Document 3egQNE8GXoZ9oDxp3R9DO7rGJ
1
Pursuant to your memorandum dated December 22, 1986, requesting status of the Sherwin Plant's Asbestos Control/Rsroval Program, please find enclosed a progress report of the itons listed on the asbestos audit in question and a cost estimate to carry out a removal/repair/replacement program for asbestos-containing bulk insulation. Capital funds had been requested in' previous years to repair insulation but they were not approved until the 1987 budget, when $500,000 was allocated. The asbestos insulation removal/repair/replacearent program could be completed by 1990 if funding could be obtained. This estimate reflects a cost effective program to repair and encapsulate the damaged/exposed/friable asbestos insulation where deemed appropriate or
Attachments
003908
APPENDIX III SREKWIN ALUMINA PLANT STOREROOM ASBESTOS PRODUCTS
PRODUCT * Ring gaskets
*
Glass sight gaskets
Coil belt gasket (4")
H
Rope Sheet gasket Gasket
Gasket, cylinder head Gasket, Clark Brothers
)
Ca ring gasket
Gasket, water connection Gasket, Ingersol Rand Gasket, Spacer Sheet Gasket
*
Gasket
Gasket, cylinder valve cover
Gasket, gould Coil brake lining Gasket, DeLaval Gasket, ring woven
Gasket, Flextaulic
-- .
STOREROOM STOCK NOS.*
07-23-^99
57-06-3196 Vc
57-06-3197 R.PL
57-58-7166 A/C. 12-72-5911 /Jc.
12-72-5925 VC
l2-72-535' T>*S
16-05-2646 fZPL
16-05-2551 IZ.PL 16-25-0016 vc
88-32-1345 IZ.PL
57-06-3224 Vc
-60-03-mfr ?>AS.
87-09-1030 fZ.PL
87-09-1050 fZ.PL
87-09-1400 Vc
87-13-2672 Vc
87-13-2590 Vc
87-13-2841 Vc
87-13-3255 Vc
87-13-7270 Vc
87-86-2148 Vc
87-86-2152 Vc
87-86-2385 VC
87-862450 fZ.PL
* 87-13-2837 VC
' 87-13-8700 VC
87-78-1350 VC
78-86-6176 VC
87-57-2560 VC 6O-0/.-7354 zv*.
60-xx-0024 Za & ///Ai?rex.
16-05-0675 Vc
. 16-05-0640 V*-
16-05-0625 Vc
16-05-0595 Vc
16-05-7785 VC
* 16-05-7810 vc
16-05-7816 16-05-7765 16-05-7766 16-05-7767
Vc Vc Vc A/C.
16-05-7768 Vc
003909
PRODUCT `Gasket, Flextaulic
Gasket, sheet
APPENDIX III SHERWIN ALUMINA PLANT STOREROOM ASBESTOS PRODUCTS
STOREROOM STOCK NOS.*
16-05-7769 Vc
16-05-7770 yVC
16-05-7772
16-05-7782 //<-
16-05-7783 tfu 16-05-7705 Vc
16-10-0200
16-10-0275 R.PL
16-10-0410 JL PC 46-10-0924" X>/s,
16' 10' 0-565 T>iS`
16-10-5055- 01516-10-0600' D/5.
-*6--10-1000 T>ty
D'S-
46-40-2-830 t>s-
46-40-4330- 6*5
i/:._1_CL_
D/S
--TO"
t>tS
46-40-4204 Dt$
46-40-6767 OiS
-16-10-0990 &S
* 4.-6-10-3020 OtS
** 4^-10-5507- D/s
' -46-10*4515 6/S
*46-10-2630 D/5
. ^46-10-2615 5/5 . 46-10-2-56a D/S
-16--15-5625 6/5
46-40-4140. 6/S
46-10-4522 46--30--0560 46-40-2-522
D/S
D/S D/S
, 46-10-2200 D/S
*6--15-2545 D/5
46-1-0-2225 DO
16--10-2400 DO
* 46-40-2425 D/S
16-40-244-5 6/s 46--*0--2240 D/S
46-10-25-25 D/S
46--10--3620 DO
16-10-2005 D/S 16-40-4-140 6/S
003910
PRODUCT f :Cteaket, sheet
Woven tape Gasket, Flextaulic
APPENDIX III SHEKWIN ALUMINA PLANT STOREROOM ASBESTOS PRODUCTS
STOREROOM STOCK NOS.*
-46-4G-2005-
46-10-2087 bts
46-40-0T95 D/5
. 46-16-2165 1>i} 16-10-0595 TCf>U.
46-10-4150
46-40-4075
46-4~2660 D/*
1C-10"0775 ZV5
4WO-2T72 Z>t%
16-10-2956 T>t$
t>/s
16-10-4070 16-05-7720 VC
16-05-7760 VC
16-05-7761 16-05-7762 16-05-7763
VC Vc Vc
16-05-7764 Vc 16-05-7551 /Vc
16-05-7552 Vc 16-05-7580 Vc 16-05-7592 Vc 16-05-7620 Vc / *16-05-7635 VC > 16-05-7645 Vc 16-05-7671 Vc 16-05-7696 Vc
16-05-7520 16-05-7530 16-05-7500 16-05-7460 16-05-7470 16-05-7549 16-05-7835 16-05-7360 16-05-7310 16-05-7370 16-05-7426 16-05-7420 16-05-7400 16-05-7449 16-05-7827
VC Vc VC vc
VC vc
VC vc VC
VC Vc vc Vc Vc VC
16-05-7820 Vc
46-05-7'W- CVS
16^05-1345 Vc
003911
PRODUCT Gasket, sheet
Woven gasket
*
APPENDIX III SHEKWIN ALUMINA PLANT STOREROOM ASBESTOS PRODUCTS
STOREROOM STOCK Nn<;
46-05--25^0 T>>S
16-05-2940 fc-PL 16-05-2695 fc-PL
16-05-2250 fc-PL
16-05-2810 ft Pt-
16-05-2830 fc.Pl. 16-05-2890 ft-PL
16-05-2895 fZPL
16-05-2930 fc.PL 16-05-3850 fc.PL
16-05-2947 fc.PL
16-05-3660 16-05-2950 16-05-2105
fc-PL fS.PL fc-PL
16-05-2040 16-05-2050 16-05-2015 16-05-2000 16-05-1900 16-05-1812
fc.PL fZ.PL fZ.PL ft-PL fZ.PL
MC-
16-05-1837 fcPL
16-05-1870 16-05-2810 16-05-2890
jz.pl rz-pL JZ.PL
16-05-1525 fc-PL
16-05-1550 fc.PL
16-05-1675 16-05-1560 16-05-1660 16-05-1700 16-05-1750 16-05-1375 16-05-1370
fc-PL fc-PL fc-PL fc-PL fc-PL fc-PL fc-PL D'S
i Aory. t>/5
16-05-1490 16-05-1300 16-05-1275 16-05-1185 16-05-1170 86-18-3962
fc-PL fc-PL fcPL ft-PL fc-PL f>L/* STSC-
16-05-3000 16-05-3030
fcfcL //c
003912
APPENDIX III EHERWIN ALUMINA PLANT STOREROOM ASBESTOS PRODUCTS
PRODUCT Packing
Chesterton Style 64 Hercules Style 159 Chesterton Style 326 * Woven gasket Gasket, Flextaulic
> Metal jacketed asbestos
Gasket, Tadpole woven asbestos Gasket, Flextaulic Friction disc Gasket, sheet Gasket, flat woven asbestos Transite cover Arc chutes
Base -- Allen Bradley
'
STOREROOM STOCK NOS < *
16-25-0306 16-25-3420 16-25-2192 16-25-5300
/t-PL ft. PL fi.PL JtPC
- 7ZPL
jt.pi..
16-25-4780 //c
-00-32-722088-32-1350 88-54-1375 88-54-1377
D/s
f/C-
AC Ac.
88-54-1381 tit.
48-10-1015 J*/C 48-12-1010 At. 52-63-2675 /VC 52-80-1605 Vc ` 52-33-7805
52-33-7607
51-80-4620 51-80-4660 VC
. 51-03-2000 /VC* 51-03-2010 /VC
*Note: This list is not nil inclusive, but only indicates those items noted in the storeroom to contain asbestos.
