American Societv of Heating and Ventilating Engineers Guide, 1926-27
the pipe or fittings by a constriction, since the velocity at any one con striction will limit the whole system. For this reason, particular care must be taken to ream such pipe and guard against dope constricting it at joints. Iron pipe should also be examined for constricting blisters, Fig. 22 and Table 46, from the Laboratory reports already mentioned show the importance of these factors.
Table 46 shows variation in capacity of a pipe as affected by variation of size and smoothness of pipe generally found on the market. The maximum and minimum results were obtained by picking out very smooth and very rough pipe from the stock room.of a large manufacturer.
Table 44. Maximum Capacity of Steam Lines at Various Pitches Pitch of Pipe in Inches per 10 Ft.
Pitch op Pipe--# in.
H IN.
1 IN.
1M IN.
2 IN.
3 IN.
4 IN.
5 IN.
Pipe Size.
Sq. Ft Rad. Based
on 240 B.t.u.
i M
s
Sq. Ft Rad. Based on 240 B.t.u.
iff
5
Sq. Ft Rad. Based
on 240 B.tu.
Max.Vel. Max.Vel.
Sq. Ft Rad.
Based
on 240 B.tu.
Sq. Ft.
Sq. Ft
Sq. Ft
Sq. Ft
Rad. Based
on 240 B.tu.
>
aa
Rad. Based
on 240 B.tu.
> K
a*
Rad.
Based on 240 B.tu.
iff
3
Rad. Based
>
on 240 B.tu.
.3
w w
2"
25.0 12 30.3 14 37.3 18 40.4 19 42.5 20 46.1 21 *47.5 22 49.3 23 45.8 12 52.6 15 63.0 17 70.0 20 75.2 22 83.0 23 87.9 25 90.2 26 104.9 18 117.2 20 133.0 23 144.5 25 154.0 27 165.0 28 172.6 29 178.2 31 142.6 18 159.0 21 181.0 23 196.5 25 209.3 27 224.0 28 234.8 30 242.6 31 236.0 19 263.5 20 299.5 23 325.5 25 346.5 27 371.5 28 388.4 29 401.1 30
Table 45. Results of Tests on Angle and Globe Valves
Nominal Size of
Pipe In.
X
l
IX
Area of Pipe Sq. in.
0.537 0.835 1.459 1.927
Area Valve Seat
Opening Sq. In.
Per Cent of
Area of Pipe
0.4418 0.822
1.258
1.773 .
82.2 98.4
86.2 92.2
Maximum Pipe
and Valve
9.68 22.10 30.00 46.13
Capacity Pipe Alone
Per Cent of Capacity
of
Pipe Alone
13.52 23.30 47.5 68.5
71.6 95.0 63.1 67.4
Nominal Size In.
X
i
mix
Valve Stem --Vertical
Capacity of Pipe and Valve
Lb. per Hr.
1.38 7.73 13.20 18.81
Per Cent of Capacity
of Pipe Alone
11.8 35.7 31.2 33.0
Valve Stem---Horizontal
Capacity of Pipe and Valve
Lb. per Hr.
8.83 14.06 22.88 32.00
Per Cent of Capacity
of Pipe Alone
76.3 66.1 . 54.3 56.7
Table 46. Per Cent Difference in Capacity Due to Variation of Pipe Size and Smoothness
Maximum Condensation, Lb. per Hr.
Capacity of Pipe..................................... Maximum.................................................
X"
14.00 15.20
8.6
1"
24.89 30.08
20.8
IX'
45.42 52.08
14.7
IX'
70.50 82.00
16.3
American Society of Heating and Ventilating Engineers Guide, 1926-27
Note --Allowance for expansion must be made in long runs of mains both vertical and torixontal. One expansion joint or swing should be installed in any run over 100 ft. 0 in. long and one foreach additional 100 ft. 0 in. of run. All branch connections should be made so as to allow a swing both at
Fig. 237 Typical Expansion Connections for Risers 69
%/