Document 4JO3DMoZgxQBvqM3J44r93D61

Building Construction and Maintenance TABLE 17-A FORCE OF WIND FOR GIVEN VELOCITIES Mtles per hour (V) 1 2 3 4 5 10 15 20 25 30 35 40 45 50 60 70 80 100 Feet per minute 88 176 264 352 440 880 1,320 1,760 2,200 2,640 3,080 3,520 3,960 4,400 5,280 6,160 7,040 8,800 Feet per second 1 47 293 440 5 87 733 14 67 220 26 6 293 440 513 586 66 0 73 3 880 102 7 1173 146 6 From Kidder-Parker Architects and Builders Handbook Force in pounds per square foot (0 004V1) 0 004 0 014) 0 036j 0 064) 01 j 04 ) 09 J 16 25 36 49 64 ) 81 J 100 14 4 ) 19 6 J 25 6 ) 40 0 J Description Hardly perceptible Just perceptible Gentle breeze Pleasant breeze Brisk gale High wind Very high wind Storm Great storm Hurncane Table 17-A can be used to check bracing that will resist pressures developed by wind at different velocities The graph shown in Fig 17-4 shows wind velocities that can be withstood by concrete block walls of varying heights Temporary flooring. A temporary plank floor (decking) should be provided not less than two tiers below the tier of beams on which bolting, riveting, welding, or painting is being done and at every other floor level where the permanent floor filling or the floor filling forms haye not been provided This flooring should cover the entire tier of beams except for open ings required for access and for hoisting pur poses These openings should be protected with railings or suitable temporary covers Planks of temporary floors should be not less than 2 by 10 in (cross dimension, pre ferably rough) for a span up to and including 10 ft, and 3 in thick for spans up to 16 ft Planks should be fairly straight grained and be free of senous defects, such as large knots. rot, and the like Planks should be laid closely together, supported on a solid bearing, and securely fastened to the framework of the structure In buildings having wood floor construc tion, rough flooring should be laid on the wood joists as the structure progresses, and the floor immediately below the point where any work is being performed should be en tirely Boored-over except for necessary open ings Flooring for this purpose should be not less than 7/s-in thick General safe practices Suggested pre cautions that should be followed wherever practicable in steel erection work are 1 Require proper protective equipment to be used, including safety hats 2 Do not permit employees to nde loads, hooks, or "headache" balls 3 Do not permit men to work underneath electric wires unless the wires are fully insulated or first disconnected 432