Document 3erKR4KQ8Y6DO3okgyjkLZBX3
THE DOW CHEMICAL COMPANY ELECTRICAL TECHNOLOGY GLOBAL
ADMINISTRATIVE GUIDELINE G7A-0099-03 18-OCT-1995 PAGE 1 OF 4
CAS E
ELECTRICAL SAFETY AND RELIABILITY AUDIT CHECK LIST FOR
POWER TRANSFORMERS Tf
TRANSFORMER LOCATION I.D. # JjL'fAp .D
TRANSFORMER EQUIPMENT I.D. #
VOLTAGE Aj/poLyfH kVA .<&>* ...:
Yes No N/A
1. Is the transformer properly tagged?
_
2 . Is the manufacturer nameplate in place and legible?
3. Is the transformer case free of any signs of corrosion?
4 . Is the transformer case adequately painted?
5 . Is the transformer case free of any oil leaks? (Look at case, bushings, radiators, and
valve.)
6. Are oil samples taken regularly?
7 . Is the transformer adequately grcu' have two leads if its capacity is above)
i? (Must KVA and
8. Has the transformers been checked for PC3's and properly labeled?
--
jZ
9. Are vehicle barricades located if needed?
10 . If the transformer has open bushings, is there a fence surrounding the transformer?
11 . Are there warning signs posted on the fence?
12 . Is the fence grounded?
13 . Is the transformer operating free of excessive noise and vibrations?
-- -...
jZ
-- --
14 . Is the transformer operating below rated capacity?
D A 04511O
t
l
THE DOW CHEMICAL COMPANY ELECTRICAL TECHNOLOGY GLOBAL
ADMINISTRATIVE GUIDELINE G7A-0099-03 18-OCT-1995 PAGE 2 OF 4
15. Is the transformer located away from process piping?
-4Z
16. If transformer is within 20 feet (6 meters) of
building, is the building wall non-combustible?
17. is there easy access for fire fighting? 18. Is the transformer bolted to foundation?
t/
19. Is the transformer on a PPM program?
20. Is the transformer maintenance history being kept?
/
21. Is high resistance ground system in place? 22. Is ground detector system on PPM schedule?
________________ ^
23. Does transformer have a circuit breaker on the primary? (10,000 kVA and above)
24. Is short circuit protection available?
25. Is protective device coordinated with other devices?
i/ ____ ____
26. Is dissolved gas analysis data available? (1000 kVA and above)
_________
27. is there a dike around the transformer to contain an oil spill?
28. Is there a pit with oil/water separation? 29. Is the pit protected with a fire barrier?
Case Index Score:
____
H___
RADIATORS
Yes No N/A
1. Is the transformer radiator free of any signs of corrosion?
2 . Is the transformer radiator adequately pai.nted?
CGO^A D04S^1i(i
THE DOW CHEMICAL COMPANY ELECTRICAL TECHNOLOGY GLOBAL
ADMINISTRATIVE GUIDELINE G7A-0099-03
18-OCT-1995 PAGE 3 OF 4
Yes No 3. Is the transformer radiator free of any oil
leaks? (Look at case, bushings, radiators, and valve.)
N/A
4. Are the radiators removable with cut-off valves? (2000 kVA and above)
5. Are cooling fans operating properly? Radiators Index Score:
3
INSTRUMENTS
Yes No N/A
M -l
1. Is che oil level at an acceptable level?
2. Is the oil level gauge in good condition?
3. Is che tank pressure at an acceptable level?
4. Is the tank pressure gauge in good condition?
5. Is the Buchholz Relay in good condition?
6. Is the Sudden Pressure Relay in good condition? (required for 10 MVA and above)
7. Is the Pressure Relief Valve (PRV) in good condition?
8. Is che transformer running at an acceptable temperature? (below 50 degree C rise above ambient)
9. Is one temperature switch and level switch wired to alarm in a continuously occupied location? [LPP 3.7.6]
10. Is the breather system in good, condition?
Instruments Index Score:
THE DOW CHEMICAL COMPANY ELECTRICAL TECHNOLOGY GLOBAL
ADMINISTRATIVE GUIDELINE G7A-0099-03
18-OCT-1995 PAGE 4 OF 4
BUSHINGS
Yes No N/A
1. Are the exposed bushings clean?
2. Is the termination hardware on exposed bushing clean and without any signs of corrosion?
3. Are exposed bushings equipped with lightning protection devices?
Bushings Index Score:
tlh
CONDUIT/CABLE
Yes No N/A
1. Does cabling enter transformer from bottom or side only?
2. Is cabling or duct anchored to foundation?
Conduit Index Score:
3
TAP CHANGER
Yes No N/A
Score: Power Transformer Average Index Score:
DO A 045113 CONFIDENTIAL