003913
PLANT
LOCATION C.VISION
IHERWIN-
Surveyed by Ronald e. benton &
DATE
ROBERT C. BURTON
11-7-R1_______________
SAMPLE 0 is 2S
*
3S 4S
5S t
4
6S
7S
8S 9S 10S ns \/*
SAMPLE
Storeroom' Storeroom Storeroom
ASBESTOS SURVEY
APPLICATION
gasket material for 3920 *overhcad pipe insui. - ad shipping/receiving dock Comp, sheet gasKets, overhead pipe insui., glass sight gasKets, coil belt gasket, rope, brake lining, woven gasket6, asb. tape
Paint Shop Office
ceiling tile
Outside Carpenter Sh >p Pipe insulation
Carpenter Shop
Overhead pipe insulation
Machine Shop
Gasket material, white
Machine Shop
*Adj.to Elec.Shop.
Overhead pipe insulation gaskets, sheet gasket material, 3* tape, blanket tbehino cod iorge>, packm arc chutes & asb. paper sleeves on steel pipe*insu small oven in eating area has asb. paper a sheet gasket
Bulk Storage Bulk Storage
Pipe insulation Pipe insulation, asb. tor paper
Power House
Insui. 8 & 9 boilers (old)
Power House Area
boiler insulation &
$8 h 9
pipe insulation
Power House Atmosp. Blowdown Ver ^cl Vessel insulation
Pipe insulation
Power House
tfll boiler
Power House C6 Generator
Bulk insulation.
if 6 Generator Power House Power House Bldg. Ill, Ccncrat'oi
Outer coating Pipe and duct insulation
Power House Bldg. Ill, Generator Pipe insulation
Power House
compressor alter cooler
Bldg. Ill, Ccncrntoi nir lines - insui..air in
"Xh'ir^TLprrt:i'-t*nHnir--=--(mnrr
ANALYTICAL
NO YES YES YES YES NO NO YES YES YES YES YES YES YES NO YES YES YES <1% YES . YES -NO YES YES
YES
-_
/Jc//<c Vc~ Vc -- //CVc Z>SS VC 2VS T>JS \/
Vc JZPl He. He K IL He
fZ
'' * *_ PLANT , LOCATION
XVISION
CAMPLE g
12S 13S I4S 15S
16S 17S 18S 1$S [
20S 21S 22S 23S 24S 25S 26S 27S 28S 29S 30S
SHERWIN
SURVEYED BY RONALD E. BENTnu t i ROBERT G. BURTON "
DATE 11-7-83
CAMPLE ' LOCATION Power Rouse Laboratory
ASBESTOS SURVEY
- ___________ APPLICATIONRESULTS
oven-asb. door 6eals, pipe insul. drum & sample storage
Power House - Vo Generator 50 Steam nine Bulk Insulation
Air Filter - 5 Generator Closed Heater Area
E. Condensate Tank
Bulk Insulation
Bulk Pipe Insulation I
Bulk Insulation
Storage Tank for Asb
3rd Level . #850 Steam Line
Bulk insul. Pipe insul.
#600 Steam Line 2nd Level Facility 22
Facility 22 (old)
Pipe insul.
Outer paper insul. (pipe) Pipe & bulk insulation
ANALYTICAL
YES
yes
Mc_
YES rz
YES Z. *
.YES //C
NO Vc MO //c YES //c.
YES //C
<1% YES
rt<L
Facility 22 ESP Facility 24
Intake ductwork insul.
Pipe insulation
V
Facility 22 (old) Facility 22 (old)
Facility 22 (old) Facility 22 (old) . Facility 22 (old) #3 SOP .
Pipe insul. (email) Fresh air makeup Vessel insulation(2nd flco: ) Coating on aiding pan shape - Kiln floor
Vessel insul,-block(see 21 s) ' Old ESP INSUL. icar outers mineral vook behind Vessel insul. similar to old 24 Facility(sce 21S)
#1 SOP
Vessel inoul - old
#32 Area, Starch Sto age Vessel insul. -powder
v3 Unit Washer overflow
#1-7 flach'tub
piping insul. mineral wool inner inoul. materia 1
Liquor to #2 heater
vulvc dock piping insul.
block oliccLi; ; paper
outer
YES //C YES /V<L. YES A/CYES /VC YES MC YES //C
>' 0
o
YES VC
YES
HO YES
VC
NO YES
^ a/c*
YES
003915
plant LOCATION
division
SAMPLE <? >
31S 32S . 33S 34S 35S 36S 37S 38S 39S 40S "1 41S 42S 43S 44S ASS 46S 47S 48S
c
"V
49 S SOS
.SHERWIN
SURVEYED BY
DATE
RONALD E. BENTON
ROBERT G. BURTON--
11-7-84
CAMPLE LOCATION
#9 horiz! htr.
ASBESTOS SURVEY APPLICATION
Bulk Insul,
#9 horizon, hrt.
scrap on floor
#2 Settler
Bulk Insul.
#2 Washer #2 Wash Water Tank '
Bulk Insul. Bulk Insul. bottom area
#3 Diluter
Bulk Insul. (new)
#2 Biluter
Bulk Insul. (old)
Lime aj>ins tank \
#2 Filter feed tank
Cement like matl-5yrs.old Bulk Material & cement
Filter wash tank
Bulk Insul.
#1 Clear Filtrate Ta ik Bulk Insul.
Kellev Press filter press Vacuum pot lime
Cement Material Inner Material
GB Press
Cement & Inner (see 39)
# Vessel -- end dijes :ors Inner Material
#3 ESP Topside Area 42 Tall V. Tank Area 42 hopper tvpc tank Area 42 (Evap.)
Area 42
Area 42
Aren 42
Area 42
Bectel Whso.
Inner material-rest same
Cement Material
Cement Material
$rd. level piping insul. rnsui. in bottom ol vessel blown on outer inoul. (.asphalt typcJ, hopper taitblown on outer material, j top cap seal lor tali unii > aob. woven pasket, pipe insul.. topside
Pipe insul - bulk .
Beetcl Whnc.
Bulk sheet mterial
ANALYTICAL RESULTS
YES YES YES YES NO
tic TZf^ \/ tic tic tic
YES
tic
YES
NC
NO tic
YES
tic
YES
tic
YES
tic
NO tic
NO" tic
NO tic
NO YES
tic tic
YES NO
.tic tic
YES
tic
YES
tic
YES
tic
YES
ti<-
YES NO tic
003916
. -fLAirr tOCATXON ( DIVISION
`
sherwin
SURVEYED BY RON ALP E, BENTON $ ~~ HOBEKT G. BURTON
DATE H-7-84
SAMPLE fl SIS *
ASBESTOS SURVEY
SAMPLE LOCATION__________
APPLICATIONRESULTS
Heat Exch.
Liquor line - old cal. silldate
- - ng___________ 2
________ J52S____________ Kiln discharpp.
.Bulk Insul,
#1 small dia nine to slide \ inner material
* ?**<; 54S
-
(
KSP_J!_S 2....
Cement Material
ESP 1 & 2
Blown asphalt
UBepcsttaalirswasretonroaugsee *
Bulk pipe lagging, partial roll gasket materic 1
T,pvp1________________ Old brake shoe assblv,
Fac. 45 (Garage)
Piece 3" asb. tape, brake 6ht>e iii>j>blyt-, lull 3. a*L , tape, piece sheet gasket "ErmriJil tfiruuik-iop"~----"
Fac. 45 service area Overhead pipe insul.
Kiln Discharge
Air elide asb. cloth
it it tt it ii ii
gaskets, small diameter nine in middle asb. t>at>er insul. Topside ESP ductvori has ash. pnsket material ESP blown on asphalt insul
"Yellow" 1U Wile oil muffle Laboratory - Back La - fee.
it ti ii Transite fronts muffle fee
it it n 4 hoods in back area
it
it it Also transite inner liner
Lab-Men's Room Lab-ndj. .to AA Room
u tt tt tt tt
Overhead pipe insul. Asb. sleeves on clntnpG also old scrap material
(?l Lob
Sleeve material in bottom
ANALYTICAL
yes
YES YES YES YES NO YES
Vc
/Jc VC Vc.
Vc
Vc
YES YES YES
7Z-MV VC
YES YES
/Lt*W RM Vc
YES YES YES
Vc
YES
Vc
YES
yes
YES
Vc VC
YES YES
Vc VC
YES
YES //m/
YES
7
UUo~9T7
' ' -'mar
`
LOCATION DIVISION
SAMPLE 0 . *1
.
/ *
.
