Document 3egQNE8GXoZ9oDxp3R9DO7rGJ

1 Pursuant to your memorandum dated December 22, 1986, requesting status of the Sherwin Plant's Asbestos Control/Rsroval Program, please find enclosed a progress report of the itons listed on the asbestos audit in question and a cost estimate to carry out a removal/repair/replacement program for asbestos-containing bulk insulation. Capital funds had been requested in' previous years to repair insulation but they were not approved until the 1987 budget, when $500,000 was allocated. The asbestos insulation removal/repair/replacearent program could be completed by 1990 if funding could be obtained. This estimate reflects a cost effective program to repair and encapsulate the damaged/exposed/friable asbestos insulation where deemed appropriate or Attachments 003908 APPENDIX III SREKWIN ALUMINA PLANT STOREROOM ASBESTOS PRODUCTS PRODUCT * Ring gaskets * Glass sight gaskets Coil belt gasket (4") H Rope Sheet gasket Gasket Gasket, cylinder head Gasket, Clark Brothers ) Ca ring gasket Gasket, water connection Gasket, Ingersol Rand Gasket, Spacer Sheet Gasket * Gasket Gasket, cylinder valve cover Gasket, gould Coil brake lining Gasket, DeLaval Gasket, ring woven Gasket, Flextaulic -- . STOREROOM STOCK NOS.* 07-23-^99 57-06-3196 Vc 57-06-3197 R.PL 57-58-7166 A/C. 12-72-5911 /Jc. 12-72-5925 VC l2-72-535' T>*S 16-05-2646 fZPL 16-05-2551 IZ.PL 16-25-0016 vc 88-32-1345 IZ.PL 57-06-3224 Vc -60-03-mfr ?>AS. 87-09-1030 fZ.PL 87-09-1050 fZ.PL 87-09-1400 Vc 87-13-2672 Vc 87-13-2590 Vc 87-13-2841 Vc 87-13-3255 Vc 87-13-7270 Vc 87-86-2148 Vc 87-86-2152 Vc 87-86-2385 VC 87-862450 fZ.PL * 87-13-2837 VC ' 87-13-8700 VC 87-78-1350 VC 78-86-6176 VC 87-57-2560 VC 6O-0/.-7354 zv*. 60-xx-0024 Za & ///Ai?rex. 16-05-0675 Vc . 16-05-0640 V*- 16-05-0625 Vc 16-05-0595 Vc 16-05-7785 VC * 16-05-7810 vc 16-05-7816 16-05-7765 16-05-7766 16-05-7767 Vc Vc Vc A/C. 16-05-7768 Vc 003909 PRODUCT `Gasket, Flextaulic Gasket, sheet APPENDIX III SHERWIN ALUMINA PLANT STOREROOM ASBESTOS PRODUCTS STOREROOM STOCK NOS.* 16-05-7769 Vc 16-05-7770 yVC 16-05-7772 16-05-7782 //<- 16-05-7783 tfu 16-05-7705 Vc 16-10-0200 16-10-0275 R.PL 16-10-0410 JL PC 46-10-0924" X>/s, 16' 10' 0-565 T>iS` 16-10-5055- 01516-10-0600' D/5. -*6--10-1000 T>ty D'S- 46-40-2-830 t>s- 46-40-4330- 6*5 i/:._1_CL_ D/S --TO" t>tS 46-40-4204 Dt$ 46-40-6767 OiS -16-10-0990 &S * 4.-6-10-3020 OtS ** 4^-10-5507- D/s ' -46-10*4515 6/S *46-10-2630 D/5 . ^46-10-2615 5/5 . 46-10-2-56a D/S -16--15-5625 6/5 46-40-4140. 6/S 46-10-4522 46--30--0560 46-40-2-522 D/S D/S D/S , 46-10-2200 D/S *6--15-2545 D/5 46-1-0-2225 DO 16--10-2400 DO * 46-40-2425 D/S 16-40-244-5 6/s 46--*0--2240 D/S 46-10-25-25 D/S 46--10--3620 DO 16-10-2005 D/S 16-40-4-140 6/S 003910 PRODUCT f :Cteaket, sheet Woven tape Gasket, Flextaulic APPENDIX III SHEKWIN ALUMINA PLANT STOREROOM ASBESTOS PRODUCTS STOREROOM STOCK NOS.* -46-4G-2005- 46-10-2087 bts 46-40-0T95 D/5 . 