Document 4aRE3bja3xeLGJKpp0k2bv4Xe

CURfteNT oevEI.OPMENW -- --1 3 Another rejectee 1.4.- IcUon mendment would h:''"- required ETA to receive from every registrant a fu description of **'M* ami icsull* on ehcinical being considered, and would imvc required that material sub mitted in SUppuil nl .1 uijslialion be available Tot public scrutiny before of lire pcxticide. The lubcnmiuiMt v! u-|o* led the Mart-Nelson amendment which would lwi'< uilovud "any interested person" to participate fully tn liratings. A subcommittee spokesman aaid the bill aln-suly includes language allowing `'Oliver interested person*'' in participate. Other llait-Nehnn amendments rejected by the sub committee Include*) fhoae regarding advisory commiltecs of tire National Academy of Sciences, increasing the penalty for mnicumpliaiKe by private applicators from SI,1000 to $10,000, and including pesticides produced for export under review. The House language, which exempts pesticides produced solely for export from requirements uf (MK 10792), wax adopted. The subcommittee also rejected amendments which would relieve IJPA of the cost end problems of disposing of canceled pesticides, would require referral of scientific questions directly to NAS rather then to an advirory committee, would allow use of a pesticide on pests not included on a label if not prohibited, and would provide for worker protection. Delay of the project also would 1 't pending the w,.., -1._./! of environmental, engineering, and construc tion studies for a Canadian route, he said. The Trans-Canada route would cause mote damage to terrain and biotic habitat than the Alaskan mute since it would traverse a greater area of permafrost, he said. While die Trans-Alaska route involves a greater pollution risk fiom potential earthquakes and from the tanker route from Valdez to the lower 48 slates, steps have been and will be taken to protect against such risks, he stated, and added that strict regulations are being developed to minimize the threat of oil pollution in the marine en vironment. Mr. Morton said oil should be delivered via the Trans- Alaska route by 1976, as compared to three to five additional years for the Trans-Canada line. Me said that it is "in the interest of national security, balance of pay ment, and reliability of energy supply to achieve early delivery of North Slope oil" to reduce U.S. dependence on oil imports. The Wilderness Society, Friends of the Earth, and the Environmental Defense Fund, Inc., asked the U S. District Court in Washington, May 11 to block the department's proposal to issue the right-of-way permits. Chemicals Petroleum i INTERIOR MAKES DECISION TO GRANT / RIGHT-OF-WAY PERMITS FOR ALASKAN OIL / A decision lo grant right-of-way permits for the pro posed Trans-Alaska pqveline was announced by Interior Secretary Rogers C.B. Morion on May 11. I The actual permits cannot be issued at this time because of injunctions issued in pending litigation. Permfs will be issued as soon as such action can be taken without violating any court order. Mr. Morton said that while development of Pnidhoe Bay oil will involve tome environmental risks and costs, the decision is tn the best interests of the U.S. lie mid the U.S. demand for oil by the year I960 will range between 20 million and 25 million barrels |>er day, and that domestic production would be as low as nine million lo 12 million barrels per day without the North Slope oil. The figures include the reasonable prospects of developing other energy sources, he noted. Serious consideration was given to the alternative Prud- hoe Bay Vaidez route passing near Fairbanks, Alaska, and to the IVane-Alaska-Canada route along Ihe MacKanzie River to Edmonton, Mi. Morton slated. However, he said Out routes requiring tankers via the Northwest Passage, Itcimfort Sea, or Bering Sea "arc not technologically feasible at this time," and Ural both land routes would require 1 right-of-way permit over Alaska terrain. Mr. Morton said a bilateral arrangement for a Trans- Alaska route presently is impractical because the U.S. require* the entire capacity of any oil; pipeline and there would be uncertainty and delay in arranging for financing. ENVIRONMENTAL PROTECTION AGENCY RESTRICTS WATER DISCHARGE OF PCBs The Environmental Protection Agency on May 13 announced it will restrict the water discharge uf industrial effluents of polychlorinated biphenyls (PCBs) so that levels in waterways do not exceed -01 parts per billion. The action was taken following issuance of a Govern ment task force report which recommended that oil current uses of the chemicals, except use in electrical capacitors and transformers, be discontinued. According to the task force, current environmental levels do not constthi'" an imminent hazard to health, but effects of long-term exposure are largely unknown. Adverse health effects will not occur as a result of the levels of PCBs currently in the environment, (he report said. It noted that PCBs are highly persistent and can be found in almost all parts of the environment, and also mentioned that they have occurred in food as a result of accidental release, (n March, the Food and Drug Adminis tration proposed new regulations, including more stringent action levels for PCBs in food, steps to prevent them in food packaging, and measures to prevent contamination from accidents in food plants. The task force recommended passage of legislation giving the Federal Government broad authority to restrict use or distribution of PCBs, to control imports, and to collect information. The proposed Toxic Substances Con trol Act (S 1478) would fill this gap in the regulatory system, (he report said. The report, "PCBs and the Environment,'' is available for $6 from the National Technical Information Service, Springfield, Va. 22151. Copy>eht C 1972 by Tb* Bureau at National Affairs, Inc. HONS 068213