'.PROGRESS REPORT
TECHNICAL SERVICES DENT.
8. KRUMNRICH PLANT
. N.Q. XRUHMRICH PLANT
BG.L. Bratsch B *D.W. Jackson . 0
DD.J. O'Toole
0
ts
B B.W. Corlew * B
0 R.M. McCutcha m
*0 C.F. Buckley B B L.W. Sprandel <E
BP
B
0 `0 ' 0
El
*m
^0
JOE NO.
91570?4119
REPORT NO.
(*)
I DATE
GENERAL OFFICE
OTHERS
D M. P. Lux
Anniston
D.
Danna
(4)
B J.C.
t
Landwehr
O D.B. Hosmer/
Nitro
P.J. Holzapfel P W.R. Kellogg
R.E. Howard
S. 2nd St.
*@J.R. Savage 13P.0. DeOarmo *W. Papageorge *QT.M. Patrick
**0 J.F. Quinn
*0 *0 R.L. Wiese . *E
TITLEl
WATER POLLUTION - AROCLOR CONTROL
personneli W. A. Krull (Wi C. Engman) B. L. Blgge (T. M. Morrow)
PROBLEM: SUMMARY
Reduce Aroclor water pollution at Department 246.
As a continuation to the Aroclor pollution reduction program, the losses from Dept. 246 were measured at the beginning of 1970 to be in excess of 500 pounds/day with intermittent large spills of 2 - 4000 pounds. These losses occurred at the scrubber and through leaks and spills to the trench sewers.
To reduce the loss at these points, six projects were installed at an estimated cost of $49,400 of which $50,000 was new capital. These projects reduced the Aroclor losses to about one pound per day from the two points.
One additional $40,000 ($57*500 capital) project is approved to install concrete pads and curbing around the tank farm and loading docks. A settling basin will intercept the sewers from these areas. This will reduce losses from water run-off and spills.
Monitoring will continue on the effluent streams from the depart ment .
-^p_, ($&c. C
w/a. Krull
'
/br
Technical Services Dept.
DSW 258034
. COMPANY CONFIDENTIAL INFORMATION
This document la tha property of Monaaato Company and the reclpiet* la reapooaibU far ita aafahaeplag and dlapoettlon. It contalna confide** tlal Information of Mona anto Company which muet not bo reproduced, revealed to unautboriaed pereona or aant eutalde tha company without P,0P*r authorisation. Either retain in aecure filer or deatroy.
form watt aoo rev-2/M
STLCOPCB4061746
91570:4119(4)
2 December 15, 1970
BACKGROUND
This report deals primarily with steps taken within Dept. 246 to reduce Arcelor losses to the sewer. At present, two sewer streams leave Dept. 246. These are the combined trench sewers and the, scrubber sewer line.
Trench Sewer Measurement and Modifications
At first, losses here could not be accurately measured but Aroclor was
visible in the bottom of the trenches. Two projects were installed
which have reduced the loss at this point to 0.5#/day and improved
accuracy of measurement.
Approximate
Project Title
Capital Estimate
Expense Estimate
^nstal-leek..,.. "Date
Benefits
Sewer Basin 1795
(Bigge)
$7000
$7000
1/1/10
Intercepts Aroclor from large spills and leaks which flow into the trench sewers. Reduced loss to about 0.5 #/day.
Absorber Relief Recycle
1512 (Krull)
$4500
$1500
7/1/70
Recycled relief lines from four absorbers. Prevented large losses to sewer basin from absorbers.
Scrubber Sewer Measurement and Modification
Losses from the scrubber were estimated at about 500 #/day. This breaks down into about 250 #/day liquid and 50 #/day mist which flowed to the scrubber on a routine basis. Non-routine losses occurred due to level controller malfunctions on the continuous blow tank, and lack of piping to enable demisting of off-gas before sewering in Dept. 246. Pour projects were installed which reduced the loss at this point to about 0.5 #/day.
. Project Name '
Blow Tank Repiping
1495 (Bigge)
Capital Cost
Expense Cost
$5400
Date Completed
4/1/70
DSW 258035
Benefits
Used intermediate stor= age tank to intercept blow tank overflow. Malfunctions of level controller no longer causes loss to sewer. Prevented 2 large spills from going to sewer.
STLCOPCB4061747
91370s4119(4)
-3-
December 15, 1970
Scrubber Sewer Measurement and Modification (continued)
Project Name
Capital Cost
Expense Cost
Date Completed
Benefits
Liquid Trap Minor (Production)
2/1/70
Trapped liquid going to scrubber. Reduced loss by 250 #/day.
Off=Gas Piping 1948
(Krull)
$1500
5/14/70
Piping Installed to allow off=gas to be demisted before sewering in Dept. 246.
Blow Tank Demister
2031 (Krull)
$17,000
$5500
10/19/70
Installed Brink Mist Eliminator to intercept blow tank gas flowing to scrubber. Reduced
loss to 0.5#/day. The reduced air flow increase scrubber capacity to drown HC1. By reworking condensate, about $2^000 per year yield savings will be realized.
Department Losses Summary
Department losses to the sewer through the scrubber and trench sewers have been reduced from more than 300 #/day to about 1 #/day. Provisions to intercept 800 gal. spills have been installed.
Future Work
The losses from the department will be monitored to insure the levels remain at existing low levels. An additional project (#2422} by B,, Bigge is approved to install concrete paving and curbing around the tank farm and loading areas. The sewers from these areas will have an intercepting basin (3500 gal.) to catch Aroclor run off from spills and leaks.
(EDC design 1/1/71).