Dear Dr. Richard:
-.
For the past several years Dr. Royal D. Suttkus and I have conducted a biological survey of the Coosa River, Logan Martin Reservoir, Choecoloeco Creek, and tributaries for Monsanto Company. Presently we are working directly with Mr. J. T. Bell of Monsanto Company. Mr. Bell has informed
us that approval has. not boen granted for continuation of the survey, hence I would like to discuse the matter with you since Mr. Bell has indicated thet you would be the appropriate person to contact.
I am enclosing a document entitled, "Request for Renewal of Contract dated November 5, 1970, between Monsanto Company and Biological Consultants:
Dr, R. D. Suttkus and Dr. 0. E, Gunning." As consultants we recommended that our contract bo extended for one additional year In order that we may learn whether or not there will bo a doorcase in P.C.B. residues in the fishes of Cboocolocco Creek and the Coosa River. Since completion of the above document we have received residue date for the March, 1972 and June, 1972 collecting trips. These data have been examined and I have communicated with Mr. Bell
in this connection, Mr. Donald Turner, Monsanto Company, Anniston, Alabema, la presently working up the residue data for tho last sample of fishes we oolloctod from tho ten stations on Choccolocco Creek, Logan Martin Reservoir, Cooes River, and tributaries. This sample of fishes was collected during
September, 1972, For seven of the eight trips we made, P.C.B. residues were till bolng released at Anniston into Choccolocco Creek. Only the eighth
trip, September, 1972, will yield data for fishes that were not being exposed directly to P.C.B's from the plant effluent, although they arc of course in the environment which has considerable levels in the sediments and in the
various organisms that fishes feed upon.
Viewing the survey from the standpoint of Monsanto Company, you are at
the crossroads so to epeak since It Is the September, 1972 end any subsequent trips that will. Indicate whether or not there i6 an immediate drop in residue levels of P.C.B's subsequent to curtailment of effluent discharge of P.C.B's from the Anniston Plant.
094840 MOhS
*Pee 2
Our contention Is that the present situation at Anniston needs to be Studied by Monsanto Company. Obviously Dr. Suttkuo and I feel that wo are In the best position to collect and Identify the fishes, and further that Mr. Bell and Mr. Turner are In the best position to analyze the fishes for P.C.B. residue levels since they have been handling the materials In a thorough and professional manner. An examination of the data for P.C.B. residues supplied by Messrs. Bell and Turner will show the good Job they have done In working with us on this project.
In all candor I must state categorically that it Is In the best Interests of Monsanto Company to continue the study as outlined In our proposal, whether we do It or not.
Thank you for your consideration,
geg Enclosure
Very truly yours,
v
Oersld E. Gunning, Ph.D, Biological Consultant
MUNS 094841
Request for Renewal of Contract dated November 5, 1970, betwoen Monsanto Companyend Biological Consultantst Dr. R. D. Suttkus and
- ' Dr. 0. E. Cunning
Introduction!
'
For the past two years consultants have conducted a biological survey of the
Streams affected by Monsanto Company discharge at Anniston, Alabama! Choccolocco
Creek, Coosa River, Logan Martin Reservoir, and various tributaries of these.
'
The survey has actually consisted of two separate but related parts: 1) An
Ichthyological survey of these waters designed to determine species composition
and relative abundance of the various fishes presont with a view toward ascer
taining any possible effects the Monsanto effluent might have on the fish popu-
' lotions, and 2) A residue analysis conducted by Monsanto Company using fi6hes
' from ten (10) stations supplied by consultants. Consultants have interpreted
the residue findings on a trip-by-trip basis during the first two yearB of the
present contract as they are available from Monsanto Company employees. We have
' worked rather closely with Mr. J. T. Bell and Mr. Donald Turner of the Anniston
plant, snd previously with Mr. Wright before he left Monsanto Company.
Background i
'
Consultants have found a rather large number of deformed flshca below the
' point of effluent discharge, as well as many fishes that are hemorrhaging or
' exhibiting various degrees of nervous system damage. Those Instances have been
reported to Monsanto regularly. Since these fishes are found in ports of the
'stream that are characterized by high P.C.B. levels, one must admit the posslt
blllty that debilitation is due directly to P.C.B s or other products manufactured
by Monsanto.
MOWS 948^
Analysis of five ssts of data for trips made during December, 1970; March, 1971j. -June,. 197ij September, 1971; and.December, 197i have shown'that
there has been no decrease In P.C.B. levels during this time, that Is to say the
levels within a given species of fish have remained fairly constant. Mr. Turner
Is presently doing the analyses for the March, 197X survey and has In .his possession
the fishes for the June and September trips as well. Other work at the plant
oaused this delay which will be rectified by-the end of December, 1972 (personal
Communication with Mr.-Bell and Mr. Turner)* -
.. - -
. r- The release of P.C.B. efflucnt in some form, or to some degree, has been
suoh that the first trip for the collection of fishes that should be free of
P.C.B. effluent discharge was made In September, 1972. This is the last trip in
our. present contract,-hence this .request for a renewal. .
_
Proposol for Additional Worki
-
. As consultants we recommend that the contract be extended for one additional
year In order that we may learn whether or not there will be a decrease In
'
P.C.B. residues In the fishes of Choccolocco Creek and the Coosa River. It is
Imperative that residue analyses be made for at least two survey trips In order to
determine whether or not the curtailment of P.C.B. release Is reflected In the
fish residue levels. The Ichthyological survey (two trips) would be continued In
Its present form In order to monitor specloo composition and relative abundance
of the various fish species as In the past two years of the survey. A study of the
frequency of deformities and other abnormalities would be included as an Integral
part of the ichthyological survey as well.
.:
MONS 09*8*3
Cost of Roneval Contracts
Trip 1 '
March, 1973
Dr. Suttkus--$l,800j Dr. Cunning--$1,800; 2 students--$1)00 total,
1,0, $200 each per trip; Jar allowance for year--$250.
Grand total of $li,20 for Trip 1
Trip 2 . September, 1973
.'
Dr. Suttkus--$1,800; Dr. Gunning--$1,800; 2 studonts--$ls00 total. Grand total of $2t,000 for Trip 2
Bence, total oost of survey for one ye'sr would be $8,250 plus expenses, i.e.
vehiole travel of 10(t per mile and actual motel expense for the four men
(see original contract).
'
(Signed)
,\
Oerald S. Gunning, Ph.P, Biological Consultant