienced. The following compares performance during the past three years: 1981 1982 1983 L)u Pont Hours t of Total Hours Frequency Rate 4,744,182 21 .00 4,062,998 23 .00 4,339,489 34 .046 CPPC Open Shop Hours 1 of Total Hours Frequency Rate 12,369,892 S3 .032 8,747,293 50 .00 4,422,723 35 . 2'i CPPC Closed Shop Hours \ of Total Hours Frequency Rate 6,100,876 26 .229 4,639,329 27 .129 4,004,743 31 . 100 CPPC Total Hours 8 of Total Hours Frequency Rate 18,470,758 80 .098 13,386,622 77 .045 8,427,463 66 .190 Division Total Hours Frequency Rate 23,214,950 .077 17,449,620 .035 12,766,957 .141 For 1988 we continued our lost workday frequency rate goal of .090. DU? 0918908 DU 032462 August 25, 1983 File B. Lost Workday Cases 1983 June 6 Spruance Brown 6 Root A structural ironworker helper received multiple fractures to his right great toe and a simple fracture to his right second toe when an approx. 4C0 lb. louver counterweight fell across tne toes of his right foot; he was not wearing safety shoes. July 8 Savannah River - Miller Dunn Electrical Company - An electrician was installing conduit above a duct. He climbed on top of the duct to get a better working position. His foot slipped off of the angle iron duct support and he stepped on a section of sheet metal duct causing it to break away. He fell 12 feet to the bottom of the duct. He suffered a compressed fracture of the vertebrae. July 12 (3) Pontchartrain - Payne 8 Keller - A cement finisher, a laborer and a layout carpenter were doing finishing work in the DCB area. There was an explosion and flash fire. All three were hospitalized with burns. The cement finisher had second and third degree bums over 60 percent of his body. The laborer had second degree burns over *0 percent of his body. The layout carpenter bad second degree burns over 30 percent of his body. Sept. 24 Memphis B. F. Shaw - A boilermaker, working in a drying tower, stepped on a 5/8" plywood hole cover which gave way and he fell 17 ft. He suffered a fracture to his left foot and multiple contusions and lacerations. Oct. 19 May Plant - Daniel Construction - A sheetmetal welder was pulling a large work table on casters when the heel of his right foot was caught and wedged between a leg support and the concrete floor. He suffered an evulsion fracture of the interior talus of the right foot. Oct. 25 Cooper River * Daniel Construction - A millwright was lifting a block of steel weighing approximately 155 lbs to a shop table when his back "popped". He suffered severe back strain with possible disc involvement. (Reclassified March 1984.) Nov. 21 Savannah River - Du Pont * A laborer stepped on his own shoe lace and tripped falling against a bench in the Change House. He suffered four fractured ribs and a collapsed lung, ot/p 3913909 DU 032463 Injury Summary Craft Involvement No. Percent of Total Labor 2 Structural Ironworker 1 Electrical 1 Cement Finisher Carpenter 1 1 Boilermaker Sheet Metal 1 1 Mi 1lwright 1 22.2 11.1 11.1 11.1 11.1 11.1 11.1 11.1 C. Restricted Workday Cases In 1983 the Division experienced 26 restricted workday cases for an RWC frequency rate of .407 versus .400 in 1982. There was a ratio of 3.25 RWC injuries for every LWC, while in 1982 