MAK.ING address P. O. DRAWER SZ1
COASTAL STATES PETROCHEMICAL COMPANY
RHONE TULIP 3-S211 CORPUS CHRISTI, TEXAS 78403
June 19, 1969
PLAINTIFF'S EXHIBIT CC-282
Roy Hunt, Inc. 349 McBride Lane Corpus Christi, Texas
78408
Dear Sirs:
Please prepare painting contract proposal for Petrochemical Job No. 17389-40421. This job includes painting the IC4 Unit Blowdown Drum, Electrical Switchgear House, a Table for Main Lab oratory, and the Stenciling of Equipment Numbers according to the enclosed Specifications and General Conditions of Inquiries. All proposals shall be delivered to Mr. B. A. Paulson, Plant Manager, no later than June 30, 1969. Contractor may visit the job site at 10:00 AM on June 25, 1969.
Very truly yours.
BAP:eh Attachments
1
B. A. Paulson, Plant Manager
CED0006590
MAILING ADDRESS P. O. DRAWER S21
COASTAL STATES PETROCHEMICAL COMPANY
PHONETUlip 3-5211 CORPUS CHRISTl, TEXAS 7B4CI3
June 19, 1969
Roy Hunt, Inc. 349 McBride Lane Corpus Christi, Texas
78408
Dear Sirs:
r
Please prepare painting contract proposal for Job No. 173934C>421 "Plant Air Equipment and Piping" according to enclosed Speci fications, Drawing No. D00633302, and General Conditions of Inquiries. All proposals shall be delivered to Mr. B. A. Paulson, Plant Manager, no later than June 30, 1969. Contractor may visit the job site at 10:00 AM on June 25, 1969.
Very truly yours.
B. A. Paulson, Plant Manager
BAP:eh Attachments
CED0006591
SPECIFICATIONS FOR PAINTING PLANT AIR EQUIPMENT AND PIPING
This specification is for the painting of plant air equipment, piping, and supports at Coastal States Petrochemical Company.
The enclosed set of General Conditions of Inquiries shall apply except that Petrochemical shall furnish all paint.
SURFACE PREPARATION
Surfaces where primer has failed and surfaces that have not been painted shall be prepared according to"Steel Structures Painting Council Surface Preparation, No. 2 Hand Tool Cleaning."
PAINTING
I. All steel surfaces, except machinery, that have not been primed and with operating temperatures below 200 F.
A. One coat of Briners #2810, 2-3 mils, D.F.T.
B. One coat of Briners #2809, 2-3 mils, D.F.T.
C. One coat of Briners #1311, 1 to 1% mils, D.F.T.
II. All steel machinery surfaces that have not been primed and with operating temperatures below 200 F.
A. One coat Briners #2810, 2-3 mils, D.F.T.
B. One coat Briners #2809, 2-3 mils, D.F.T.
C. One coat Briners #2807, 2-3 mils, D.F.T.
III. All steel surfaces with operating temperature fi'ora 200 F. up to 450 F.
A. One coat Briners #4195, 2% to 3% mils, D.F.T.
B. One coat Briners #2966, 1 to 1% mils, D.F.T.
All paint materials shall be applied according to Manufacturer's recommended specifications unless otherwise specified by Coastal States Petrochemical Company.
CED0006592
PAINT SPECIFICATIONS NO. 17389-40421 FOR MISCELLANEOUS EQUIPMENT
' This specification is for the painting of Coastal States Petrochemical's IC4 Uni't Blowdown Drum, Electrical Switchgear House, a Table for Main Labora.tory, and the Stenciling of Equipment Numbers on all equipment in operating units on South Side as per attached drawings. (Lettering and numbering to be
3".)
, The enclosed General Conditions of Inquiries shall apply except that Petrochemical shall furnish all paint.
SURFACE PREPARATION
Blowdown drum and table to be sandblasted according to "Steel Structures Painting Council Surface Preparation Specifications, Near White Blast
Cl ean, S. P.-10". Exterior surfaces of electrical switchgear house to
be washed with Sodium Meta-Silicate. (Ratio of 10 parts water to 1 lb.
Sodium Meta-Silicate.) All surfaces shall be free of contaminants.
Solvents, that will damage existing coating shall not be used. ;
*
PAINTING
i
1. Blowdown Drum
1st Prime
'
Briners 2810, 2-3 mils, D.F.T.
-
II. Table
. ~,
1st Prime
Briners 2810, 2-3 oils, D.F.T.
Vs*1*'II. III.
2nd Prime
Briners 2809, 2-3 mils, D.F.T.
Finish
Briners 6007, Iso-clad, 3-4 mils, D.F.T.
III. Electrical Switchgear House-
1
' Briners 2553, 4-5 mils, D.F.T.
IV.' Equipment Numbers
1
.
#2823 or 2581
All paint materials shall be applied according to manufacturer's recommended specifications unless otherwise specified by Coastal States Petrochemical.