Document 3rB9N7VXknm51ELV1E4KJBJJ
From: "Cameron, Scott J" <scott_cameron@ios.doi.gov> To: "Williams, Colin F" <colin@usgs.gov>, "KSweeney@nma.org" <KSweeney@nma.org>, "jprosser@nma.org" <jprosser@nma.org> Cc: "Ryker, Sarah J" <sryker@usgs.gov>, "Kirschling, Teresa L" <tkirschling@usgs.gov>, "Russell, Kendra L" <klrussell@usgs.gov>
Subject: Re: Follow-up information on mine permitting timelines Date: Sun, 02 Mar 2025 22:41:48 -0000
Importance: Normal Inline-Images: image.png
Thanks,
Scott
Scott J. Cameron
Senior Advisor to the Secretary of the Interior
Get Outlook for iOS
From: Williams, Colin F <colin@usgs.gov> Sent: Sunday, March 2, 2025 4:46:57 PM To: KSweeney@nma.org <KSweeney@nma.org>; jprosser@nma.org <jprosser@nma.org> Cc: Ryker, Sarah J <sryker@usgs.gov>; Kirschling, Teresa L <tkirschling@usgs.gov>; Russell, Kendra L <klrussell@usgs.gov>; Cameron, Scott J <scott_cameron@ios.doi.gov> Subject: Follow-up information on mine permitting timelines
Katie and Justin,
Thank you for the informative and productive discussion last Wednesday. It was great meeting you and talking through some of the issues faced by the mining sector. As promised, I'm including a figure below with the information USGS compiled in two publications that addressed mine development timelines. As you know, we don't have permitting responsibilities, but for these two publications - the results of the USGS global copper resource assessment and a survey of rare earth element deposits in the United States - the authors wanted to include information on development timelines in order to better inform resource strategies.
The table from the REE report is the more relevant as it has information on the time involved in permitting, the time from completion of permitting to production, and whether litigation was involved for all the mine projects for which the authors could find information in the period 1998 to 2010. Two of the mines, Eagle and Arizona 1, were not yet in production at the time of publication, but I have added that information in red.
The bottom line is that in 1998-2010 time period it took approximately 8 years to permit (longest being 17 years) and between 2 and 3 years to start production after permitting (longest being 5 years). I should note that the table includes Federal and State permitting for both new mines and restarting production at existing mine sites. The shortest permitting timelines are associated with the existing mine sites.
As I noted above, tracking permitting is not a normal USGS function but was relevant to these two publications. I expect there is information available which could fill in the gaps in the S&P Global study (a topic for a different time!) and in the 15 years since 2010.
Sierra Club v. Dept of Interior - 3:25-cv-05375-PHK
0001089 SC_EVERSPLIT0013936
Please feel free to reach out on any other topics related to our USGS mission.
cheers, Colin
******************************************************************
Colin F. Williams, PhD Program Coordinator Mineral Resources Program US Geological Survey Building 19 350 N. Akron Rd. P.O. Box 158 Moffett Field, CA 94035 colin@usgs.gov Tel: 650-439-2881 Cell: 650-888-3755
*******************************************************************
USGS INFORMATION ON MINE PERMITTING TIMELINES
Safford Carlotta Robinson
Cerro Verde Sulfide Cerro Verde Tie Maria
Cerro Corona Galen
Chapi
Monywa Milpilles
Piedras Verdes Phu Kham
age Bijou r. Grasberg Mirador Radom. TorMe
Fortuna El Abra Los Pelambres
Rosario Andacollo Cu
Escondida Norte El Cheesy
Cerro Colorado
Lomas Bayas Quebrada Blanca
2aldivar
Gaby Esperanza
Spence
Escondida Ufina
Huckleberry Minot
Mt Polley
Kemess New Afton
Balcooma North Parkes
Alumbrera
GLOBAL PORPHYRY COPPER MINES: TIME FROM DISCOVERYTO START-UP
Table 12. Time required to obtain permits, construct, and commission recently opened metal mines in the United States.
IN, A, not yet achieved, production not yet begun or commercial operations not achieved; PGE, platinum group elements. Yes, long permitting and development delays because oflitigation by government agencies and nongovernmental organizations]
Mine
Commodity
Alta Mesa, Arizona I, Ashdown, Buckhom, Carlota, Eagle,
"texas Arizona Nevada Washington Arizona Michigan
U U Mo Au Au Cu Ni Cu Co PGE
Permitting began
1999 mid-2007
2/2004 1992 2/1992 4/2004
Permitting completed
2004 2009 11/2006 9/2006 6/2007 1/2010
Production began
Commercial operations
began
10/2005
1/2006
NYA(11/2009) NYA
12/2006
NYA
10/2008
11/2008
12/2008
1/2009
NYA (9/2014) NYA
Litigation reported
Yes.
Yes. Yes. Yes.
East Boulder, Montana
PGE
Kensington, Alaska
Au
Leeville,
Nevada
Au
Lisbon Valley, Utah
Cu
Pend Oreille, Washington
Zn
Phoenix,
Nevada
Au
1995 3/1988 7/1997 2/1996 1992 1/1999
1998 6/2005 8/2002 7/2004 9/2000 1/2004
6/2001
1/2002
9/2010
NYA
Yes.
10/2006
4th quarter 2006
1st quarter 2006
NYA
Yes.
1/2004
8/2004
10/2006
401quarter 2006
Pogo,
Alaska
Au
12/1997
4/2004
2/2006
4/2007
Rock Creek, Alaska
Au
2003
8/2006
9/2008
NYA
Yes.
Rossi (Storm), Nevada
Au
1990
3Q/2006
3/2007
12/2007
Safford,
Arizona
Cu
4/1998
7/2006
4th quarter 2007 2nd half2008
Yes.
Turquoise Ridge, Nevada
Au
9/1995
5/2003
2004
NYA
10
20
30
40
50
Time lapse from discovery to mine startup. in years
60
US MINES PERMITTED BETWEEN 1998 AND 2010
MI United States
Pe.
MI Burma
EXPLANATION
MI Mexico
Ecuador
Laos
IN Chile
MI Indonesia MIE Canada
-
Australia
IME Argentina
PERMITTING AVG = 8 YRS;TIME TO PRODUCTION AFTER PERMITTING = 3 YRS
Long, K.R., Van Gosen, B.S., Foley, N.K., and Cordier, Daniel, 2010, The principal rare earth elements deposits of the United
Hammarstrom, J.M., bentek, M.L., Parks, H.L., Dicken, C.L., and the U.S. Geological Survey Global Copper
States--A summary of domestic deposits and a global perspective: U.S. Geological Survey Scientific
USGS Mineral Resource Assessment Team, 2019, Assessment of undiscovered copper resources of the world, 2015: Investigations Report 2010-5220, 96 p. http://pubs.usgs.gov/sir/2010/5220/.
IL
U.S. Geological Survey Scientific Investigations Report 2018-5160, 619 p., https://doi.org/10.3133/sir20185160.
Sierra Club v. Dept of Interior - 3:25-cv-05375-PHK