(
skerwin
_____
CURVETED BY
DATE
RONALD E. BENTON &
ROBERT G. BURTON
11-7-83
. ASBESTOS SURVEY
SAMPLE
LOCATION
Power House
intake diesel engine -
Bldg. Ill* Generator insulation
Power House
Inlet/outlet piping, air
#5 Air Comp. Bldg.
comp, insul.
Power House
Reducing Stn. Area
600 lb. steam line
manifold, piping insulatiot
Power House
Closed Heater
'
Power House
Boiler Fuel Water
Power House
Steam Turbine housin
Power House
Aerator Inks
'Power House
Day Tank
Heater for fuel oil
Pipe Insulation Bulk Insulation Bulk insul., pipe insul. Bulk Insulation Pipe and Bulk Insulation
Power House Condensate Filters Power House Flash Tank Power House Exchanger-blowdown heat Condensate pumps Power House #10 Boiler Power House #5 & 6 Boiler Power House 2nd Level Power House #4 & 3 Boiler Power House #4 4 3 Boiler Power House #142 Boiler Power house 850 lb. eteamline Power House 300 lb. heater line Power House #4 Generator Power House 04 Generator
Laboratory
Pipe Insulation
Bulk Insulation Pipe Insulation
V.
Pipe Insulation Inlet/outlet bulk insul., gasket Bulk insul. and pipe insul.
r Bulk insul. and" pipe insul
Piping & bulk (#3) Old asb. tape alongside heater
Pipe Insulation
Pipe Insulation
Pipe Insulation asb. padding material (2nd level) old pipe insulation (1st levc1)
Old Precision Scientific
ANALYTICAL
YES
VC V(L
YES
s/c
YES
yC
YES
VC
* YES
A'C
YES
//c.
YES
fj(_
YES
Vc
YES YES
Vc yc
YES
//c
YES
y/c.
YES YES
Vc //C
YES
` b/C.
YES
/JC
YES
y<L
YES
febW
YES
//<!
YES
tfc
YES
A/C
YES
R
YES YES
//<p
003918
' ' * gjjKT
' SHERWIN
LOCATION______________________ C ^VISION_______________________
04
SURVEYED BY RONALD E. BENTnu a
ROBERT C. BURTON
DATE 11-7-83
SAMPLE II
{
SAMPLE LOCATION
ASBESTOS SURVEY
* _______________ APPLICATIONRESULTS
ANALYTICAL
$8 Lab i
it it
#9 Lab n it
ii n
it it
it ii > #10 Lab n ii
ti tt
Upstairs Lab Stor. Zinc Calcium Room
it it ti
n ii n '
Drawer & below sink,
Hood transite liner, transite exhaust ducts,
Sleeves in drawer under muttie tee. transite front & back muffle fee., induction htr. under hood '.as transite, transite hood li Ur, transite exnaust ducts, sleeves in long drawer below 6ink, Precision bcie ice over door seals
Transite front & back muiile xce. nooo exnaust duct transite, gloves under nood, transite lined oven
Piece sheet gasket material, pipe msui. asb. tape, TC wire, roll asb. paper
YES YES
V ^
** YES
YES YES
hJe jj(;
. IZPL jjc ^
YES . ,/C
YES YES
y/C
S/C. <2;o*ei -fZpL.
YES
VC
YES
YES
YES
[Zj^\V
Millwright Shop
Lab #5 it
ii
ti ii Lab 'next ToTS (Bomb Lab)
Gaskets - precut rings Sleeves "in small drawer, glove, transite in Hevi Uuty 6 usun uvens, aso. paper on hot plate, also m douDl'c^drTIt'ere underneath, hood transite lined
Transite lined hood
YES ,,
YES
YES
YES
YES
KPL. N<~C--LAves- ItPL
.A'c-
//c
*
Electrical Trailer
Roll TC wire
YES
/S<-
Fabrication Shop
Welding curtain, several pieces snect g.!>KeL material, gaskets.
- YES YES
fZ f*L JZ f^L
('
Instrument Shop
Sheet gasket material
YES
JZ PL
Instrument Storage
Flexatudic gasket, TC wire,
--i;ueet
min -
003919 -
YES VES
JZPL JLPL
* NOTE: Itcrao without numbers were identified cc. containing nabestoc during. the r.urvey.
PLANT gHERWIN LOCATION____________________ (. iVISIOH_____________________ .
SURVEYED BY
DATE
_R0NALD E< BENT0N &
ROBERT G. BURTON
11-7-84
ASBESTOS SURVEY
BAMPLE
*
ANALYTICAL
6AKPT.E ft_________ LOCATION
_______________ APPLICATIONRESULTS
Maintenance Shop
Cut 4 uncut sneet gaskets,
(30 Area)
packing, sight glass gasket
TCS
iLP,
Pipe filters ii it
cut ring sheet gaskets
VES
yj.Pi
-
it ' ii it 30 Area Digestion .
pipe insul. between 30 Ares maint. 4 control^oom
Lime day tank-bulk insul.
30 Area
Cleaning vessel insul. caustic storage bulk insul
YES YES . 'YES YES
^pL ^
Vc
Area 30 - Vertical Old insul. asb. around
Heaters )
""here". 6 liasn tanks flash tops (4) on horiz.
heaters oiu insui. approx. it it 14 settlers have old
YES YES YES
//C
//<y<_
(
bulk asb. insul. oia wasne tt it insul., pipe in&ul., con- TfES
densate tank, oia wasner
it it overflow tank insul.
YES
diiuter insul.
tt it
V
- YES
Vd-
Filtration
..
Area 35 - red mud
patches or old insul. on several filter fuel tanks, caustic wash tank bulk msi,11. caustic htr. tank insul..
.
YES YES
y/c
Area 35
Pipe and vessel insul., vi 4 l clear
YES
yc
Filtrate tank insul., outc -
yes
ii ii
paper insul., Kelley press
4 AB presses, paper around
YES
^
i> ii heater valve between 2. sto -age
tanks
YES
yc
Area 45 (PPcT) it u
it ii
Pipe insul. grd. level
S. end digectorn; steam line insul., topside
yes
YES YES
vc tft-.
45 - 1A
.
Stornee Cabinet out side
Tacking
YES
JLPL
Kiln Floor Fnc . 40
Water pape gasket, hot nir olidc gasket material
YES
Vl-4 LSI' blown on maul.,
Fnc. 40 F.ST
duckvork inoul. (paper)
YES
tJ*-
003920
' PLANT `
SPKm.nN
. LOCATION
_____________
WISION_____________________
SURVEYED BY_RONALD E. BENTON &
'ROBERT G. BURTON
' DATE 11-7-83
ASBESTOS SURVEY
SAMPLE 0LOCATION
CAMPLE
*
_______________________________ APPLICATIONRESULTS
1 Fac. AO ESP
# 3 & 4 ESP; topside -- limpet material
ii ii n
round ductwork insul. fan housing insul.,
ii n it
8 & 9 ESP hopper insul. (paper) and vessel insul.
n n it
(paper)
(Fac. 45, 50, 51) Small Maint. Shed
Roll 3: tape, gasket mater: al
ANALYTICAL
YES YES YES YES YES
Vc ^ //C //C" R.PL
Area 45
Small vertical tank & hor.
* YES
//A-
.unit (adjacent to it)
bulk insul. material
YES
Vc_
)
.( * * ,
NOTE: Items without numbers were identified as containing asb istos during the survey. 4
(
. *
003921
Sherwin
PLANT NAME
ENGINHEERING ESTIMATING SHEET FOR REHOVAL/REPLACCHENT OR REPAIR OF AS8ESTOS CONTAINING INSULATING MATERIAL
OAT
2^19-87
PREPARED BY: C. Smith
|ITEMI TYPE | P' REPAIR J YEAR WORK | QUAHITITY {THICKNESS
j NO*{INSULATION[ K- REMOVE {TO BE
|
{ INCHES
| ) SEE NOTE | R- REHCVEA {PERFORMED }L*LIMEAL FT(
j j BELOW j
REPLACE 1 -
{ S-SQ FT j
PIPE UNIT COST | ITEM COST { DJA.
1 1
IOCATIOH/CCHMEHTS
1 1
lI
ii P
1
i164 S | lk
- | 21.00
3,444 26-T:10 #5 Feed Tank |
1i
ii P
1
1i
ii P
1
1i 1i
iI i* i
P P
1 I
1 i .i i P
1
1\
i i -P , !
