Document 4LO3BMZR89bgJj7Nb809Baga

, __ CertainTeed U3 D? July 26, 1979 Subject Air Sample Survey - St. Louis Plant To Location and mail code John McGirij-ey V.F., P&PG, 2B -- ;_________ Location and mail code Janis Woodson/ejb 1125/4 cc: J. Nixon, St. Louis Plant, #259 0. Kittilstad, Valley Forge, #4 PLAINTIFF'S EXHIBIT CT-498 On July 16th and 17th an Asbestos Air Sample Survey was made at the CertainTeed Asbestos-Cement Pipe Plant- il259, located in St. Louis, Missouri. This survey was made in order to determine the exposure of employees still working at the plant, after all the manufacturing operations have ceased (shutdown was effective May 11, 1979). A total of 12 Air Samples were taken in 9 different areas of the plant. The remaining operations at the time of this survey included: Shipping pipe in stock - (utilized 4 hourly employees): R. Metz' V. Wolff ` G. Kelley V. Denen . Loading railcars with Asbestos fiber from warehouse - (2 railcars per week utilizing 2 hourly employees): E. Birkemeier W. Harper. Maintenance employees dismantling equipment for transfer to other CertainTeed locations - (utilized 2 hourly employees): A. Schroader L. Moran^ Office and Supervisory Functions - (utilizing 5 salaried employees): J. Nixon A. Wiese M. McCauley J. Harris W. Tucker Guard Service - 24 Hour Service: Provided by R.A.P.P. Security Service 01-25-0005 CTD017568 Air Sample Survey July 16 & 17, 1979 < .a*-'- SAMPLE SAMPLE Whiteroom: Manufacturing Dept., (Fiber Dump) Pump sitting on desk in Whiteroom approx. 4' from floor and approx.10'from bucket ele-- vator SL1 SL10 Mixer Area: Manufacturing Dept., Second Floor, Pump sitting on platform of //2 mixer approx. 6' from floor. SL2 SL12 Shipping Yard: Pump sitting on pallet of pipe approx. 3' from ground outside North end of Building 9. (Finishing Department). SL4 SL6 Wetting Screw: Manufacturing Dept., Pump sitting on feed chute of pipe machine approx. 3' feet above wetting screw and approx. 7' from floor. SL5 SAMPLE TIMES FLOW RATE RESULTS (minutes) (liters/Minutes) (fibers/cc) 230 mins. 2.21 1pm .030 F/cc 155 mins. 2.21 1pm .014 F/cc (TWA .024 F/cc) 230 mins. 155 mins. 210 mins. 170 mins. 2.0 1pm 2.0 1pm 2.0 1pm 2.0 1pm .025 F/cc , .007 F/cc , , (TWA .018 F/cc) .029 F/cc .015 F/cc (TWA .023 F/cc) 220 mins. 1.92 1pm .039 F/cc Waste Pile: Outside plant; pump sitting on top of 30' waster pile hanging on pipe one time used for pumping material on the hill.pump approx. 4' above ground. SL3 Lathe Line //2: Finishing Dept., Pump sitting on lathe approx. 4' from floor. SL8 Fiber Warehouse: Plant 3 Pump located by main isle hanging from pole approx. 6%' from floor. 20' from pallets of P-5 fiber in shrink wrap. SL11 375 mins. 470 mins. 410 mins. Main Gate: Near Guard House Pump hanging on fence at Main Entrance to plant property approx. 5' from ground. SL13 Office: This sample voided because of pump problems SL7 420 mins. 2.18 1pm .035 F/cc 2.18 1pm .005 F/cc 2.21 1pm 2.01 1pm .002 F/cc V ,,. .002 F/cc CTDO17569 ^ir Sample Survey - St. Louis, July 16 & 17, 1979 July 26, 1979 Page 3. 1. Weather conditions during time of sampling (July 16.& 17) was very humid and warm - approximately 85-90. Slight breeze at times notably to the west. 2. All samples taken and analyzed following the NIOSH recommended procedures for "Sampling and Evaluating Airborne Asbestos Dust". 3. Asbestos Regulations as set by OSHA - requires that an employee's exposure to asbestos shall not exceed 2.0 fibers, longer than 5 micrometers, per cubic centimeter of air in an 8 hour time weighted average (TWA). T CTD017570