Document 3qE5xz47J0000GEOO1Rv3gEa

CORNING CX>RPORATIO XNTKB-OmCE CORRESPONDENCE Prom J. L. Hyde Ditt June 3. 1969 Per our conversation of June 2, 1969. listed below ere estimated costs for dust collection at Port Allegany and Tyler. Port Allegany Mixing Area Sawing Area Sub Total $105,43l* 8,980 $114,414 ; - ? ft m .9r:l * *r Mixing Area Sawing Area Sub Total $111,251 34,661 $145,912 Grand Total $260,326 In reviewing these figures, the following points must be considered: *'vyj>* *\:j 1. Included In the estimate is the price of the Pengborn dust collector. Pangborn was the only company, to date, that met Port Allegany's requirement of greater than 6" diameter bags. Therefore, consideration should be given to 6" bags since our consultant (Or. Corn) has assured PC that they will do an adequate job and the price of a unit with six inch bags is estimated at $15,000 less than the Pangborn unit. 2. A new dust collector will not be required in the saw area at Port A)legany. 3. All new equipment will be required at Tyler. 4. Firm quotes were not received for internal labor, erection and duct work fabrication and erection. Plant personnel were unable to aid l in compilation of costs because of prior commitments (Furnace Mechanization). 5. Costs are based on three lines at Port and three lines at Tyler. 6. No make up air is Included for the Tyler operation. 7. A 10% contingency allowance has been added to selected items. 8. Tyler requirements will be essentially the same as Port Allegany. JLH/pm ATTACHMENTS Hyd, V/ S' * Fort Allegany - Mixing Area 1. Purchase new dust collector 2. Erect dust collector, fabricate & erect cyclones * v. -(includes structural supports t miscellaneous duct work transitions, ate.) and relocate existing dustcollectors. 3. Dismantle existing duct work *4 men 1 week at$7.00/hr. 4. Fabricate hoods (Labor t material) 5. Install new duct work (Labor t material) 6. Pour foundations for new dust collector A add to existing foundation. 7- Hook up new dust collector fan (Labor & Material) 8. Purchase No. 60 fan for existing Nor-Bio unit 9. Purchase starter and disconnect for fan 10. Hook up fan If. Purchase (2) make up air units (25,000 CPH ea.) 12. Install units and duct work 13* Hook up Total * Add 10% contingency for starred items Grand Total Port Allegany - Saw Area 1. Oismantle existing duct work- 2 men 1 week at $7-00/hr. 2. Build dust rooms- 2 men 3 weeks at $8.00/hr. Material 3. Build Hoods *48 hours at $8.00/hr. Material U. Install duct work - 6 men 1 week at $8.00/hr. Material 5. New fen for existing dust collector Starter Hook up Total Contingency add 10% Grand Total $ 1+0,61*4 30,622 1,120 * 4,200 * 9,160 * 2,200 * 500 * 91L J+50 500 * 11,956 1,000 * 300 $ 103.536 1,898 $ 105.*43*4 $ 560 1,920 300 38A 50 2,000 1,000 1,000 1*50 500 $ 8,16*4 816 $ 8.980 ^ ' ;Tyler - Mixing Area A- _ ) ; * .. s. NtcKim new dust collector .(approximately *0,000 CFK) direct dust collector 1296 bags $> $17-00/bag fabricate and install cyclones (includes structural steel end ducting). Alaamntle existingduct work and dust collectors * men 3 weeks $7.00/hr. fabricate hoods (Labor and Material) Install new duct work (Labor and Material) four foundations 35 yds.' > $50/yd. Hook up fan (Labor and Material) Total Contingency add 10% Grand Total $ *5.000 22,000 ,1b, 16? 3,360 *,200 10,160 1,750 500 $ 101,137 10,1)4 $ 111.251 Tyler - Saw Area 1. Dismantle existing duct work ( dust collector^ men 2 weeks < $7/hr.$ 1,120 2. Build dust rooms - 2 men 3 weeks at $8.00/hr. 1.920 Material 300 3- Build hoods *8 hrs. $6.00/hr. *80 Material 50 *. Install duct work Labor - 6 men 1 week > $8.00/hr. 2,000 Material 1,000 5. Purchase new dust collector (approximately H,000 CFH) 15.000 6. Erect new dust collector *32 bags P 20/bag (smaller collector) ,8 6*0 j. Hook up fan (Labor & Material) 500 8. Miscellaneous transitions 500 Total" Contingency add 10% $ 31.510 3.151 Grand Total i 3**.661 :->r* m