Document 44Y01kJdbZrgn0VK0nXapqEja

COMPANY CONFIDENTIAL OTHER LOCATIONS C. P. Buckley - WGK H, M. Galloway - Nitro C, G. Hoffman - Delaware R. J. L. Solarl - JPQ E. S. Tticker - So. 2nd SC. GENERAL OFFICES M. E. Bata P. B. Hodge* D. B. Hostner W, A. Kuhn R. J. Stratmeyer ANNISTON J. N. C. K. L. L. R. A. V. R. L. C. J. C. A. G. G. U. Carpenter Eaatmen Faulkner Haydel HaupC Lehman Landwehr McCarty Miller W.B. Pepageori B.O. Severeon W.F. Taffea H.L. Williams PROGRESS REPORT TECHNICAL SERVICES DEPARTMENT ANNISTON. ALABAMA PLANT JOB NO. 570:740 REPORT NO. 2 OATI 7/25/69 TITLE: OBJECTIVE! Aroclor and HC1 Department Waate Audita To identify the aources of waate in the Aroclor and KCl Department# and to quantify these loaaee. PERSONNEL) E. G. Wright (W. F. Taffee) REPORTED BY: E. G. Wright SUMMARY) Tha major source* of organic (primarily Aroclora but with smaller amounts of Biphenyl, Santowax and HB-40) and acid waste in the Aroclor and HC1 departments have bean Identified and quantified. The average total losses of organic material from theaa departments la approximately 27|/day. The new warehouse drumming and flaking area accounts for almost half of tha organic losaaa with an average daily loaa of U#/day. Tha remainder of these organic losaaa cornea from the Aroclor still room aawar (2#/day), tha chlorlnator aawar (Sjjl/day) and the HC1 department (6#/d*y). The acid loaaaa from that* departments cane from two aources. Tha chlorlnator aawar and tha HC1 department aawar. Tha chlorlnator aawar showed an average lose of l,100#HCl/day and the HC1 department loaaaa were an aver age of 15,500|jl/dsy. To provide facta on tha effects of P.C.B. in plant effluent water, Snow's Creak and Choccolocco Creak ware investigated, Snow's Creek was checked visually for two phase ayatama (l.e. Aroclor and water). Nona was noted more than one block from the plant boundaries. Six templet of mud and water ware collected downstream from tha plant (see attached map for locations of sampling points). These eamplee are now being analysed by organic research. Tha results of these samples will be communicated ea soon as they are received. animbton MONS 057607 Anniston Plant Progreaa Report #370:740 (2) Company Confidential Page 2 FUTURE WORK 1. Continue to monitor organic losses periodically on the total plant outflow, 2. A decision will be made on continuing to sample on Choccolocco end Snow's Creek as soon as the reaults from the first set of samples are received. 3. Collect one set of fish samples from Choccolocco Creek and have these analysed for P.C.E. levels, 4. Continue to look for a better method to collect samples from two phase (l.e, Aroclor end Water) systems. 5. Conduct s correlation study between the organic research method for P.C.B. end the Anniston method for total organics. Technical Services Department HONS 057608 Anniston Plant Progress tsport ^70:740 (2) Company Confidential Page 3 DETAILS 1. Sampling and Analysis All samples taken during this audit vers 24 hour composite samples with the exception of the "grab" samples taken from Snow's and Ctioccolocco Creeks. Two very definite two phase systems were noted during this audit. These were located in the warehouse sever and In Snow's Creek about one block below the plant outfall. Sampling this two phase system has proven to be very difficult. We tried two methods. The first method was the slow peristaltic (Randolph type) pump. We then tried a high speed peristaltic pump. Both of these were unsatis factory, We are presently trying to trap the Aroclor phase in a sump located at the corner of the warehouse. This sump la being measured everyday and should provide a much better