46-16-2165 1>i} 16-10-0595 TCf>U. 46-10-4150 46-40-4075 46-4~2660 D/* 1C-10"0775 ZV5 4WO-2T72 Z>t% 16-10-2956 T>t$ t>/s 16-10-4070 16-05-7720 VC 16-05-7760 VC 16-05-7761 16-05-7762 16-05-7763 VC Vc Vc 16-05-7764 Vc 16-05-7551 /Vc 16-05-7552 Vc 16-05-7580 Vc 16-05-7592 Vc 16-05-7620 Vc / *16-05-7635 VC > 16-05-7645 Vc 16-05-7671 Vc 16-05-7696 Vc 16-05-7520 16-05-7530 16-05-7500 16-05-7460 16-05-7470 16-05-7549 16-05-7835 16-05-7360 16-05-7310 16-05-7370 16-05-7426 16-05-7420 16-05-7400 16-05-7449 16-05-7827 VC Vc VC vc VC vc VC vc VC VC Vc vc Vc Vc VC 16-05-7820 Vc 46-05-7'W- CVS 16^05-1345 Vc 003911 PRODUCT Gasket, sheet Woven gasket * APPENDIX III SHEKWIN ALUMINA PLANT STOREROOM ASBESTOS PRODUCTS STOREROOM STOCK Nn<; 46-05--25^0 T>>S 16-05-2940 fc-PL 16-05-2695 fc-PL 16-05-2250 fc-PL 16-05-2810 ft Pt- 16-05-2830 fc.Pl. 16-05-2890 ft-PL 16-05-2895 fZPL 16-05-2930 fc.PL 16-05-3850 fc.PL 16-05-2947 fc.PL 16-05-3660 16-05-2950 16-05-2105 fc-PL fS.PL fc-PL 16-05-2040 16-05-2050 16-05-2015 16-05-2000 16-05-1900 16-05-1812 fc.PL fZ.PL fZ.PL ft-PL fZ.PL MC- 16-05-1837 fcPL 16-05-1870 16-05-2810 16-05-2890 jz.pl rz-pL JZ.PL 16-05-1525 fc-PL 16-05-1550 fc.PL 16-05-1675 16-05-1560 16-05-1660 16-05-1700 16-05-1750 16-05-1375 16-05-1370 fc-PL fc-PL fc-PL fc-PL fc-PL fc-PL fc-PL D'S i Aory. t>/5 16-05-1490 16-05-1300 16-05-1275 16-05-1185 16-05-1170 86-18-3962 fc-PL fc-PL fcPL ft-PL fc-PL f>L/* STSC- 16-05-3000 16-05-3030 fcfcL //c 003912 APPENDIX III EHERWIN ALUMINA PLANT STOREROOM ASBESTOS PRODUCTS PRODUCT Packing Chesterton Style 64 Hercules Style 159 Chesterton Style 326 * Woven gasket Gasket, Flextaulic > Metal jacketed asbestos Gasket, Tadpole woven asbestos Gasket, Flextaulic Friction disc Gasket, sheet Gasket, flat woven asbestos Transite cover Arc chutes Base -- Allen Bradley ' STOREROOM STOCK NOS < * 16-25-0306 16-25-3420 16-25-2192 16-25-5300 /t-PL ft. PL fi.PL JtPC - 7ZPL jt.pi.. 16-25-4780 //c -00-32-722088-32-1350 88-54-1375 88-54-1377 D/s f/C- AC Ac. 88-54-1381 tit. 48-10-1015 J*/C 48-12-1010 At. 52-63-2675 /VC 52-80-1605 Vc ` 52-33-7805 52-33-7607 51-80-4620 51-80-4660 VC . 51-03-2000 /VC* 51-03-2010 /VC *Note: This list is not nil inclusive, but only indicates those items noted in the storeroom to contain asbestos. 003913 PLANT LOCATION C.VISION IHERWIN- Surveyed by Ronald e. benton & DATE ROBERT C. BURTON 11-7-R1_______________ SAMPLE 0 is 2S * 3S 4S 5S t 4 6S 7S 8S 9S 10S ns \/* SAMPLE Storeroom' Storeroom Storeroom ASBESTOS SURVEY APPLICATION gasket material for 3920 *overhcad pipe insui. - ad shipping/receiving dock Comp, sheet gasKets, overhead pipe insui., glass sight gasKets, coil belt gasket, rope, brake lining, woven gasket6, asb. tape Paint Shop Office ceiling tile Outside Carpenter Sh >p Pipe insulation Carpenter Shop Overhead pipe insulation Machine Shop Gasket material, white Machine Shop *Adj.to Elec.Shop. Overhead pipe insulation gaskets, sheet gasket material, 3* tape, blanket tbehino cod iorge>, packm arc chutes & asb. paper sleeves on steel pipe*insu small oven in eating area has asb. paper a sheet gasket Bulk Storage Bulk Storage Pipe insulation Pipe insulation, asb. tor paper Power House Insui. 