Document 44a0rjp1oeO0mLK2vpYZa85aN

American Societv of Heating and Ventilating Engineers Guide, 1926-27 the pipe or fittings by a constriction, since the velocity at any one con striction will limit the whole system. For this reason, particular care must be taken to ream such pipe and guard against dope constricting it at joints. Iron pipe should also be examined for constricting blisters, Fig. 22 and Table 46, from the Laboratory reports already mentioned show the importance of these factors. Table 46 shows variation in capacity of a pipe as affected by variation of size and smoothness of pipe generally found on the market. The maximum and minimum results were obtained by picking out very smooth and very rough pipe from the stock room.of a large manufacturer. Table 44. Maximum Capacity of Steam Lines at Various Pitches Pitch of Pipe in Inches per 10 Ft. Pitch op Pipe--# in. H IN. 1 IN. 1M IN. 2 IN. 3 IN. 4 IN. 5 IN. Pipe Size. Sq. Ft Rad. Based on 240 B.t.u. i M s Sq. Ft Rad. Based on 240 B.t.u. iff 5 Sq. Ft Rad. Based on 240 B.tu. Max.Vel. Max.Vel. Sq. Ft Rad. Based on 240 B.tu. Sq. Ft. Sq. Ft Sq. Ft Sq. Ft Rad. Based on 240 B.tu. > aa Rad. Based on 240 B.tu. > K a* Rad. Based on 240 B.tu. iff 3 Rad. Based > on 240 B.tu. .3 w w 2" 25.0 12 30.3 14 37.3 18 40.4 19 42.5 20 46.1 21 *47.5 22 49.3 23 45.8 12 52.6 15 63.0 17 70.0 20 75.2 22 83.0 23 87.9 25 90.2 26 104.9 18 117.2 20 133.0 23 144.5 25 154.0 27 165.0 28 172.6 29 178.2 31 142.6 18 159.0 21 181.0 23 196.5 25 209.3 27 224.0 28 234.8 30 242.6 31 236.0 19 263.5 20 299.5 23 325.5 25 346.5 27 371.5 28 388.4 29 401.1 30 Table 45. Results of Tests on Angle and Globe Valves Nominal Size of Pipe In. X l IX Area of Pipe Sq. in. 0.537 0.835 1.459 1.927 Area Valve Seat Opening Sq. In. Per Cent of Area of Pipe 0.4418 0.822 1.258 1.773 . 82.2 98.4 86.2 92.2 Maximum Pipe and Valve 9.68 22.10 30.00 46.13 Capacity Pipe Alone Per Cent of Capacity of Pipe Alone 13.52 23.30 47.5 68.5 71.6 95.0 63.1 67.4 Nominal Size In. X i mix Valve Stem --Vertical Capacity of Pipe and Valve Lb. per Hr. 1.38 7.73 13.20 18.81 Per Cent of Capacity of Pipe Alone 11.8 35.7 31.2 33.0 Valve Stem---Horizontal Capacity of Pipe and Valve Lb. per Hr. 8.83 14.06 22.88 32.00 Per Cent of Capacity of Pipe Alone 76.3 66.1 . 54.3 56.7 Table 46. Per Cent Difference in Capacity Due to Variation of Pipe Size and Smoothness Maximum Condensation, Lb. per Hr. Capacity of Pipe..................................... Maximum................................................. X" 14.00 15.20 8.6 1" 24.89 30.08 20.8 IX' 45.42 52.08 14.7 IX' 70.50 82.00 16.3 American Society of Heating and Ventilating Engineers Guide, 1926-27 Note --Allowance for expansion must be made in long runs of mains both vertical and torixontal. One expansion joint or swing should be installed in any run over 100 ft. 0 in. long and one foreach additional 100 ft. 0 in. of run. All branch connections should be made so as to allow a swing both at Fig. 237 Typical Expansion Connections for Risers 69 %/