estimate of the volume of the second phase than we now have. The samples which wars collected in the plant were analysed for total organics by a method which was developed by the Anniston plant labora tory. The six seta of samples which were collected in Snow's and Choccolocco Creeks will be analysed specifically for P.C.B. by Organic Research. There were two reasons for doing thaae analyaaa differently. The first reason was that the laboratory at Anniston did not have the proper faci lities such as a "clean room" and also that they did not have the correct type of election capture detector which was specific for P.C.B. To pur chase this detector and provide "clean room" (Aroclor free) working apace would have cost approximately $16>000. The second reason was the time element involved. The P.C.B. method in the P.P.B. range required approxi mately 2-3 hours per sample. It was fait that running total organics on the in-plant samples would be sufficient for determining exactly where the losses wars originating. 2. Plow Measurements The flow from the KCl department wee meeeured by the Lithium chloride dilution method. This flow was verified by actual physical measurement. The flows from the Aroclor still room end the warehouse were determined by physical measurement. These flows were measured twice during the time which the waste audit was being conducted. HC1 Department Audit The HC1 department receives anhydrous HC1 from the chlorlnators in the Aroclor department. This gea passes through a falling film type absorber where it is absorbed In water to form Muriatic Acid. The HC1 gea stream during tha past has contained entrained organics which have caused problems in the production of Water White,organic free Muriatic Acid. During 1968 approximately one-third of the production was sewered in an attempt to solve this organics problem. Thle amounted to approximately 3O M #/day of HC1. In mld-1969 a catcfi tank and a membrane type coalescer were installed to trap out and remove these organics. These two units are operating satis factorily and the plant is now producing Water White Muriatic Acid. The HONS 057609 Anniston Plant Prograss Report #}70:740 (2) Company Confidential Page 4 HC1 Department Audit (Cont'd) organic material ia composed of Biphenyl, Santowex and the lower chlori nated Biphenyls. This material la presently being drummed out and sent to the toxic dump. Sample Data These samples were collected for a period of 26 days. They were analyzed for pH, 7. HC1 end organics. Listed below are the dally high and low and an average value for the 26 day period. A complete list of all of the date U on the attached data sheets. Ths ampling point la noted on the attached proceaa sewer map. Dellv High HCj. ttSSL 51,200 # Orgalnce #/dev 24 # Daily Low 1,200 # Average 15,500 # Average Flow *> 100 G.P.M. 1 # 6.0 # Warehouse Audit This sewer collects the wastes from the Aroclor drumming and flaking area in the new warehouse. It was found to be the largest singular contributor of organics to the sewer with an average dally loss of approximately 11.0 #/day of dissolved organics. The 2nd (organic) phase of this sewer Is presently being trapped In a sump located at the north-east corner of the warehouse. During a one week period we collected approximately 2.5 gallons of organics or 27# for the 7 day period. Thie average 3.8 #/day plus the 11 #/day of dissolved material brlnge the total from thie source to 14.8 #/day. We will continue to monitor this sump to gather long term date. These organics came from two major sources. These ere the wet scrubber which wee installed to scrub the vents from the Biphenyl end Aroclor