there was a ratio of 11.3 to 1. D. Insurance Workers' Compensation cost per nan-hour increased fron $.067 in 1982 to $.104 in 1983. General liability activity was up with eleven suits filed versus six in 1982. Total demand was $31MM with six (6) unspecified. Workers' Compensation losses for fiscal year ending September 30, 1983 were $791,112 down from $885,358 in 1982. Premiums generated were $2,487,844 versus $4,446,022 in 1982. Loss ratio for the division was 31.8% up from 18.2% in 1982. Totals differ somewhat from Kemper Loss Control Summary District loss ratios and cost per man-hour were: Loss Ratio Cost per Man-Hour W. S. Free S6.3% $.182 H. C. Marden 7.0% .025 J. T. Chesser 17.8% .072 These figures do not include experience at Belle, Cireleville, Savannah River, Washington Works, or any Du Pont employees. DUP 0918910 DV 032464 4 August 25, 1933 File Loss ratios for contractors generating more than S50M in premiums: B. F. Shaw Blount Brothers Brown S Root Daniel Davis Electric Fabrication Services H. B. Zachry Payne i Keller G.C. .S3. 9t 1 1 118.. 9% l\ 92. 71 13. 01 17. 3t 200. 31 SOW:jab Attachment OUP 0918911 DU 032465 ADDENDUM A-l WORKERS' COMPENSATION LOSSES 10/1/82 - 9/30/83 Site Premium Brevard Cape Fear Cooper River Fayettevilie Florence Front Royal Kinston May Spruance Waynesboro $ 38,133 248,328 37,277 23,08* 99,139 14,357 2,570 83,538 237,336 1*4.665 TOTAL H. C. Marden S928.477 Beaumont/Sabine $ Corpus Christi Johnsonville LaPorte/Deer Park Louisville Memphis Niagara Falls Old Hickory Pontchartrain Victoria 267,730 138,SS4 34,812 89,582 51,471 80,729 19,358 6,320 139,460 220,605 TOTAL W. S. Free Albany Shops Exp. Station Tallahassee $1 ,099,121 $ 52,357 398,086 6. 350 TOTAL J. T. Chesser $456,793 Losses $ 8,514 4,122 1,018 411 17,446 55 0 18,648 11,162 3.780 $65,156 $67,961 15,898 22,659 32,258 760 13,664 63 38,410 405.482 21.134 $618,289 $ 6,006 74,809 670 $ 81,485 Loss Ratio l 22.3 1.7 2.7 1.8 17.6 .4 0 22.3 4.7 2.6 7.0 25.4 11.S 65.1 36.0 l.S 16.9 .30 563.2 214.0 9.6 56.3 11.5 18.8 10.6 17.8 Cost Per Man-Hour $.060 .004 . 009 . 004 . 064 .002 . 000 . 068 . 026 .012 $.025 $.096 .041 . 212 .134 .005 .059 .003 1.73 1.00 .018 $.182 $ .034 .081 .022 $.072 UUP U918912 DU 032466 ADDENDUM A-2 Contractor Premium BIB Insulation, Inc. $ 19,620 Blanton Electric 20,108 Blount Brothers Corp. 174,936 Brown and Root 610,137 Cardinal Industrial Complete Sheetmetal, Inc. 6,943 1,334 Daniel Construction Co. 449,894 Davis Electric Edenfield Electric 103,402 279 Experimental Station Contr. 398,086 Fabrication Services S 2,35 7 General Welding Co 7,592 Henderson Electric 7,020 Lawrenceburg 1,712 McCabe Corcoran 1,108 Niagara Insulation, Inc. 7 Payne 8 Keller G.C. 189,460 Quackenbush 3,453 B. F. Shaw Co. ISO,692 Sicoli-Massaro 18,243 Standard Electric 12,767 John Wile Construction Co. 28,582 Young Insulation 9,507 H. B. Zachry __ 220,605 DIVISION TOTAL $Z 487,844 Loss $ 1,041 0 1,908 72,582 501 53 36,403 95,877 0 74,809 6,807 0 0 0 63 0 379,449 0 81,192 0 1,489 241 525 38,167 $791,112 Totals differ from Kemper Loss Control Summary Ratio \ 5.3 0.0 1.1 11.9 7.2 4.3 8.1 92.7 0.0 1.5 13.0 0.0 0.0 0.0 5.7 0.0 200.3 0.0 53.9 0.0 11.7 .8 5.5 17.3 31.8 DUP 0918913 t)XJ 032467