1 25 S 1 lh 1 565 S 1 lk 1 660 S 1 lk 1 540 S I lk 1259 S 1 lk 1 244 S 1 wc
- I 21.00 - !' 21.00
5'25 i 26-T-ll U Feed Tank l 11,865 26-T-12 ITS Feed Tank I
- 1 21.00 13,860 26-T-23 n Feed Tank 1
- I 21.00 11,340 26-T-14 #1 Feed Tank [
- 1 21.00 1 5,439 26-T-l .86 Desilicator {
- 1 6.80
1,659 26-T-l #6 'Desilicator {
1i 1*
ii ii
P p
1 *
* 140 S 11035 S
I- lk 1 VIC
- I 21.00 - 1 6.80
2,940 7,038
26-T-2 #3 Desilicator I 26-T-2 #3 Desilicator |
1i
iI P
1
IL000 S 1 lk
1 21.00 21,000 26-T-3 7 Desilicator |
1i
1 ! `p
1
1 45 S 1 v/c
- 1 6.80
306 26-T-3 87 Desilicator [
1i
1i P
1
1 300 S 1 lk
- i 21.00 i 6,300 1 26-T-4 #5 Desilicator {
Vi i1 i ii i
11 i' i' ii ii
P1
P *- 1 P1 PI Pl
! 100 S | WC
- 1 6.80 v 680 26-T-4 #5 Desilicator J
1 300 S 1 1 200 S 1 1 50 S 1 *1000 S 1
lk WC f lk 1 WC \
1 21.00
6,300 26-T-5 #4 Desilicator 1
1 6.80 i 1,360 } 26-T-5 #4 Desilicator 1
I 21.00 i 1,050 1 26-T-6 82 Desilicator *
. 1 6.80 i 6,800 1 26-T-6 82 Desilicatort
i. ,.i i P 1
* 151 S * lk
NOTE: TYPES INSULATION < INSERT NUMBER ONLY IN TABLE )
NUMBER \ TANK A VESSEL INSULATION HETAL JACKETED 2 TANK A VESSEL INSULATION WEATHER COATING 3 PIPE INSULATION OUTSIDE WITH METAW PROTECTIVE JACKET A PIPE INSULATION OUTSIDE WITH. WEATHER PROTECTION 5 PIPE INSULATION INSitfC BUILDING
1 - 1 21.00 i 3,171 1 26-T-7 #1 Desilicator! TOTAL PLANT COST $ 105,077
NUMBER
6 DUCT INSULATION HETAL JACKET
7 DUCT INSULATION WEATHER COATING
6 FURNACE INSULATION EXTERIOR OF STEEL
9 FURNACE INSULATION INSIDE FURNACE
TO BOILER JACKET INSULATION
003922
Sherwin
PLANT NAME
-
ENGINNEERING ESTIMATING SHEET FOR REKOVAL/REPLACEHEHT OR REPAIR Of ASBESTOS CONTAINING INSULATING MATERIAL
DATE 2-19^87 PREPARED BY: Gi Smith
jlTEHj TYPE j P- REPAIR | YEAR WORK | QUANITITY [ thickness} PIPE 1 UNIT COST
j NO.|INSULATION j K- REMOVE [TO BE
1
1 INCHES ( DIA. !
j J SEE NOTE | R- REMOVES .{PERFORMED [L-LINEAL FT[
1 | BELOW | REPLACE 1
j S*SQ FT |
1 i
ITEM COST j
1 l 1
LOCATION/COMMENTS
1
1 l !
l|
21 R
1
1 1330 S 1 2
1 21, GO.
27,9301 PH. -v Deareator Tank I
11
2I R
1
! 820 S I 2
- I 21.00
17,2201 PH ~ 2)
Deareator 1
11
2 1 P'
I
1 10 S l 2
1 21.00
2101 PH - Condensate Filter^
1I
2I p
i
1 10'S | 2
- I 21,00
210 [ PK-* Flash Tank
|
11
21 p
1 1 4 1 p
1 1
1 *-.10 S 1
1 10 s i
2 2
1 21.OQ 1 21,00
210! PH - Exchanger Blowdowt. 210! PH - Condensate Pump !
1I 11 11 i1 I1 11
1
4 1 p 41 p 41 p 41 p
1 'R ^1 R
1
1 1 1 l 1 1 I
I 300 L 1 1 200 L 1 I 800 L 1 1 100 L * i 6*
4 3 WC 3
I 8*
11
1 12.60 1 12.60 I 1 7.80
3,780* PH - 850 lb Steam Line* 2,520* PH 300 lb Steam Line* 6,240* PH - iiisc Pipelines *
i 12.60
1,260* PH - 600 lb Steam Line!
*4000.00 . 24,000* Lab truffle Furnaces *
%
*9000.00 r
Lab Hoods Exhaust Dub
ooo
<Vl
1I
II
1 *. 1
1
1!
11 I 1.
1 1
1 1
1 !1
I 1!
I !
\1 1. i
1 1
1 1
I
MOTE: TYPES INSULATION ( INSERT HUMBER ONLY IN TABLE )
WH9ER t TANK l VESSEL INSULATION HETAl JACKETED Z TANK l VESSEL INSULATION WEATHER COATING 5 PIPE INSULATION OUTSIDE WITH HETAL PROTECTIVE JACKET 4 PIPE INSULATION * OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULATION iNSiOE BUILDING
1 '
1
1 1
TOTAL PLANT COST $ 155,790
NUMBER
6 DUCT INSULATION METAL JACKET
7 DUCT IHSULATION WEATHER COATING
8 FURNACE INSULATION EXTCRIOP Of STEEL 9 FURNACE INSULATION INSIDE FURNACE TO BOILER JACKET INSULATION
003923
1 !
Sherwin
PLANT HAKE
ENGINEERING ESTIMATING SHEET FOR
REMOVAL/REPLACEHEHT OR REPAIR OF ASBESTOS
CONTAINING INSULATING MATERIAL
DATE
2-19-87
PREPARED BY: G. Smith
|ITEM] TYPE j P- REPAIR J YEAR WORK | QUANTTHY |THICKNESS| PIPE | UNIT COST | ITEM COST J
LOCATIOM/COMHENTS
| HO. JINSULATIOH j H- REMOVE |TO BE
1 i SEE NOTE j R- REMOVES (PERFORMED
1
i BELOW j
REPLACE 1 *.
ess:
71 2 1 R
1
J | INCHES
|l LINEAL FTj 1 S-SQ FT j
j DIA. (
1 .1
1 5500 S 1 2"
.1
21.00
j|
1I 11
* 115,000 I 24-T-22 #3 Slurry Tank!
1i 1i
2 1R 7JP
I 1
I 1965 S i T' \ 200 S 1 2"
- I 21.00 i 41,265 225-T-l #1 SOP Tank - I 21.00 1 4,200 i PH - #1 Boiler
| ]
1i
71P
i
1 200 S 1 2"
- 1 21.00 | 4,200 | PH - #2 Boiler
|
Ii 1i 1i
7*P 71 P 7 i p ,
1 1 1
1 150 S 1 2" 1 150 S 1 2" i ' 200 S 1 2"
- I 21.00 1 - 1 21.00 I - 1 21.00 i
3,150 1 PH - #3 Boiler 3,1501 PH - #4 Boiler 4,200| PH - #8 Boiler
( ( |
1i
7* p
!
1 200 S I 2"
- ! 21.00 I 4,200l PH - #9 Boiler
1
Ii t 1i
1i
1i
71 p 2. 1 p 7 1 `p 71 p
I 1 I (
I 300 S 1 1 10 S * I 20 S * 1 , 20 S*
2" 2" 4" 2"
- 1 21.00 * 6,300* PH - #10 Boiler
1
. I 21.00 1
210* PH - Blowdown Vessel 1
- 1 21.00 I
4201 PH - Generators
1
- 1 21.00 r
.42d( PH - Closed Heaters I
ii
1i
71 2i
p
p
1 1
1 30 Si WC
- ! 6.80 1 ' 2041 PH - #5 Mr Compressor!
I 50 Si 2" 1 - 1 21.00 I l,050l PH Boiler Fuel Oil Htd
1i 1 .('
2i i
?
