Document 3enw55qOz8qRBM8nNz6QGYLkn

Ethanolamines/Glycol Ethers Tier Procedure Section Number: Issue Number: Original Date: Revision Date: Title: References: 1312 1.3 04-21-92 Author: Tim Dill 12-29-95 Pulling Tower Pressure Safety Valves (PSV) Glossary Of Equipment Identification (Text #114) 1312. Pulling Tower Pressure Safety Valves. 1.0 Objective: 1.1 To perform this task in a safe and efficient manner without damage to equipment or injury to personnel. 2.0 Responsibility: 2.1 It is the responsibility of the operations supervisor and the senior operations specialist to ensure that this procedure is fully complied with. 2.2 It is the responsibility of the senior operations specialist and the operations specialist to ensure that this procedure is executed in a safe and efficient manner. 3.0 Safety Notations: 3.1 Monogoggles, gloves, and a radio are required when performing this job. 4.0 Special Notations: 4.1 If at all possible these safety valves should be pulled while the towers are down for maintenance or series switch. If the plant is not down, the valves may be pulled while the plant is running under normal conditions. At no time can the plant be in startup or shutdown conditions without the safety valve in place. 4.2 On some of the towers, a 35 ton crane is needed for pulling the PSV. If so, this needs to be scheduled ahead or time. 5.0 Procedure: 5.1 To pull the PSV's with the tower still in service, the board person must monitor the column pressure continuously throughout the job duration, (that is while people are on . the tower pulling or installing the valve) 5.2 The operators performing the job must have a radio with them to communicate with the control room. Date Printed: April 18, 1998 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: Towrpsv.doc Page 1 Of 2 nn A A 059506 confidential 5.3 The bleed valve between the safety valve and rupture disc must be opened prior to initiation of the job to insure that the rupture disc is not leaking, since several of the columns are under vacuum, the bleed needs to be checked to determine if air is being pulled in. The removal of the PSV should not occur if the rupture disc is leaking. 5.4 If there is an upset on the column or a sudden increase in pressure, the operators performing this job must be communicated with and told to get away from the column. 6.0 Revisions: Revision No. 1 07-20*93 Yearly Review Revision No. 2 08-23-94 08-23-94 1312.4.1 only done under stable conditions. 1312.5.3 check rupture disc leakage at bleed valve. Revision No. 3 12-29-95 Yearly Review Date Printed: April 18,1998 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: Towrpsv.doc Page 2 Of 2 DO A 059507 CONFIDENTIAL