PROGRESS REPORT ,
TECHNICAL SERVICES DEPARTMENT
ANNISTON, ALABAMA PLANT
JOB NO, 3?01J)6 .
REPORT NO. 1
DATE December 22, 1967
TITLE: OBJECTIVE:
SANTOWAXR QUATER/HIGH POLYPHENY! STUDY
To evaluate-'.'the effects of quater and higher polyphenyls in Aroclor
5460 productiono
.
PERSONNEL:
J* MacPherson, (TSD Supt.)
REPORTED BY: J. MacPherson
`
v
.
SUMMARY:
. `
Laboratory investigations have indicated that quater and higher polyphenyis adversely
affect Aroclor 5460 production; greatest among the effects are (1) yield losses as*
increased still residue.(Montar 5) and'(2) the possibility that the-chlorination cycle
is directly dependent upon the quater/poly phenyl content. A plant test to verify the
laboratory investigations has been proposed, the study will commence as aoon as
1. Organic Research approves a .Santowax OMP based 5460
2. A tentative process amendment to permit to permit the testing is approved
3. Production schedules permit
The study has an estimated cost improvement of $457,000 total for the years. 1969-1972.
FUTURE ACTION
'
.
1. Publish a schedule of events for the proposed study.
JMPsKd
J. MacPherson
a
Technical Services Department
ANNISTON
PCB-ARCH-EXT0377914
2 Anniston TSB Progress Report
370=736(1)
Background
With the startup of the new 'Santpwax still system,, some Aroclor 5460 production difficulties became obvious; as examples,, the solids still distillation cycle was fengSfaaedahd high.evolu|ign f-HCi was noted at the end of a still batch. Laboratory investigation * indicated that high quaterphenyl content in Santowax R was the culprit. The investigation also produced evidence that high polyphenyls ' 'would result in increased still residues'and promoted the idea that the chlorina tion cycle time could-b'directly affected by the polyphenyl content.
To check validity-.of the observation that SW-R- composition directly affects
quality and efficiency'a Quality"OperationsControl Program was.set up by W. B.
Dunlap' to correlate quality, -throughput, loss, and crude quality'with SW-R
'
; composition. (Tb .program went into effect in April. 1967. In August 1967, TSD began
to plan a stddy for a"plant test of th SW-1 composition effects. A cost-'improve
ment of $45/,000 has been estimated based on improved yields, reduced chlorina
tion cycle, improved ,S.T and higher Clg quality; this potential has been out
lined and is attached.
Plant Costs
An outline of the Santowax-R Quater-Higher polyphenyl study is attached. An item
not included in the outline in the number of runs at each design level of quater
phenyl content. Initially eight sets of runs are planned at each level, a set being
1 and 2 runs of the distillation sequence in the solids still or as many stifl
batches before Montar is withdrawn from the still. A key^event is Organic Research
approved of OMP based 5460, no OMP or QMP/SW-R runs will be attempted without this.
.
r'' '
Results
1. The .Quality Operations Control Program has shown that the quaterphenyl
content of the SW-R varies between 13.3% to 15.9%. A selected grouping
of set's, five in number"and'.sampled, between 9/9/67 and 10/4/67, gav.e .
an average of 14.6%; this may be a representative figure for the average
quaterphenyl content.
'
Conclusions
1. None to date.
'
:
'
Future Work
.
The following will be worked on immediately;
1, Tentative Process Amendment B written to cover OMP based 5460,
2. Complete the evaluation of OMP based 5460, Organic Research has
submitted sample material to United Resins for further product
evaluation.
'
PCB-ARCH-EXT0377915
Anniston TSD Progress Report 370=736(1)
- 3 -
The following will be done as soon as possibles
3. Install (a) LI No. 4 still receiver and (b) FI No. 4 still circulating line. These items are necessary for plane tests with M3P and 0MP/SW=R mixtures.
4. Operating instructions-^for plant tests will be written after manufacturing approves TSD program.
5. Develop the schedule of events for"the plant tests.
References
1. Anniston Pl&D report No. 1 (370=500) = 2/13/67
2. Anniston PR&B report No. 2 (370=500) = 4/20/67 ' ;
3. MemOj W. . Dunlap to . 1. Haupt 4/14/67