1 1
I so si 2" 1 - 1 21.00 I 1,050] PH - Day Tank 1 I 11 I 1
1
Ii
I *1
(
ill
i i
i
NOTE: TYPES INSULATION < INSERT NUMBER ONLY IN TABLE )
NUMBER
\ TARN VESSEL INSULATIOH METAL JACKETCO 2 TANK & VESSEL INSULATION weather coating
3 PIPE INSULATION - CUTS1DE WITH METAL PROTECTIVE JACKET
A PIPE INSULATION CUTSIDE WITH WEATHER PROTECTION
5 PIPE INSULATION IWSiDC BUILDING
OTAl PLANT COST $1S9 .019
HUMBER
6 DUCT INSULATION METAL JACKET
7 DUCT INSULATION WEATHER COATING
8 FURNACE INSULATION EXTERIOR OF STEEL
9 FURNACE INSULATION INSIDE FURNACE
10 BOllCR JACKET INSULATIOH
003924
Sherwin
PLANT NAME
EHGINHEERING ESTIMATING SHEET FOR REMOVAL/REPLACEHENT OR REPAIR OF ASBESTOS CONTAINING INSULATING HATERIAL
DATE
2-19-87
PREPARED BY:
Smith
JlTEKl TYPE | P- REPAIR J YEAR WORK 1 OUANITITY j tkickness] PIPE
1 <M HSULATION| H- REMOVE (TO 8E
1
inches
DIA.
1 i SEE NOTE | R* REMOVES (PERFORMED | .LINEAL FT j
1 I BELOW | REPLACE I
I S-SQ FT 1
UNIT COST J ITEM COST |
11 II I1
LOCATION/COMHENTS
{
1 1
11
li P
1
I 100 s 1 WC
- 6.80 1 680.OQ 26-T-7 #1 Desilicator (
11 11
ii 11
P P
1 I
1 1250 S 1 lk 1 2150 S I WC
21.00 - f 6.80
126,250.oq 30-1-1 thru 10 Heaters| 114,620.oq #1 Dig. Vert Heaters (
1I II t1 I1 I(
11
11 tf ff
1 i(
ii i *i ii
i' i' ii iI iI 1*
i1
P P P
P,
P P
R
i
1
1
I
(
1 1
i I 'P
1
iI
Vj.
i
iI
P
1
11 P
1
11 P
1
11 11
P1 P '* 1
4152 s 1 3 1 *555 s 1 WC
1 942 S 1 WC 1 141 S I 2
* 71 s * WC
I 998 s 1
1 2150 s i
1%
WC
1 25 s 1 WC
f 967 s 1 lk
562 s 1 374 s 1
2h 3
302 S ! WC
180 S 1 WC
40 s i Ik
- 21.50 *89,268.Od #1 Unit Digesters
1
- 6 .'80 1 3,774.0d 1-1 Flash Tank
!
- 6.80 1 6,406.0(1 2-6 Flash Tank
!
- 1 21.00 1 2,961.Od 2-9 Flash Tank
1
- 6.80 i 484.Od 2-10 Flash Tank
i
- 21.00 120,950.011 30-2-1 thru 10 Heaters!
- I 6.80 114,620.0m ft 2 Dig. Vert Heaters f
- i 6.80 I . 170.om Fac 30 Flash Separator^
- 21.00 120,307. Of) 30-3-1 thru 10 Heaters)
- 21.00 111,802.00 ft 3 Dig Vert Heaters |
- 21.50 | 8,041.OP ft 3 Unit Digesters
|
- 6.80 1 2,054.Op ft3 Unit Digesters
[
- 6~80 f 1,224.Op It5 Unit Flash Tanks j
- 21.00 |. 840.Op Its Unit Flash Tanks |
i. i
11
P
I
269 S 1 lk
- 21.00 l 5,649. CIO 30-4-1 thru 10 Hcatcri
NOTE: TYPES INSULATION < INSERT NUMBER ONLY IN TABLE )
NUMBER 1 TANK 4 VESSEL INSULATION HETAL JACKETED
Z TANK A VESSEL INSULATION WEATHER COATING
5 PIPE INSULATION * OUTSIOE WITH METAL PROTECTIVE JACKET
A PIPE INSULATION CUTSIDE WITH WEATHER PROTECT!) 'N
5 P1PC INSULATION INSUE BUILDING
TOTAL PLANT COST $230,100
NUMBER 6 DUCT INSULATION METAL JACKET 7 DUCT INSULATION WEATHER COATING 6 FURNACE INSULATION EXTERIOR OF STEEL 9 FURNACE INSULATION INSIDE FURNACE TO BOILER JACKET INSULATION
003925
Sherwin PLANT HAKE
ENGINEERING ESTIMATING SHEET FOR REKOVAL/REPLACEHEHT OR REPAIR Of ASBESTOS CONTAINING INSULATING MATERIAL
DATE
2-19-87
PREPARED BY: G. B. Smith
flTEKl TYPE | P- REPAIR J YEAR WORK | GUANITITY J tkickness[ PIPE | UNIT COST | ITEK COST |
1 o.| NSULATIOHj H* REMOVE 1 TO BE
1
i INCHES { DIA. j
1
1
1 1 SEE NOTE 1 R* REMOVES, {PERFORMED JL-UNEAL FTj
1i
1
1
i l BELOW |
REPLACE 1
| S-SQ FT |
11
1
t
LOCATION/COMMENTS
!
i
ii i /1
21 21
P P
1 1
1 187 S 1 1 51 S 1
2h I _ i 21.50 * 4,021.0(1 #4 Dig Vertical Heatel 2 I - I 21.00 1 l,071.0d #3 Dig Vanor Separatol
ll
2 I P'
1
1 - 44 S 1 2 1 - 1 21.00 1 . 924.0(i #4 Dig Vapor Separatol
lt
21 P
1
1 670 S I 1U 1 - 1 21.00 114,070.0(1 #5 Die Unit Heaters 1
Il
2I P
l l 2 I P
1 i
1 '179 S 1 i 277 S 1
lh I WC 1
- 1 21.00 1 3,759.0(1 #5 Unit Flash Tanks ! - 1 21.00 I 5,817.0(> #5 Unit Flash Tanks i
ll ll
21 ii
P , R'
1 1
I '39 S 1 I4320 S 1
1% 1 - I 21.00 i 819.04 #5 Unit Flash Separati
13s ! - 1 24.00 103,680.04 #11 Washer
!
ll
1I R
1
1 7430 S 1 13s I - 1 24.00 174,320.04 #10 Washer
1
ii it
11 R 1 I *R
1 1
1 7430 S 1 1 7430 S 1
13s 1 lh 1
- 1 24.00 174,320.04 #9 Washer - ! 24.00 174,320.04 #8 Washer
_
( I
ll 1- i !1 1!
ii 21 11 21
R P R P
I 1 1 1
* 7430 S * 1 1728 S * 1 4147 S 1 I 1382 S i
lh 1 _ I 24.00 J74,320.db #7 Washer lh 1 - I 21.00 1 3*6,288. Ob #6 Washer lh 1 - 1 24.00 I 99,528.01) #5 Washer lh I - I 21.00 I 29,022.Qb #4 Washer
1 I 1 1
\l
21 P
l
t 372 S 1 lh 1 - 1 21.00 ! 7,S12.0t) #3 Washer
1
11
2I P
1
I 372 S 1 lh 1 - 1 21.00 1 7,812.00 #2 Washer
1
!. I
11 R
I
I 2592 S I lh
- | 21.00 1 54,432.OP #1 Washer
NOTE: TYPES INSULATION < INSERT NUMBER ONLY IN TABLE )
NUMBER \ TANK & VESSEL INSULATION METAL JACKETED 2 TANK t VESSEL INSULATION WEATHER COATING Z PIPE INSULATION * CUTS10C WITH METAL PROTECTIVE JACKET 4 PIPE IKSUtATION OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULATION INSiOE BUILDING
TOTAL PLANT COST $1,066,355
NUMBER 6 OUC7 INSULATION - METAL JACKET ' 7 DUCT INSULATION WEATHER COATING 8 FURNACE INSULATION EXTERIOR Of STEEL 9 FURNACE INSULATION INSIDE FURNACE
10 BOILER JACKET INSULATION
003926
!
Sherwin
PLANT NAME
ENGINEERING ESTIMATING SHEET FOR REHOVAL/REPLACEMEHT OR REPAIR OF AS8ESTOS CONTAINING INSULATING MATERIAL
DATE
2-19-87
PREPARED BY: G. B. Smith
JITEMJ TYPE | P- REPAIR | YEAR WORK ( QUANITITY (THICKHESS[ PIPE j UNIT COST ( ITEH COST j
j NO.|INSULATION( H- REMOVE (TO BE
1
! INCHES I DIA. 1
f
f
j j SEE NOTE j R* REMOVES (PERFORMED jL-LINEAL FTJ
11
1
1
j j BELOW | REPLACE 1
1 S-SQ FT |
11
I
1
location/comments
'111
l_ 1
x1
11
1
R R r'
1 1 1
1 7430 S 1 2" 1 - 1 24.00 1 178,3201 #12 Washer I 7430 S 1 2" I - 1 24.00 1 178,320 | #15 Washer I 2828 S 1 lk I - 1 24.00 1 67,8721 #1 Settler
11
|P
1
1 1200 S 1 lk 1 - I 21.00 1 25,2001 #2 Settler
It II.
