DRAFT OF CONTRACTOR SAFETY PROCEDURES FOR EXCAVATION OF CONTAM. SOIL
__ ^ (U*a
c&r*****""
, / HOECHST CELANESE CORPORATION
izJtf /VVdL a- Cww~<-
TECHNICAL CENTER
^jiM^Tc^Pus Christ!, Texas
From: To:
R. A. OPERSTENY DISTRIBUTION
RAO-252-90 December 14,1990
Subj: Draft of Contractor Safety Procedures for Excavations of Possible Contaminated Soil
Attached is a modified draft of procedures that were used for the de-watering of HCTC's surface impoundments (ponds) last year. An early version had been generated by Jones and Neuse, our current environmental consultant, for specific cases involving EPA classified hazardous waste.
I have adapted these procedures to allow general use for modifications in our pilot plant areas where contaminated soil has been found. Footing excavation for the Mid-Scale Process Units/Pharmaceutical Intermediates, for example, will require closure procedures as described in the Pilot Plant Area Closure Plan, which calls for appropriate safety procedures, in addition to a 30-day advanced notice to the Texas^Water Commission-. Mundy, our on-site contractor is currently reviewing their capabilities and training for this work
* sQ&S Other situations, where prior sampling has indicated waste or soil to cabe non-hazardous, may allow less extensive actions for handling and disposal, and should be reviewed by the ESHA department. Please review the attached and return comments to me or Andy Savage.
Distribution:
Arnold, D. D.
Atkins, B. Butts, S. K. Cooper, C. E. Hartman, L. W. Helmer, W. Kenesson, T. M . Mancias, J. B.
Mather, R. W. Muniz, T. Nunn, D. C. Pasquino, R. Poole, B. R. Pulse, C. H. Rhyne, M.
cc: Martinson, M. (Bridgewater-Legal) Nativi, R. (Stubbs-Overbeck and Associates)
Roberts, K. A. Savage, A. Starr, D. Steele, B. Vaughn, G. J. Ward, J. L. Wells, P. M.
009022
. fUjAX .
fill Oar Cr
y
-7H($ ` -
S'
,
. hncrl or
-2-)
sj pqocfei'/zeiJ
A Sfft.OsC Pfr
'/ / hJ rc
Pi**>
Sj
&