flakere. The organic materiel end water le drained from the scrubber once per day. It la drained by drop ping the materiel into e drum end allowing the aqueous layer to overflow to the sewer. The other major sources are leaks and spills which are washed directly to the sewer when the floor fes steam cleaned in the warehouse. Semple Pets These samples were collected for e period of 28 days. They were analyzed for pH, X HC1, end organics. When it wee found that the samples were neutral, pH end X HC1 wee discontinued. Listed below ere the dally high end low values and an average dally value for the sampling period. A complete Hit of the date la on the attached date sheets. The sample point la notad on tha attached process sewer map. HONS 051>10 Anniston Plant Progress Report #570:790 (2) Company Confidential Page 5 Sample Data (Cont'd) mil Organics #/dsy 65# Organic Pnd Phase #/dav Low 2.2# Average 11.0# 5.8# Average Flow 90 C.P.M. Chlorlnator Sewer This sever catches the cooling water from the chlorlnator and also the water from the drowning jets on the vents of the crude Aroclor blowing tanks. The major source of organics In this sewer are pump leaks from the circulating pumps on the chlorlnators. The primary sources of HC1 are the drowning jeta on the blowing tanka. Sample Data These samples were collected foT only 1} days because repairs were being made on this sewer when the audits were begun in the other parts of the Aroclor department. They were analysed for pH, % HC1 and organic#. Dally high* and lows and a dally average are listed below. A complete list of all data Is shown on the attached data sheet. The sampling point Is noted on the attached process sawar map. Organlca #/dav HC1 #/dav M&b Low 52.8 # 3-5 # 5,000 # 500 # Averags Daily Average Plow - 250 G.P.H. 8# 1,100 # Aroclor Still Room Sewer This sewer receives ill of the water used on the Jets on the Aroclor stills. These samples were also analysed for pH, 7. HC1 and organlca, The pH and HC1 were discontinued when there waa no HC1 detected in a number of samples. Semple Data These samples were collected for a period of 14 days. The average dally organlca loss from this sewer was only 2 #/day. Listed below sre the dally highs and lows as well as the average daily lota for the sampling period. A complete list of the date la located on the attached data sheet. The sampling point la noted on the attached process sewer map. 0NS 057611 Anniston Plant Progress Report#}70:740 (2) Sample Data (Cont'd) Organics #/day High 8.9 # Company Confidential Page 6 Low Average Dally Average Flow = 65 G.P.M. Choccolocco and Snow'a Creek Due to the recent developments concerning P.C.B. in water and its effects upon wildlife, we decided to begin sampling the streams which receive our waste water from the Aroclor Manufacturing Process. We began sampling by first checking Snow'sCreek for definite globules of Aroclor lying in the bottom of the creek. We were only able to detect this a distance of about 1 block from the plant boundaries. Other points further downstream ware checked but no Aroclor layer was found. Samples were collected at six points downstream from the Anniston plant. One sample was caught upstream from the confluence of Show's and Choccolocco Creeks. This sample is to be used as a blank. Both mud and water samples were caught at each of these locations. The exact locations where these samples were collected are shown on the attached map of the Choccolocco Creek watershed. The data from these samples will be published as soon as it is received. During September of 1968 two secs of samples (mud and water) were collected from Snow's Creek. These samples were analysed for P.C.B. by organic research. Listed below are the results from these samples. Sample Loot ton <4msnt wter Plant Outfall 0.20 0.02)1 58 + 2 P.P.8. 