1P 1R
1 I
I `- 943 S 1 lk 1 - 1 21.00 1 19,8031 #3 Settler
1 11885 S 1 lh 1 -
24.00 1 45,2401 #4 Settler
III
11
!
P, P
11
1P
III P
II
.1
III
i1
1
P P
1 1 1 I 1 1 1
1 1413 I lk 1 -
21.00 1 29,673i #6 Settler
200 I lk 1 -
21.00 1 4y200| #7 Settler
1 1493 1 lk
1662 , ' WC 600 . 1
mi""" 1131 1 lk
1.
..rl 1-
21.00 | 31,353| #9 Settler
6.80 . 11,302 21.00 1 12,600' #10 Settler "6780" ;****7,w21.00 1 .23,751' #11 Settler
1493 * 13S 1
21.00 1~ 31,353'! #12 Settler
1I
1 ' 1
1I
1
1
11
11
11
!
1
I 11 i ;
1 *1..
I
1 1 1 I1 1 1
1f
1
I 1 1 11 1 1
1. 1
1
1I 1
NOTE: TYPES INSULATION ( INSERT NUM8ER ONLY IN TABLE )
NUMBER 1 TANK 4 VESSEL INSULATION METAL JACKETED 2 TANK 4 VESSEL INSULATION WEATHER COATING 5 PIPE INSULATION CUTSIDE WITH METAL PROTECTIVE JACKET A PIPE INSULATION * OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULAT ION INSiOE BUILDING
11 1 1 TOTAL PLANT COST $666,678
WUM8ER
6 DUCT INSULATION METAL JACKET
7 DUCT INSULATION WEATHER COATING
C FURNACE INSULATION EXTERIOR Of' STEEL
9 FURNACE INSULATION INSIDE FURNACE
U BOILER JACKET INSULATION
003927
! ( ! 1 1 1 1 1
1 1 1 i 1
1 1 1
i
1 1
Sherwin
PLANT NAME
-
ENG5NNEERING ESTIMATING SHEET FOR REKOVAL/REPLACEHEHT OR REPAIR Of ASBESTOS CONTAINING INSULATING HATERIAL
DATE
2-19-87
sy.PREPARED
G. B. Smith
1 I | P- ( | (1 TEH TYPE
REPAIR | YEAR WORK j OUANITITY (THICKNESS) PIPE UNIT COST ITEH COST
j H- j j j j 1NO.|INSULATION[
REMOVE | TO BE
INCHES
DIA.
I
j j j j jSEE NOTE | R- REHOVE& (PERFORMED (L-UNEAL FT
1I
j j j I | I8ELOW
REPLACE
1 S-SQ FT
II
1
LOCATION/COMMEHTS
| 1 1 1
II Ml II II II
11 11
lI 21 21 21 21 21 21
R R P P P R R
1 1 1 1
1
1
1
1 1493 Si 1 286 Sl 1 93 S I 1 200 Sl
1 *- 50 Sl
1 500 Sl 1 '528 Sl
lh I
2 li lh I1 3" 1I 2h 11 lh 11 WC 1I
- 1 24.00 I 35,832 I #14 Settler
I
|1 21.00 I 6,006 | 33-E-9 Caustic Heater
- f 21.00 1 (1,953 1 #1 Washer O'Flow Tank
- 1 21.50 1 4,300 1 #3 Washer O'Flow Tank |
- 1 21.50 1 1,075 1 Washer O'Flow Premix TJa
- |I 21.00 I 10,500 Settler O'Flow Relay - |1 6.80 1 3,590 #1 Barometric Hot Wellj
II II II
11
11 <1 11 II
21
21
21
2'
2\
j1 !1
21
R1 R1 P1 P1 P1 R1
R * 1
P1 I
1 1037 S*
I 528 S*
1 270 S*
lh 11 _ 1 1 I21.00 21,777 #1 Wash Water Coll Tarlk
lh 11 - 1 21.00 1 11,088 i #2 Barometric Hot Well
lh 1i
:i
6.80 , 21.00 1
*5,216 .
5,670 #3 Wash Water Coll Tarlk
1 1S1 s1
1 .330 S1
lh 1! . 1 21.00 * . 3,171 * #3 Barometric Condenser lh 1 - I 21.00 * 6,510 1 #1 Filter Feed Tank 1
11 3142 Si lh
- I 24.00 1 *75,408 1 #2 Filter Feed Tank 1
* 3142 Si lb I - 1 24.00 1 75,408 1 #3 Filter Feed Tank 1
i 665 Si wc i
....2k...
. ^1
6.80 , 4,522 ...2,5?0k. #4 Filter Feed Tank
II
I
iI
Ii
NOTE: TYPES INSULATION ( INSERT HUMBER ONLY IH TABLE )
NUMBER 1 TANK A VESSEL INSULATION METAL JACKETED 2 TANK 4 VESSEL IKSULATION WEATHER COATING 3 PIPE INSULATION * CUTSIDE WITH METAL PROTECTIVE JACKET 4 PIPE INSULATION * CXJTSIOE WITH. WEATHER PROTECTION 5 PIPE INSULATION iKSiDC BUI ID INC
TOTAL PLANT COST $274.546
NUMBER
6 DUCT INSULATION METAL JACKET 7 OUCT INSULATION WEATHER COAT I KG
8 FURNACE IKSULATION EXTERIOR OF STEEL
9 FURNACE INSULATION INSIDE FURNACE
10 BOILER JACKET INSULATION
003928
Sherwin__________
PLANT NAME
.-
engineering estimating sheet for
REKOVAL/REPIACEHENT OR REPAIR Of AS8ESTOS CONTAINING INSULATING MATERIAL
oate
2-19-87
.^ PREPARED BY: G. B. Smith
|ITEM{ TYPE j P- REPAIR | YEAR WORK | QUANITITY jTHICKNESSj PIPE j UNIT COST J ITEM COST
j NO.{INSULATION] H- REMOVE |TO BE
j
| INCHES | DIA. |
j
j j SEE NOTE j R- REMOVES jPERfORMED jl-LINEAL FT{
jj
j
j j BELOW j REPLACE { .
] S-SQ FT j
jj
j
tOCATIOH/COMMENTS
I
II 1/1
2I 2I
P P
I 331 S 1 lh I - I 21.00 I 6,921
;"T60"s*""-*wc: * * '-*......... 5781r"T,tr8S'
1 40 s i lh_ I - I 21.00 I 840
itS Filter Feed Tank I Filter Caustic Wash Tah
1I
2 1 P*
*
1 628 S 1 lh 1 - 1 21.00 113,188 I #4 Filter Wash Water TEk
I1
2* P
*
1 377 S 1 lh 1 - 1 21.00 1 7,917 1 ffl'Casutic Clng Tank 1
11
2* P
*
1 **.14 S 1 lh * - 1 21.00 1 294 1 #1 Caustic Starch TanW
1I
2* P
*
1 9240 S 1 lh * - 1 21.00 1 194,040 1 #1 Evaporator
1
11
2 1 P , *
1 1005 S 1 lh * - 1 21.00. I 21,105 I #1 Evap #1 Effect
1
11
21 P
1
1 420 S 1 WC I - I 6.80 1 2,856 1 #2 Evaporator
11
21 P
1
"4trs`7 1 540 S 1
, WC 1
- *zr:mr ........... 840*** - 1 6.80 1 3,672 1 #3 Evaporator
........;"i2trs--;-
- '*6:80' ...........8T6"*
11
21 P
*
1 216 S 1 lh * ^ I 21.00 1 4,536 1 #4 Evaporator
| 1 1
11
21 p
1
1 490 S 1 lh * - 1 21.00 1 .10,290 1 #5 Evaporator .
1
11 ri ii
21 21 .2 1
P P p
1 * 1
1 70 S I 1 50 S 1 1 290 S 1 i 20 S i 1 190 S 1
lh 1 WC . m1
lb 1
- 1 21.00 f 1,4701 #6 Evaporator ...j .
6.80 ,, I 21.00 1 6,090 1 it 1 Evanorator
6.8*0 ;........:ra7 . 1 21.00 1 3,990 1 #8 Evanorator
il 1 !