8 & 9 boilers (old) Power House Area boiler insulation & $8 h 9 pipe insulation Power House Atmosp. Blowdown Ver ^cl Vessel insulation Pipe insulation Power House tfll boiler Power House C6 Generator Bulk insulation. if 6 Generator Power House Power House Bldg. Ill, Ccncrat'oi Outer coating Pipe and duct insulation Power House Bldg. Ill, Generator Pipe insulation Power House compressor alter cooler Bldg. Ill, Ccncrntoi nir lines - insui..air in "Xh'ir^TLprrt:i'-t*nHnir--=--(mnrr ANALYTICAL NO YES YES YES YES NO NO YES YES YES YES YES YES YES NO YES YES YES <1% YES . YES -NO YES YES YES -_ /Jc//<c Vc~ Vc -- //CVc Z>SS VC 2VS T>JS \/ Vc JZPl He. He K IL He fZ '' * *_ PLANT , LOCATION XVISION CAMPLE g 12S 13S I4S 15S 16S 17S 18S 1$S [ 20S 21S 22S 23S 24S 25S 26S 27S 28S 29S 30S SHERWIN SURVEYED BY RONALD E. BENTnu t i ROBERT G. BURTON " DATE 11-7-83 CAMPLE ' LOCATION Power Rouse Laboratory ASBESTOS SURVEY - ___________ APPLICATIONRESULTS oven-asb. door 6eals, pipe insul. drum & sample storage Power House - Vo Generator 50 Steam nine Bulk Insulation Air Filter - 5 Generator Closed Heater Area E. Condensate Tank Bulk Insulation Bulk Pipe Insulation I Bulk Insulation Storage Tank for Asb 3rd Level . #850 Steam Line Bulk insul. Pipe insul. #600 Steam Line 2nd Level Facility 22 Facility 22 (old) Pipe insul. Outer paper insul. (pipe) Pipe & bulk insulation ANALYTICAL YES yes Mc_ YES rz YES Z. * .YES //C NO Vc MO //c YES //c. YES //C <1% YES rt<L Facility 22 ESP Facility 24 Intake ductwork insul. Pipe insulation V Facility 22 (old) Facility 22 (old) Facility 22 (old) Facility 22 (old) . Facility 22 (old) #3 SOP . Pipe insul. (email) Fresh air makeup Vessel insulation(2nd flco: ) Coating on aiding pan shape - Kiln floor Vessel insul,-block(see 21 s) ' Old ESP INSUL. icar outers mineral vook behind Vessel insul. similar to old 24 Facility(sce 21S) #1 SOP Vessel inoul - old #32 Area, Starch Sto age Vessel insul. -powder v3 Unit Washer overflow #1-7 flach'tub piping insul. mineral wool inner inoul. materia 1 Liquor to #2 heater vulvc dock piping insul. block oliccLi; ; paper outer YES //C YES /V<L. YES A/CYES /VC YES MC YES //C >' 0 o YES VC YES HO YES VC NO YES ^ a/c* YES 003915 plant LOCATION division SAMPLE <? > 31S 32S . 