1 Block Below Plant Outfall 1.64 + 0.04% Sample Broken Calculation of the above data into #/day yields a value of approximately 1 #/day of P.C.B. which is actually lost to Snow's Creek. The probable reason for the difference between 27^/day which we lose in the plant and the l#/day which shows up In Snow's Creek is that the analytical method used to measure losses In the plant measures tdtal organics losses. The losses In Snow's Creek were measured using the Organic Research method which Is specific for P.C.B. HONS 057612 Ml Ob Date pH 7.11C1 ganica 6/3 6.6 NDA 2.0 6 /4 6.7 NUA 11.3 6/5 6.7 NDA 2.5 6/6 7.2 NDA 5.5 6/7 6.3 NDA 6.0 6/8 6.2 NDA NDA 6/9 6.3 NDA NDA 6/10 6.2 NDA NDA 6/11 6.3 NDA NDA 6/12 7.1 NDA NDA 6/13 7.1 NDA. NDA 6/14 7.1 NDA NDA 6/15 7.4 NDA NDA 6/16 7.5 NDA 7.5 WASTE AUDIT DATASHEET Morgan ics /day 1.6 Sampling Point Aroclov Still Room Scwe Prod. FI OW Rate Comments 65 GPP 8.9 - 2.0 4.2 - 4.7 - -- -- -- - -- -- -- -- 5.8 - AVE1U GE #/I AY - 2 HONS 057613 WASTEj\mT DATA SHEET Department Date 1'" Aroclor Department 7.HC1 [PPM. Or panics -- 6/6 3.2 .10 2.4 Sampling Point CliLorinatoc Sc iv.- rnLl fyrgan cs /day /day Prod. Flow Ra tc Comments 3,000 7.2 250 GP i 6/5 6.2 NDA NDA -- - 6/6 10.8 NDA 1.1 - 3.3 - 6/7 3.6 .09 1.8 2,800 5.3 - 6/8 4.1 .10 10.9 3,000 32.8 - 6/9 2.7 .01 8.0 300 24.0 - 6/10 3.7 NDA 2.0 - 6.0 - 6/11 5.7 NDA 8.5 - 25.5 - 6/12 3.5 .04 NDA 1,200 - - 6/13 3.5 .04 NDA 1,200 - - 6/16 3.5 .06 NDA 1, 200 - - 6/13 4.1 NDA NDA -- - 6/16 2.7 .05 NDA 1,500 - - AVEKA IK #/r \Y 1,100 8.0 MOWS 057614 WASTE AUDIT DATA SHEET Department Date Pii __________ //Organics Sampling Point UC1 Sewer PPM 0) % 1IC1 ganiCv /Day MCI / (lav j Prod. Flow | Rate Comments 5/20 .9 1.1 NDA - 13, 201 LOO GP 5/21 .7 1.7 .5 .6 20, 40C - .'i/22 .9 1.2 NDA - 14,400 - 5/23 .8 1.6 .5 .6 16,800 - 5/2 6 .8 2.6 2 2.5 31, 20C - 5/25 .8 2.6 2 5/26 2.0 .i 4.0 2.5 31,200 4.8 1, 20C - 5/27 2.6 .i 5.9 7.1 1,20C - 5/28 1.5 .3 2.5 3.0 3, 60C - 5/29 1.0 .6 12 16.6 7,201 - 5/30 1.2 .6 7.3 8.8 7, 20C - 6/2 .6 . 2.3 .1 .10 27,60C - 6/3 .8 1.9 3.3 6.0 22,801 - 6/6 1.1 .7 20 24.0 8, 40C - 6/5 .8 1.3 6.6 5.5 15, 60C - 6/6 .8 2.2 8.6 6/7 .7 2.1 5.7 6/8 .9 1.3 5.7 10.3 26,40C 6.9 25, 20C 6.9 15,600 - - *. o5,"5 ' -j-----------------... J WASTE AUDIT DATA SIIEET Department HC1 Dep.irniienl:__________ Mm Oi Date pll 7. 11C1 g.inic. 6/9 .8 l.A HDA #Oreanics /Day Sampling Point liCl Sever Prod. Flow Rate Comn'cnts - 16,800 LOOGPM 6/10 i.i .5 5.0 6/11 .8 1.2 6.0 6.0 6,000 7.2 14,400 - 6/12 .7 1.2 4.5 6/13 .7 1.2 4.5 6/14 .7 1.2 A,5 6/15 .8 .8 5.0 6/16 .2 2.1 1.5 5.4 L4, 400 5.4 1.4,400 5.4 14,400 6.0 9,600 1.8 15, 200 - - AVE1M IE i7/n \Y 6.0 L3,000 HOMS 057416 WASTE AUDIT DATA SHEET Date P11 5/20 - 'prror * 7.HC1 janics - 32 i/21 - - 11 5/22 - - i/23 - - 7.2 5/2/. - - NDA 5/25 - - NDA i/26 - - 23 5/27 - - 7.5 5/28 - - 3.0 6/2-; - - 2.7 5/30 - - 6.0 5/31 - - 6.0 6/1 - - 4.0 6/2 - - 2.0 6/3 5.8 NDA NDA 6/6 6.4 NBA 13 6/5 6.7 NBA 10 6/6 7.2 NDA 13.3 `Organ cs /day 35.0 12.0 7.8 27.0 8.1 3.7 29.2 4.3 6.3 6.3 2.2 16.2 11.0 16.6 I Prod. Flow Rate 90 GPM Comments - - -' - - _ MONS 057617 WASTE AUDIT DATA SHEET DepartmentAroclor Department____ Date pH PPM Or 'AHCl ganici IfOrgan Lcs /day 6/7 6.6 NDA 32.6 35.2 Sampling Point Warehouse Se-./c. Prod. Flow Rate Comments 90 GP1 6/0 6.2 NDA 12.0 L3.0 - 6/9 - - 5.0 5.4 - 6/10 - - 8.0 8.7 - 6/11 6.2 NDA 5.0 5.4 - 6/12 5.6 NDA NDA - 6/13 - - NDA - - 6/16 - - NDA 6/15 4.5 NDA 60 65.0 - 6/16 6.1 NDA 2.5 2.7 ' r AVER/ GE #/I AY = 11.4 - MON S 057618 _