21 21
P P
* *
1 t
220 S * lb 1 5*48 S . **wc*7
_1 -
21.00 * *"6780*
4,620 {. ..3; .
#9
Evaporator
' 3 S ' iu i . 1 21.00 1
63 * #1 SOP Evaporator
1I
2* P
*
. i3 s , wc ,
6.80 .............. 88***
1 59 S 1 ih 1 . 1 21.00 I* 1,239 * #2 SOP Evaporator
1. 1 . 2 * P 1
....... 1
20 S 1
lh 1
- ***6780* ...........rar*
. 1 21.00 1
420 1 ft 3 SOP Evaporator
TOTAL PLANT COST $291,401
NOTE: TYPES INSULATION ( INSERT NUMBER ONLY IN TABLE )
NUMBER 1 TANK & VESSEL INSULATION METAL JACKETED 2 TANK l VESSEL INSULATION VSAIKER COATING 3 PIPE INSULATION OUTSIDE WITH METAL PROTECTIVE JACKET < PIPE INSULATION OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULATION -INSlDE BUILDING
NUMBER 6 DUCT INSULATION METAL JACKET 7 DUCT INSULATION WEATHER COATING 8 FURNACE INSULATION EXTERIOR OF STEEL 9 FURNACE INSULATION INSIDE FURNACE
TO 601 ICR JACKET INSULATION
003929
1
J 1 J 1 i 1
Shcrwin
PLANT NAME
EHCIHNEERIHG ESTIMATING SHEET FOR REMOVAL/REPLACEHENT OR REPAIR OF ASBESTOS CONTAINING INSULATING HATERIAl
DATE
2^19-^87
PREPARED BY: G. B. Smith
| ITEM J TYPE j P- REPAIR | YEAR WORK { QUANITITY [THICKNESS] PIPE J UNIT COST
j HO.jINSULATION[ M* REMOVE [TO BE
{
j INCHES | DIA. j
j j SEE NOTE | R* REMOVES {PERFORMED jl-LINEAL FT]
jj
j j BELOW j REPLACE 1
1 S-SQ FT |
11
ITEM COST
LOCATION/COKMENTS
|
!
i I
1i
21
P
I
1 1882 S1 1% 1 - I 21,00 30,522 #4 SOP Evaporator
1
1 *1 1I
91
21
P
P
1 I
, 1102 S. I 361 S I
wc 1 IYC i
** ! dv8Q
7j494
...21,00.. ..24^738. . Ak .SOp. v?dqj*p tpr
|
i 6.80
2,455 33xE-10 Caustic Heated
1I
21 P
I
I 36i si 2" I ,, I 21.00
7,581 39-E-22 Caustic Heated
1i 11 1I
7I 71 7 1
P P P
I I 1
1 **200 S 1 1 1600 S 1 1 1600 S 1
2" 1 ,, 1 21,00 1 4,20G
3" I . 1 21.50 34,400
3" 1
1 21,50 34,4Q0
45-T^-337 Caustic Cine
#1-2 ESP
1
#3-4 ESP '
1
11 1I I1 1I
71 P 71 P 7I P 7 I -P
1 I 1 1
1 50 S 1 1 75 S 1 11700 S 1 * 150 S 1
3" I _ 1 21,50
1^.075
3" I ,, I 21.50
1,613
3" 1 ,, 1 21.50 1 36,550
3" 1 , I 21.50 1 3,225
#7 ESP #8 ESP #9 ESP #1 Dust Collector
1 1 1 *
1I
71 P
I
1 200 S 1 3" 1 ,, I 21.50 1 4,300 : #2-3 Dust Collector *
i. 1
71 P
1
1 200 S * 3" 1 ,, I 21,5Q * *4,300 #4 Dust Collector
*
1!
7 1 P - 1
1 ISO s l 3" 1 ,, I 21.50 1 3,225 #5 Dust Collector
^
Ii
71 P
I
1 50 S 1 3" 1 ,, I 21.50 1 1,075 #6 Dust Collector .
^
! 1.
71 P
1
1
Ill'll
30 S I 3" 1 - 1 111
21,50 * I
1,720 #7 Dust Collector I
*
1
1. l
i
I t 111 1 1
NOTE: TYPES INSULATION ( INSERT NUMBER ONLY IN TABLE )
.NUMBER
1 TANK L VESSEL INSULATION METAL JACKETEO 2 TANK l VESSEL INSULATION WEATHER COATING
5 PIPE INSULATION CUTSIDE WITH METAL PROTECTIVE JACKET
A PIPE INSULATION OUTSIDE WITH WEATHER PROTECTION
5 PIPE INSULATION INSIDE BUILDING
TOTAL PLANT COST $211,871
NUMBER 6 DUCT INSULATION METAL JACKET 7 DUCT INSULATION WEATHER COATING 8 FURNACE INSULATION EXTERIOR OF STEEL 9 FURNACE INSULATION 1NSIOE FURNACE
TO BORER JACKET INSULATION
003930
1
Sherwin
PLANT NAME
ENGIHNEERING ESTIHATIHG SHEET FOR REHOVAL/REPLACEMEHT OR REPAIR OF ASBESTOS CONTAINING INSULATING MATERIAL
DATE 2-19-87 prepared BY: G, B. Smith
(ITEHj TYPE I P- REPAIR ( YEAR WORK \ QUANITITY
J NO.|1HSULATIOMj H* REMOVE |TO BE
j
| | SEE NOTE | R- REMOVES (PERFORMED jl-LIHEAt FT
j
] BELOW (
REPLACE |
( S*SQ FT
THICKNESS INCHES
PIPE DIA.
UNIT COST J ITEM COST |
II
LOCATION/COMMENTS
11 1 =1 11 11 1l 1I I1 11 I1 11 11 11
21 P 2* P 7 1 P' 71 P 7* P 7* P 1 1 p 71 P 7 1. P 7i P 7 1 *M '1
1 1 1 1 * 1 I * 1 1 I !
* 50 s * 400 s 1 200 s * 200 s * 200 s 1 100 s 1 50 s * 200 s 1 100 s 1 50 s 11000 S 1
3" 1 21.50 1 1,075 1 #8 Dust Collector 3" 1 21.50 I 8,600 1 #9 Dust Collector 2,( r 21.00 1 4,200 i #1 ID Fan
2" 1
i 21.00 1 4,200 ! n ID Fan
2" I - t 21.00 1 4,200 1 #3 ID Fan
2" - .21.00 1 2,100 1 # 4 ID Fan
2" - i 21.00 I 1,050 1 #5 ID Fan '
2" - i 21.00 I 4,200 I # 6 ID Fan
2" 1 - i 21.00 I 2,100 1 #7 ID Fan
2" 1 - i 21.00 1 1,050 1 *3 ID Fan
1H I - i 13,50 113,500 I 225 Hood FD Fan 1i i I
i. I
.I
11
I
1 I 1 11 1 l
11
I
I 1 ! I1 1 1
1I
1 '1
1
1 11
i- 1
1. !
1
!11
NOTE: TYrES INSULATION ( INSERT HUMBER ONLY IN TASLE )
NUMBER 1 TANK & VESSEL INSULATION METAL JACKETED 2 TANK VESSEL INSULATION WEATHER COATING 3 PIPE INSULATION OJTSIDE WITH METAL PROTECTIVE JACKET 4 PIPE INSULATION OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULATION * INSiOE DUIID1KG
1I 1
TOTAL PLANT COST
$46,275
NUMBER 6 DUCT INSULATION - METAL JACKET 7 DUCT INSULATION * WEATHER COATING C FURNACE INSULATION EXTERIOR Of' STEEL 9 FURNACE INSULATION INSIDE FURNACE
10 BOILER JACKET INSULATION
003931
Sherwrn
PLANT NAME
ENCIHNEERING ESTIMATING SHEET FOR REHOVAL/REPLACEHEHT OR REPAIR OF ASBESTOS CONTAINING INSULATING MATERIAL
DATE
2-19-87
PREPARED BY: G. B.-Smith
jITEK|
TYPE1 P* REPAIR | YEAR WORK j QUAHITITY jTHICKNESSj PIPE
j NO. (INSULATION] H* REMOVE (TO BE
j
j INCHES | DIA.
j | SEE HOTEJ R- REMOVES jPERFORHED jL-UNEAL FT|
|
j|
BELOW| REPLACE J .
j S-SQ FT j
j
UNIT COST j ITEM COST |
tI
LOCATION/COHMENTS
11
11
1 .1
1i
11
I1
1J It
1I
ii ii ii ii ii ii ! *1.