33S 34S 35S 36S 37S 38S 39S 40S "1 41S 42S 43S 44S ASS 46S 47S 48S c "V 49 S SOS .SHERWIN SURVEYED BY DATE RONALD E. BENTON ROBERT G. BURTON-- 11-7-84 CAMPLE LOCATION #9 horiz! htr. ASBESTOS SURVEY APPLICATION Bulk Insul, #9 horizon, hrt. scrap on floor #2 Settler Bulk Insul. #2 Washer #2 Wash Water Tank ' Bulk Insul. Bulk Insul. bottom area #3 Diluter Bulk Insul. (new) #2 Biluter Bulk Insul. (old) Lime aj>ins tank \ #2 Filter feed tank Cement like matl-5yrs.old Bulk Material & cement Filter wash tank Bulk Insul. #1 Clear Filtrate Ta ik Bulk Insul. Kellev Press filter press Vacuum pot lime Cement Material Inner Material GB Press Cement & Inner (see 39) # Vessel -- end dijes :ors Inner Material #3 ESP Topside Area 42 Tall V. Tank Area 42 hopper tvpc tank Area 42 (Evap.) Area 42 Area 42 Aren 42 Area 42 Bectel Whso. Inner material-rest same Cement Material Cement Material $rd. level piping insul. rnsui. in bottom ol vessel blown on outer inoul. (.asphalt typcJ, hopper taitblown on outer material, j top cap seal lor tali unii > aob. woven pasket, pipe insul.. topside Pipe insul - bulk . Beetcl Whnc. Bulk sheet mterial ANALYTICAL RESULTS YES YES YES YES NO tic TZf^ \/ tic tic tic YES tic YES NC NO tic YES tic YES tic YES tic NO tic NO" tic NO tic NO YES tic tic YES NO .tic tic YES tic YES tic YES tic YES ti<- YES NO tic 003916 . -fLAirr tOCATXON ( DIVISION ` sherwin SURVEYED BY RON ALP E, BENTON $ ~~ HOBEKT G. BURTON DATE H-7-84 SAMPLE fl SIS * ASBESTOS SURVEY SAMPLE LOCATION__________ APPLICATIONRESULTS Heat Exch. Liquor line - old cal. silldate - - ng___________ 2 ________ J52S____________ Kiln discharpp. .Bulk Insul, #1 small dia nine to slide \ inner material * ?**<; 54S - ( KSP_J!_S 2.... Cement Material ESP 1 & 2 Blown asphalt UBepcsttaalirswasretonroaugsee * Bulk pipe lagging, partial roll gasket materic 1 T,pvp1________________ Old brake shoe assblv, Fac. 45 (Garage) Piece 3" asb. tape, brake 6ht>e iii>j>blyt-, lull 3. a*L , tape, piece sheet gasket "ErmriJil tfiruuik-iop"~----" Fac. 45 service area Overhead pipe insul. Kiln Discharge Air elide asb. cloth it it tt it ii ii gaskets, small diameter nine in middle asb. t>at>er insul. Topside ESP ductvori has ash. pnsket material ESP blown on asphalt insul "Yellow" 1U Wile oil muffle Laboratory - Back La - fee. it ti ii Transite fronts muffle fee it it n 4 hoods in back area it it it Also transite inner liner Lab-Men's Room Lab-ndj. .to AA Room u tt tt tt tt Overhead pipe insul. Asb. sleeves on clntnpG also old scrap material (?l Lob Sleeve material in bottom ANALYTICAL yes YES YES YES YES NO YES Vc /Jc VC Vc. Vc Vc YES YES YES 7Z-MV VC YES YES /Lt*W RM Vc YES YES YES Vc YES Vc YES yes YES Vc VC YES YES Vc VC YES YES //m/ YES 7 UUo~9T7 ' ' -'mar ` LOCATION DIVISION SAMPLE 0 . *1 . / * . ( skerwin _____ CURVETED BY DATE RONALD E. BENTON & ROBERT G. BURTON 11-7-83 . ASBESTOS SURVEY SAMPLE LOCATION Power House intake diesel engine - Bldg. Ill* Generator insulation Power House Inlet/outlet piping, air #5 Air Comp. Bldg. comp, insul. Power House Reducing Stn. Area 600 lb. steam line manifold, piping insulatiot Power House Closed Heater ' Power House Boiler Fuel Water Power House Steam Turbine housin Power House Aerator Inks 'Power House Day Tank Heater for fuel oil Pipe Insulation Bulk Insulation Bulk insul., pipe