4TER-OFFICE MEMORANDUM
to:
# at :
R. J. Wolf Oakland
copies to;
L. H. Oppenheim J E Hughes W. F. Bort F. X. East
date : October 30, I96U
from: D. A. Daly
S
at : Middletown
(J
job no. : 7100
subject ; Armco Project n600" - Middletown Works Expansion Program
DAILY PROCESS REPORT NO. I63
Assigned Program Personnel, October 29 1961;:
Technical Construction Administrative Clerical Subcontract Personnel On Loan
Total
51 11
9
2h
k
__ 3 102
Progress:
#
1. Slag Processing Thcility: Results of leasi with the Armel Construction Co. requires Armco to change the location of the access tracks for the Slag Processing Facility. This will result in a change for the Dicks Creek crossing. Revisions required to make this change are presently being investigated.
2. Hot Strip Mill Specifications: The memorandum specifications for the slab tongs and coil handling equipment have been submitted to Armco for approval.
3. Armco Standardization Specifications: Standard specifications were started in Chicago this week.
li. BivnrHng Architectural Treatment: Various architectural studies of the exterior walls were presented to Armco. One scheme was generally approved and requested to be developed further. The scheme concept is to- provide a recessed base course approximately lU feet high at all exterior walls. This base would encompass all truck, personnel, and ven tilation doors. An additional detail is being pursued which will show a heavy save line.
Visitors:
E. L. Baldinelli, Oakland - Hot Strip Mill CPM S. A. Haines, Chicago - Design Drawing Procedures R. Ratza, Chicago - Design Drawing Procedures RH. Shankland, Chicago - Design Drawing Procedures
L KEN 004783
t
t
TO: R. J. Wolf
COPIES TO
SUBJECT
JTER-OFFICE MEMORANDUM DATE: October 30, 16U
FROM
AT JOB NO.
Page 2
Out-of-town:
D. A. Daly, Butleij Pennsylvania - Master Planning V. L. Frankson, Butler, Pennsylvania - Procurement Procedure J. W. Irvin, Butlei; Pennsylvania - Master Planning
DAD/gma
KEN 004784