Document 3qN9qNJoddokMd25XMx7m9mE

FRAZER RAICT COMPANY 2475 Hubbard Avenue Detroit, Michigan SCHEIUIE I TRADE NAME; CATEGORY: COLOR: QUALITY: Zone Marking Paint Zone or Traffic Paints White First Pigment: 505? Lithocone Asbestine Cryptone . Vehicle: 50^ Heavy Bodied Linseed '"Oil Varnish Drier Mineral Sririts Tollac Lbs. 63 3 16 6* 44 1 7 3 Yield in Gallons Unit Cost Total Cost Weight .045 1.94 per .01 .03 gallon .0585 . .94 finished Storage & handling cost product. through loss - 1% Laboratory record 11.6 lbs. .143 .10 .86 4.40 .07 .015 .07 ' .11 .07 .21 Storage & handling cost through loss - 2.91 .29 5.65 .17 Calculated Yield Manufacturing Loss - 2\% Actual Yield 12R ic.6 .9 10.3 Cost Analysis: Material cost per gallon Direct labor cost ner gallon Factory overhead per gallon Bulk cost per gal.on Complete package cost per gallon, including filling charge Factory cost in package per gallon PRICES (a) To a company owned or controlled outlet (b') To an independent wholesaler (c) By compeny owned or controlled outletto retail customer (d) To an independent retailer (Dealer) (e) To ether (Industrial) (Contractor) c .02 .88 .06 .XV 1.18 None None 2.25 2.74 i ,0^ i.'O ^tSoQUCED AT THE NAUUKAL N 5145