$ du. ,, d fa Xv/` zh*.
Monsanto
.r*OM i*ma * cee*TioM P. B. Hodges - Qeneral Offices^"
J
ww .,t
January 23* 1969 AROCLORS IN PLANT EFFLUENT
TO ; Messrs.
E. a. Wright - ANNISTON
,C. F. Buckley - KRUMMRICH
C-O-N-F-I-D-E-N-T-I-A-L
Messrs.
W. R. Richard
- WHICH
W. A. Kuhn D. B. Hosmer
- WKUHN - DHOSM
E. S. Tucker E. P. Wheeler
- S. 2ND ST, - EWKEE
a. L. Bratsch
- KRUMMRICH
W. B. Papageorge
D. w. Jackson/
- ANNISTON - KRUMMRICH
B. H. Williams
J. C. Landwehr/
w. Taffee
- ANNISTON
With the likelihood that the attention now being focused on presence of aroclors in natural waters will draw attention to any aroclor being sewered In our production plant outfalls, we should begin to protect ourselves, since the problem. If any, has not yet been defined, I'm recommending at this time only action preparatory to actual clean up. Please arrange for the following:
1. Waste samples -- Before any clean 141 action of any kind
is taken, we need to know, at least approximately, how
much aroclor we are discharging into natural waters
via our waste outfalls.
I
We do not presently have techniques for analysing rater for aroclors in low concentrations. It is expected that these techniques will be developed by late this coming fall. Therefore, please collect, freeze and hold indefinitely three 2*3 liter samples of your out fall as it is discharged to natural surface waters (entrance to Snow Creek at Anniston; outlet of Viliege weste treatment plant at W. 0. Krumarlch). Scott Tucker, who is developing the analytical procedures suggests use of polyethylene bottles. Samples should be taken several days apart and should represent normal conditions, including one sample taken at peak loading (e.g. after dropping spent aroclor from P2S5 heat exchanger at W. 0. Krummrloh).
8. in addition to collecting the samples, commence collect
ing data on points and amounts of aroolor discharges to
sewers and means of disposal alternate to sewering.
This information will help permit us to move rapidly in
oaae a crisis develops. Do not proceed with abatement
projects at this time except as in (3) below. Publish
report on information developed along with roughly
estimated costs. June 1, 19&9, appears to be a reason
able deadline at this time for the report, but this
could change drastically.
`
, MONS 097268
IWONSi 0X00097236
WATER_PCB-00044116
.u
Messrs. B. a. Wright C. F. Buckley
-2 -
) January 23
3. In case you discover sewering of large amounts with a low cost alternate disposal method, proceed with the clean up. One example Is the sewering of spent aroclor from P2S5 operations at W. a. Krummrich. From standpoints of possible sewer pluggage plus gmrany hard-to~handle solids collected at the waste treatment plant, present practice
, Is poor. Anniston Is drumming and hauling their similar spent aroclor to a dump. We suggest that W, 0. Krummrlch find out how Anniston is handling this and proceed with a similar set-up if it appears practicable and reasonably economical.
Let me know If you have questions regarding this.
Paul B. HodgeB acd
SONS 097269
MOWJHf IXOO097237