Permit Number: EPR/BU5453IY Operator: AGC Chemicals Europe Limited Facility: AGC Chemicals Europe, Hillhouse
Form Number: n/a
A14 - Thermal Treatment Plant Summary for the period from ...January 2024... to ...March 2024...
Month January 2024
Number of Reportable Days
(Waste onto the Thermal Treatment Plant for more
than 21.5 hours)
Number of Exceedances of the Permit Limits, during reportable days
25
0
Number of NonReportable Days (Waste onto the Thermal Treatment Plant for less than 21.5 hours)
Number of Exceedances of the Permit Limits, during nonreportable days when waste into the Thermal Treatment
Plant
6
0
February 2024 1
0
28
0
March 2024
24
1
7
0
During Q1 the Thermal Oxidiser was predominantly online with liquid and gaseous waste stream from the Waste Acid Stack (WAS) the Low Boiler Stack (LBS) gaseous waste stream was reintroduced from mid March. From the 27/01/24 to 01/03/24 the Thermal Oxidiser was offline for planned maintenance with only one reportable day during this period.
There was one exceedance for dust (1/2 hour average and daily average) on 12/03/2024 which was reported to the Environment Agency on 18/04/2024.
Signed*: Date: 18/04/2024 (*authorised to sign as representative of AGC Chemicals Europe Limited)