41
41
P1 P1
41 41
P
P
1 1
4' 1
41 41
41
P1
P1 \P ' 1
'P 1
41
P '1
41
P1
4'
P1
4'
41 1
P^
P1
*- 1
11
11
1 S9a L* f 340 L(
1 830 L1
1 1390 L* 1 * 920 L*
1 600 0
!, 1220 0 ! . 430 iJ
1 690 Li
1 240 Ll
2* J.Z. ..!.....6,65.!. 3,925 1
2" ' 3' *
7.00 * 2,380 (
I2" 4 1 7.60 1 6,308 1
2" * 6 * 8.70 * 12,093 * 2" * 8 * 10.90 * 10,028 *
* l *2" *10
11.50
6,900
2" Il2 1 12.60.1 15,372 1
2" *14 * 14.40 i 6,192 1
2" Il6 I 16.25 1 11,213 1
2" ii8. 1 18.00 1 4,320 i
Repair only Repair only Repair only Repair only Repair only Repair only Repair only Repair only Repair only Repair only
1 120 T* ?" *20 * 20.00 * ;..2,,40Q 1 I 50 L1 2" *22 * 22.00 * 1,100 Repair only ! 370 L* 2" *24 * 24.00 * ` 8,880 * Repair only 1 I 1i 1 I
1 1 1I I I
1
1
1 1' 1
'* I
II
1 . '!
I
I
1 11 I 1I
VOTE: TYPES INSULATION < INSERT NUMBER ONLY IN TABLE )
NUMBER t TANK i VESSEL INSULATION METAL JACKETED Z TANK & VESSEL INSULATION WEATHER COATING 3 PIPE INSULATION OUTSIOE WITH METAL PROTECTIVE JACKET 4 PIPE INSULATION CUTSJOE WITH WEATHER PROTECTION 5 PIPE INSULATION -INSiDE BUILDING
1I 1 I
11 i I
TOTAL PLANT COST $91f 171
NUMBER 6 DUCT INSULATION METAL JACKET 7 OUCT INSULATION WEATHER COATING 6 FURNACE INSULATION EXTERIOR OF STEEL 9 FURNACE INSULATION JNSIOE FURNACE
10 BOILER JACKET INSULATION
003932
<n-ir>r~.rin
PLANT NAME
ENGINEERING ESTIKATING SHEET FOR REKOVAl/REPLACEMEHT OR REPAIR OF ASBESTOS CONTAINING INSULATING MATERIAL
OATE
2-19-87
PREPARED BY: C^B, Smith
11TEK| TYPE | P- REPAIR { YEAR WORK } QUAHITITY {THICKNESSj PIPE | UNIT COST j ITEM COST j
j NO.|INSULATION| H- REMOVE |TO BE
j
J INCHES | DIA. j
j
j
j j j j| SEE NOTE | R- REMOVES {PERFORMED |L*l!HEAL FT I
j
j j BELOW j REPLACE ]
] S-SQ FT )
jj
j
J
II 11 11 11 II 11 11 11 11 1I I1 11
1 !1 1i ( 1
4I
R1
41 4I
R1 JR I
41
R1
41
R*
41
R*
41 41
R1 ........
41
R*
41
R1
41 R l
41
R1
41
R1
1 *I
11
I1
I 590. L I 1 34a L 1 1 830 L 1 1 139Q L 1 * '-920 L * 1 600 L 1 * 1220 L 1 * 430 L 1 1 69Q L * I 240 L 1 1 12Q L l 1 50 L 1 1 370 L 1 II 11 I1
2" I 2 i 16,8Q I 9,9121
2" 1 3" i 17,20 1 5,848|
2" 1 4 1 17.80 1 14,774!
2" I 6 1 18,70 I 25,9931
2" * 8 1 30,IQ 1 27,692*
2" 1 10 1 36.20 * 21.7201
2" * 12 1 42,60 1 51.8501
21' 1 14 1 45.50 1 19,5651
2n * 16 * 56,65 1 39,089*
2,r 1 18. 1 63,60 1 15,264*
V' I 20 i 2" I 22 !
70,35 1 . 8,502* 78.10 l 3,9051
2" 1 24 1 85,30 1 * 31,56:0
!I I 1
11 I 1
I1 1 1
LOCATION/COMMENTS
1 I i 1 ! 1 ! 1 ! i 1 i 1 I 1
NOTE: TYPES INSULATION ( INSERT HUMBER ONLY IN TABLE )
NUMBER
1 TANK i VESSEL INSULATION METAL JACKETED 2 TANK t VESSEL INSULATION WEATHER COATING
3 PIPE INSULATION OUTSIDE WITH HETAl PROTECTIVE JACKET A PIPE INSULATION * OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULATION * INSIDE BUILDING
TOTAL PLANT cost $275,675
,
HUMBER 6 DUCT INSULATION METAL JACKET
7 DUCT INSULATION * WEATHER COATING
6 FURNACE INSULATION EXTERIOR OF STEEL 9 fURNACE INSULATION INSIOE FURNACE 10 BOILER JACKET INSULATION
003933
'Sherwin
PLANT NAME
ENGINEERING ESTIMATING SHEET FOR REKOVAL/REPIACEMENT OR REPAIR OF ASBESTOS CONTAINING INSULATING MATERIAL
date
2-19-87
prepared by: G. B. Smith
JIT EM I TYPE | P* REPAIR j TEAR WORK J QUANITITY |TH!CKNE$S| PIPE | UNIT COST | ITEM COST 1
j NO.(INSULATION| H* REMOVE JTO BE
J
| INCHES j DIA. J
j
|
j | SEE NOTE } R* REMOVES.. (PERFORMED jl-LlNEAL Fxj
jj
j
j
j j BELOW j REPLACE \
j S-SQ FT j
jj
j
j
ttcrcssctcsssrsssrsss:
11 41
P*
L 1 WC 1 2 1 2.60 1 4,628 *
o
CO
11 41
P1
11010 L I wc 1 3 1 3.20 * 3,232 !
1 I 4 1 .P *
1 2500 L 1 WC 1 4 1 3.60 1 9,000 1
LOCATION/COMMENTS
Replace Weather Cove Replace Weather Cove Replace Weather Cove
I1 I1
41 4* I
P1 P1
I 4170 L I wc 1 6 * 4.80 1 20,016 1 Replace Weather Cove I 2760 L 1 wc I 8 * 5.80 1 16,008 I Replace Weather Cove
! 1 .41
P1
I 1790 L 1 wc I 10 1 6.80 1 12,172 1 Replace Weather Cove
I I 4 i ,P I
1 3660 L 1 wc 1 12 1 7.80 .1 28,548 1 Replace Weather Cove
1 t 4 1 *P 1
I 1290 L 1 wc I 14 I 9.00 I 11,610 I Replace Weather Cove
11 1I
41 4I
PI PI
1 2060 L 1 wc 1 16 I 10.00 1 20,600 1 Replace Weather Cove | 710 L I wc I 18. 1 11.00 I 7,810 I Replace Weather Cove
1I II \1 11
4 1. P
41
P
41
P
1
1 I * 1
1 350 L I * 140 L 1 * 1100 L 1 11
wc 1 20 1 12.20 1 4,270 1 wc 1 22 1 13.00 1 1,820'* wc 1 24 1 14.10 1 *15,510 1
I1 I I
Replace Weather Cove Replace Weather Cove Replace Weather Cove
I1 I1
l
!
1I
1 II
ii
I
I
I
I I *' I
'1
It
1
l I l t I l- 1
1. 1
1
I 1 I .! I I I
TOTAL PLANT COST $155,224
note: TYPES INSULATION ( INSERT NUMBER ONLY IN TABLE )
NUMBER
1 TANK l VESSEL INSULATION METAL JACKETED Z TANK & VESSEL INSULATION WEATHER COATING
5 PIPE INSULATION OUTSIDE WITH METAL PROTECTIVE JACKET
i, PIPE INSULATION CUTSIOE WITH WEATHER PROTECTION
5 PIPE INSULATION `'JMSiDE BUILOIVG
. `GRAND TOTAL $3,759,012
NUMBER 6 DUCT INSULATION KETAL JACKET T DUCT INSULATION WEATHER COATING 6 FURNACE INSULATION EXTERIOR OF STEEL S> FURNACE INSULATION INSIOE FURNACE
TO BOILER JACKET INSULATION
003934