Document 4J9gxGMrnMN2B5GxwZYDjJRQa
Monsanto
MONSANTO INDUSTRIAL CHEMICALS CO. Sauat. Illinois 82201 Phono: (6t0) 271-5035
December 31, 197U
Mr. Clifford H. Tuttle Aerovox Industries, Inc. 71*0 Belleville Avenue Nev Bedford. Mass. 027*tl
Dear Mr. Tuttle:
Re: "AD HOC PCB Committee"
Tabulated below are the PCB analyses of various samples taken on 12/U and 1S/5/T1*
All PCB concentrations are expressed In micrograms per liter. Same as
parts per billion (ppb).
PCB1 s
1. Composite sample taken 12/U & 12/5/7U
197 ppb
(Sample at main plant effluent taken from moat
discharge at north Bide of building. Rough flow
measured at U30 GPM, but could be less. Composite
obtained over IS hr. sampling period.)
II. Grab sample taken 12/5/7U (Main plant effluent from same spot as I above. Sample in AM when composite sampler was removed.)
55-3 ppb
III. Grab sample taken 12/5/7** . (At pumphouse in parking lot.
to Mew Bedford sewer system.)
Possible flow
5 ppb
IV. Plant water taken 12/5/7*1 (Grab sample taken from drinking fountain.)
2.5 ppb
V. Estuary taken I2/5/7U (Grab sample taken along shore line just south of main plant effluent discharge from north moat.)
26 ppb -
VI. Estuary taken 12/5/7*1 (Grab sample taken along shore line below parking lot.)
18 ppb
The above information, plus flow data from your plant, should permit you to complete the EIA questlonaires. Norm Butterworth is familiar with how and
i, ol M
Company
MGNS 093563
Page 2 Mr. Clifford H. Tuttle
where samples /ere taken. Call me (6l8) 271-5835 if you have any questions.
Very truly yours,
EES:or
Edward E. Stewart
MONS 093564