Document 4QQ7KRn21G1R23xgJ18wQM7ba
NorthWestern
1:_,TICruV
Delivering a Bright Future
Figure 1: WECC: Paths and Total Transfer Capability (TTC in N1W)
Path 83 MATL
1-230 k'/ !ne
300 MW
Path 8
2 200 Mw
Montana-Northwest
2.500 kV ires 5.23G k'/ !gyres 3.115 k`i Pres
300 MW
.1, / 1350MW SPA
worm or OAPAsedp
CAkrrp
Gi,d,o. SUSRASA.
el, 00O.10.
1...argxen
COM..0 %Al
-$ 20fiNi.
To Meturst
IPA GR Agerti
Coe* rip l it dew: SCn
je-OISI',IS Tr A...S.W.i0A
sa>0 AV tire
S00 W tire
256 MW
00 Ay SAS
600 MW
.1 I
VVAPAIVhles City DC Tie
150 mw
383 Ply/
Path 18 Montana-Idaho
1-230 kV ' ne 1.1e1 kV
600 MW
Path 80
Montana-Southeast
1-23G ;V 1-181 kV
As can be seen, the largest single path to the Pacific Northwest and other Western
Interconnection markets is Path 8, which consists of the interconnections with BPA and
Avista. As thc figure indicates, Path 8 is made up of
lines and has a
significantly higher TTC than the other paths.
I lowever, there is very little Available Transmission Capacity ("ATC"), which is the difference between the TTC and the amount of capacity already reserved by existing transmission commitments, that could be used to import additional electricity to NorthWestern's system via Path 8 for the foreseeable future. In short, Path 8 is a significant and convenient interstate transmission path, but its capacity has already largely been reserved.
Path 80, located in the southeastern portion of Montana, theoretically has more ATC. I lowever, it is a very complex path that experiences significant congestion and curtailments due to reliability issues. Path 80 is greatly impacted by what is going on in other transmission owners' transmission systems outside of Montana. Path 80 is affected by loads and generation in Wyoming, Colorado, and Utah as well as other potential impacts. Moreover, Path 80 is far from thc Pacific Northwest market, causing greater potential congestion if it is used to import power from that arca. As one example of the problems with Path 80, during the significant cold weather of February 2021, there were curtailments of transmission on Path 80 at the worst possible time. Path 80 very commonly has non-firm transmission curtailed (and sometimes even firm transmission) as a result of congestion on the transmission system in Wyoming and further south. This