Document 3rQa9k7ZpOO1a6LDNvbonb2D

Monsanto "mo* Kami t loc*i>o E. E. Stewart, W. 0. Krummrich Plant Bt'l (>((NCI December 5, 1972 PROJECT 3956 "Alterations to HC1 Distribution System" "A. E. Lelsy R' Ll plelds TO : Messrs. Virgil Brawley Bill Engman Bob Heider Dave Macdonald Bob MeCutchan The above met 12/4/72 to review pending alterations to the HC1 distribution system per Project 3956. in essence the system can be depicted per the attached sketch. At present a seal tank exists to prevent Dept. 246 off-gas from being sewered at Dept. 236. The liquid seal appears to be gone, and possibilities exist for sewering 246 off gas at Dept. 236. Installation of the double control valves on the highllne will prevent the flow of gas from Dept. 246 to the drowning Jet at Dept. 236. 1. The only problem to be resolved with the highllne valves is supervisory responsibility for operation of the control scheme, and maintaining a written schedule of the test Intervals with verification that testing was performed per schedule. Per Dale Schilllnger's Safety Review minutes of 5/11/72, Mr. Lelsy will designate supervisory responsibility. Die off-gas piping modification and control Instrumentation will be Installed at Dept. 246 to eliminate sewering off-gas containing PCB when 246 gas Is available In excess of the 217 requirements. A high header pressure will result In the automatic shutdown of the chlorine feed to all batch and continuous chlorlnators. Instrumentation at the off-gas drowning Jet will restrict the flow of water to those periods if pressure on the header continues to Increase after the chlorine valves are automatically closed. Additions that must be Incorporated Into the original project package of 7/17/72 are: 1. Provide recording of high line Ap valve position in the 246 control room. IN 10 *ev. I'T HONS 0297*7 PROJECT 3956 ALTERATIONS TO HC1 DISTRIBUTION SYSTEM Page 2 12/5/72 WGK 2. Trace and Insulate water piping at 246 off-gas drowning Jet to prevent freeling during winter when water Isn't being used on Jet. 3. Trace and Insulate chlorine feed lines to batch chlorlnators In section between automatic chlorine valves and entrance to chlorinator. To prevent freezing of biphenyl when chlorine is shut off and material flows from chlorinator back into chlorine feed line. Possible problems are anticipated after the system Is installed during periods when Dept. 246 Is sole source of HC1 to Dept. 217. Fluctuations In demand for HC1 may cause Intermittent pressure build-ups In the off-gas header with frequent resultant automatic shutdowns of the chlorine feed. This will be evaluated after the project Is installed. 1. In the event frequent shutdowns do occur and beccme Intolerable It may be necessary to by-pass the header pressure - chlorine feed Interlock until the problems can be resolved. 2. It will be necessary to continue using water on the Jet via bypass until the aeration process step be discontinued or separated from the off-gas drowning Jet. This project Is scheduled for completion In January per Dick Burbott. Ed Stewart Technical Services Department /tm att HONS 029748 V ^wr 300 Ort IT ----' too UWIT (jfoMfiLt) n AP lo-^O T+ VW 2i& CC^Tttoc fceoPA /^P IVU3*J</ ^^ A v #< 744, ecvitcL k-ocv\ >P hjtrJcu- 0~ls> 4 Uko*. ijsaj^ D-to% 14. KAD( }Ul{CU MMb 3-4^* Hj? CTF df icJlA-IOC W^1* \p> -- C *4 HOUddt*Cdr<Jfc_ ^ * A Lah>\ sitjohl go' Ci\. itfu/t JtfHira:? JS3* wWitTO Jt*' \MOt Ctoi ?zS* <^-<2*5 Odft.l*JC VAu/t 1 (7 /I I %evJ&r *A 5 X