Document 4JpYyzLq1jaw6j35Mn0vONeVp

ABD00279847 COMPLIANCE PLAN CAPITAL ITEMS REACTOR VALVE LIMIT SWITCH REPLACEMENT ABERDEEN CHEMICAL PLANT September 9, 1985 A WORK BY: vv'^-- . Frank G. Jeanson Process Engineer REVIEWED AND APPROVED BY: Veldon E. Messick Chief Process Engineer ABD00279848 COMPLIANCE PLAN CAPITAL ITEMS REACTOR VALVE LIMIT SWITCH REPLACEMENT ABERDEEN CHEMICAL PLANT TABLE OF CONTENTS I.PURPOSE AND PROCESS DESCRIPTION II. INSTRUMENT SPECIFICATIONS III. DRAWINGS A ABD00279849 COMPLIANCE PLAN CAPITAL ITEMS REACTOR VALVE LIMIT SWITCH REPLACEMENT ABERDEEN CHEMICAL PLANT I. Purpose and Process Description The purpose of this design is to provide the valves on the reactors with accurate indication in the control room of the valve position. The existing limit switches do not provide this accuracy, since they are operated by the position of the actuator and not the actual valve stem. This type of operation does not take into account the possibility of shearing between the valve stem and actuator, which has occurred here in the plant. This poses a potentially hazardous situation for a VCM release. This design will provide each of the designated valves on the reactors with a new limit switch that operates on the position of the valve stem. These new limit switches will provide accurate indication in the control room and eliminate the hazard of a valve being open when it's actuator position is showing closed. A total of 70 valves will be equipped with this new type of limit switch. These limit switches will be mounted on the bracket between the valve and the actuator. Drawings of several different types of valves with the new limit switches are attached. Table I lists the valve location and manufacturer. Table II lists the different types of valves, quantity of each and actuator type. ABD00279850 Reactor 745 + 700 600 + 500 600 500 400 300 TABLE I Valve Location Size Chem Wash Rtrn. Hot H^O Charge Sewer Dump 6" 6" 6" 6" Evacuation Recovery Vent 8" 6" 4" Chem Wash Rtrn. 6" Hot ^0 Charge 6" Sewer 6" Dump 6" Evacuation Recovery Vent 6" 6" 3" Vent 3" Chem Wash Rtrn. 6" Hot HjO Charge 6" Sewer 6" Dump 6" Evacuation Recovery Vent 6" 6" 3" Chem Wash Return Hot H2O Charge 6" Sewer 6" Dump 6" 6" Manufacturer Jamesbury (Ball) TuFline (Plug) 150 Jamesbury (Ball) Jamesbury (Ball) TuFline (Plug) 150 TuFline (Plug) 150 TuFline (Plug) 300 KTM E0106 (Ball) TuFline (Plug) 150 TuFline (Plug) 150 WKM 6FBI 12 (Ball) TuFline (Plug) 150 TuFline (Plug) 150 WKM (Ball) 3RB100 TuFline (Plug) 300 WKM (Ball) 6FB123 Module 310C TuFline (Plug) 150 Durco (Plug) 6411 WKM (Ball) 310 TuFline (Plug) 150 TuFline (Plug) 150 WKM (Ball) 3RB100 310C KTM (Ball) E0106 TuFline (Plug) 150 TuFline (Plug) 150 WKM (Ball) 6FBI12 310 B ABD00279851 Reactor 744 743 742 +741 Valve Location Evacuation Recovery Vent Size 6" 6" 3" Manufacturer TuFline (Plug) 150 TuFline (Plug) 150 TuFline (Plug) 300 Chem Wash Rtm. Hot ^0 Charge Sewer Dump 6" 6" 6" 6" Evacuation Recovery Vent 6" 6" 3" WKM (Ball) 6F-B130 310B WKM (Ball) 6X4-B102 WKM (Ball) 6X4-B102 WKM (Ball) 6F-B112 310B TuFilne (Plug) 150 TuFline (Plug) 150 WKM (Ball) 3KB150 ABD00279852 A V ABD00279853 COMPLIANCE PLAN CAPITAL ITEMS REACTOR VALVE LIMIT SWITCH REPLACEMENT ABERDEEN CHEMICAL PLANT III. Instrument Specification Item PLS-101 through 170 Description Promimity Limit Switches