Document 41p99ExkaanknQx8O5O2aQoj

P*SnjTE& &7 *<, P '.soD&icM : OTHER TOPICS INSTALLING ENCLOSED TANKS WITHIN ALL EDC PROCESS RAINWATER SUMPS. (S1.Q4MM) INSTALLED STRAPPING SYSTEM FOR EDC TANKS FOR INVENTORY GAUGING. ($30M) EDC AMBIENT AIR MONITORING SYSTEM INSTALLED. ($325M) DOUBLE-WALLED/TRENCHED DECOMMISSIONING PIPING INSTALLED IN CRACKING/QUENCH AREA. ($465M) PLAN TO REPUCE EXISTING DECOMMISSIONING PIPING IN ALL EDC/VCM AREAS IN 1991-1992. PURCHASED ADDITIONAL EQUIPMENT (I.E., PORTABLE ANALYZERS, RESPIRATORS AND TRAINING). ($100M) REPUCING TAR STILLS ($5,2MM) SL 091750