Document 3eze1eqvbVKdJ4rgg08Jr928J

Monsanto ....... . R- Savage - General Office October 8, 1971 SEPTEMBER 1971 PCB REPORT Pc - F')> H. S. Bergen P. B. Hodges TO B. Papageorge General Offices A. W. G. Krummrich Plant I. PCB Level In Sewers Aroclor sewer loss control data are attached. There is a difference between the measured plant exit losses and the amount analyzed at the treatment plant. Whereas the |lant exit losses continue to indicate a reduction (50% lower in September compared with August), the treatment plant influent samples contain 5 times more PCB, and September losses equal those of August. Additional sampling is in progress to better define the magnitude and source of PCB losses. A. Aroclor Department - The average daily loss from the department measured 0.2///day. An additional sampler was Installed in the sewer box adjacent to the department. Intent was to pick up material from bottom of box in attempt to detect slug flows from the department. A visual check was made on daily basis at intervals in September. No PCB's were ever detected. B. Total Plant - September daily losses through the 26th averaged 6#/day. This is about 50% of last month's level and the lowest yet recorded for a month. However, losses measured into the treatment plant are several times the amount leaving the WGK Plant. Grab samples and additional sampling with a different type pump would indicate that measured losses at the plant exit 24" and 30" sewers are in error. This discrepancy must be resolved. All sewer boxes in the 24" sewer from the department to the plant exit.were agitated with air. Purpose was to move any PCB's that may have settled along the sewer route. C. Treatment Plant Effluent - September (through 29th) averaged at 170/dayj 30% greater than last month. PAUL HODGES DEPOSITION May 31 - June 1, 1994 EXHIBIT NO. 34 IN ff H| V ft >. CONFIDENTIAL 32-CV-204-1S CER 015616 HARTOLDMONOOQ7279 W. G. Krummrich Plant (Contd) Page 2 II. Project Statue" Estimate No. 2095 "Aroclor Scrap Rework" - To permit rework of returned mater ial. 95+% complete. EDC extended to 11/1/71. 2422 "Paving and Curbing" - To contain losses In car and storage area in Dept. 246. Curbing pads complete. Major sewer to be Installed North. EDC extended to 11/1/71. tank and to 2482 "Contaminant Collection at Rip Track" - To permit better control of tank car washings and drawings. 25% complete. EDC extended to 11/1/71. 2675 "Air Pollution Control" - Provide nitrogen blanket on mix tanks and redirect chlorinator rupture disc lines to reduce atmospheric pollution in Dept. 246. Design package issued for nitrogen blanket. Hold rupture disc lines in abeyance because of possible safety problem. 3102 "Enlarge Aroclor Settling Basin" - To permit containment of possible losses in the operating department. EDC - not yet scheduled. III. Program Status Continue to take routine samples and review on daily basis At present, we do not know source of possible PCB loss and we do not have a PCB material balance on the sewer system. Must define. Will define altered program required to approach plant goal of l///day maximum. 00 CM 1 CM c=a B. ANNISTON PLANT I. Current level - Aroclor losses during September averaged 0.56///day (71 ppb). II. Projects Three of the four departments using Therminol FR-2 (Aroclor 1248) will be changed out week of October 4 to a non-PCB type of Therminol. Santowax and Solid Aroclor system will use a new product called OM-16. HB-40 will use Therminol 66. Changeout will occur in October 1971. The P2S5 Department will use Therminol 66 and will be changed out during the Niran turnaround in January 1972, III. Spills - There were no Aroclor spills during the month of September 1971. md J. R. Savage r *4 nO i--n4 o oueei HARTOLDMON0007280 C; Q-- ov . IM > n- I Utu m SI > :;\y" :r :rr. zLL ii-; _----:;----u--U------- if,; A ;jyy ^ V7-j-"'-? QER CONFIDENTIAL 92-CV-204-WDS . ^- 015618 HARTOLDMONOOQ7281