Operation Report
Dept. 246 - Aroclor August - 1964
PRODUCTION SUMMARY Scheduled Actual -
$ of Schedule -
1,757,000# 1,789,807#
102$
AVAILABILITIES
Repair - 1.6l$
Process - 0
Other - 7.93$
Total - 9.54$
YIELDS
Standard
Actual
Y.T.D.
$ Theory on Biphenyl -
95.55$
95.27$
97.32$
SIGNIFICANT ITEMS THIS MONTH
*
Expansion work in the chlorinator area was completed with a minimum of lost production and is working satisfactorily. Changes have included installation of air cooled heat exchangers, larger pumps & circulating system and chlorine control instrumentation. Remaining work Includes installation of larger pumps and coils on the stills and installation of 3 new storage tanks by mid-October. A problem with entrainment or vaporization in HC1 off-gas has caused muriatic acid quality problems. Control of this problem has restricted rates. A chlorinator basket of new design was installed in #2 chlorinator that will force more flow through the iron catalyst.
PRODUCT -
Aroclors 1st of Mo.
Last of Mo.
Whse. Stock -
663,095#
Dept. Stock -
397,096#
, , #Total -
1 060 131
581,110#
607,504# 1,188"; 614#
ghw
E. E. Martin