insul. Bulk Insulation Pipe and Bulk Insulation Power House Condensate Filters Power House Flash Tank Power House Exchanger-blowdown heat Condensate pumps Power House #10 Boiler Power House #5 & 6 Boiler Power House 2nd Level Power House #4 & 3 Boiler Power House #4 4 3 Boiler Power House #142 Boiler Power house 850 lb. eteamline Power House 300 lb. heater line Power House #4 Generator Power House 04 Generator Laboratory Pipe Insulation Bulk Insulation Pipe Insulation V. Pipe Insulation Inlet/outlet bulk insul., gasket Bulk insul. and pipe insul. r Bulk insul. and" pipe insul Piping & bulk (#3) Old asb. tape alongside heater Pipe Insulation Pipe Insulation Pipe Insulation asb. padding material (2nd level) old pipe insulation (1st levc1) Old Precision Scientific ANALYTICAL YES VC V(L YES s/c YES yC YES VC * YES A'C YES //c. YES fj(_ YES Vc YES YES Vc yc YES //c YES y/c. YES YES Vc //C YES ` b/C. YES /JC YES y<L YES febW YES //<! YES tfc YES A/C YES R YES YES //<p 003918 ' ' * gjjKT ' SHERWIN LOCATION______________________ C ^VISION_______________________ 04 SURVEYED BY RONALD E. BENTnu a ROBERT C. BURTON DATE 11-7-83 SAMPLE II { SAMPLE LOCATION ASBESTOS SURVEY * _______________ APPLICATIONRESULTS ANALYTICAL $8 Lab i it it #9 Lab n it ii n it it it ii > #10 Lab n ii ti tt Upstairs Lab Stor. Zinc Calcium Room it it ti n ii n ' Drawer & below sink, Hood transite liner, transite exhaust ducts, Sleeves in drawer under muttie tee. transite front & back muffle fee., induction htr. under hood '.as transite, transite hood li Ur, transite exnaust ducts, sleeves in long drawer below 6ink, Precision bcie ice over door seals Transite front & back muiile xce. nooo exnaust duct transite, gloves under nood, transite lined oven Piece sheet gasket material, pipe msui. asb. tape, TC wire, roll asb. paper YES YES V ^ ** YES YES YES hJe jj(; . IZPL jjc ^ YES . ,/C YES YES y/C S/C. <2;o*ei -fZpL. YES VC YES YES YES [Zj^\V Millwright Shop Lab #5 it ii ti ii Lab 'next ToTS (Bomb Lab) Gaskets - precut rings Sleeves "in small drawer, glove, transite in Hevi Uuty 6 usun uvens, aso. paper on hot plate, also m douDl'c^drTIt'ere underneath, hood transite lined Transite lined hood YES ,, YES YES YES YES KPL. N<~C--LAves- ItPL .A'c- //c * Electrical Trailer Roll TC wire YES /S<- Fabrication Shop Welding curtain, several pieces snect g.!>KeL material, gaskets. - YES YES fZ f*L JZ f^L (' Instrument Shop Sheet gasket material YES JZ PL Instrument Storage Flexatudic gasket, TC wire, --i;ueet min - 003919 - YES VES JZPL JLPL * NOTE: Itcrao without numbers were identified cc. containing nabestoc during. the r.urvey. PLANT gHERWIN LOCATION____________________ (. iVISIOH_____________________ . SURVEYED BY DATE _R0NALD E< BENT0N & ROBERT G. BURTON 11-7-84 ASBESTOS SURVEY BAMPLE * ANALYTICAL 6AKPT.E ft_________ LOCATION _______________ APPLICATIONRESULTS Maintenance Shop Cut 4 uncut sneet gaskets, (30 Area) packing, sight glass gasket TCS iLP, Pipe filters ii it cut ring sheet gaskets VES yj.Pi - it ' ii it 30 Area Digestion . pipe insul. between 30 Ares maint. 4 control^oom Lime day tank-bulk insul. 30 Area Cleaning vessel insul. caustic storage bulk insul YES YES . 'YES YES ^pL ^ Vc Area 30 - Vertical Old insul. asb. around Heaters ) ""here". 6 liasn tanks flash tops (4) on horiz. heaters oiu insui. approx. it it 14 settlers have old YES YES YES //C //<y<_ ( bulk asb. insul. oia wasne tt it insul., pipe in&ul., con- TfES densate tank, oia wasner it it overflow tank insul. YES diiuter insul. tt it V - YES Vd- Filtration .. Area 35 - red mud patches or old insul. on several filter fuel tanks, caustic wash tank bulk msi,11. caustic htr. tank insul.. . YES YES y/c Area 35 Pipe and vessel insul., vi 4 l clear YES yc Filtrate tank insul., outc - yes ii ii paper insul., Kelley press 4 AB presses, paper around YES ^ i> ii heater valve between 2. sto -age tanks YES yc Area 45 (PPcT) it u it ii Pipe insul. grd. level S. end digectorn; steam line insul., topside yes YES YES vc tft-. 45 - 1A . Stornee Cabinet out side Tacking YES JLPL Kiln Floor Fnc . 40 Water pape gasket, hot nir olidc gasket material YES Vl-4 LSI' blown on maul., Fnc. 40 F.ST duckvork inoul. (paper) YES tJ*- 003920 ' PLANT ` SPKm.nN . LOCATION _____________ WISION_____________________ SURVEYED BY_RONALD E. BENTON & 'ROBERT G. BURTON ' DATE 11-7-83 ASBESTOS SURVEY SAMPLE 0LOCATION CAMPLE * _______________________________ APPLICATIONRESULTS 1 Fac. AO ESP # 3 & 4 ESP; topside -- limpet material ii ii n round ductwork insul. fan housing insul., ii n it 8 & 9 ESP hopper insul. (paper) and vessel insul. n n it (paper) (Fac. 45, 50, 51) Small Maint. Shed Roll 3: tape, gasket mater: al ANALYTICAL YES YES YES YES YES Vc ^ //C //C" R.PL Area 45 Small vertical tank & hor. * YES //A- .unit (adjacent to it) bulk insul. material YES Vc_ ) .( * * , NOTE: Items without numbers were identified as containing asb istos during the survey. 4 ( . * 003921 Sherwin PLANT NAME ENGINHEERING ESTIMATING SHEET FOR REHOVAL/REPLACCHENT OR REPAIR OF AS8ESTOS CONTAINING INSULATING MATERIAL OAT 2^19-87 PREPARED BY: C. Smith |ITEMI TYPE | P' REPAIR J YEAR WORK | QUAHITITY {THICKNESS j NO*{INSULATION[ K- REMOVE {TO BE | { INCHES | ) SEE NOTE | R- REHCVEA {PERFORMED }L*LIMEAL FT( j j BELOW j REPLACE 1 - { S-SQ FT j PIPE UNIT COST | ITEM COST { DJA. 1 1 IOCATIOH/CCHMEHTS 1 1 lI ii P 1 i164 S | lk - | 21.00 3,444 26-T:10 #5 Feed Tank | 1i ii P 1 1i ii P 1 1i 1i iI i* i P P 1 I 1 i .i i P 1 1\ i i -P , ! 1 25 S 1 lh 1 565 S 1 lk 1 660 S 1 lk 1 540 S I lk 1259 S 1 lk 1 244 S 1 wc - I 21.00 - !' 21.00 5'25 i 26-T-ll U Feed Tank l 11,865 26-T-12 ITS Feed Tank I - 1 21.00 13,860 26-T-23 n Feed Tank 1 - I 21.00 11,340 26-T-14 #1 Feed Tank [ - 1 21.00 1 5,439 26-T-l .86 Desilicator { - 1 6.80 1,659 26-T-l #6 'Desilicator { 1i 1* ii ii P p 1 * * 140 S 11035 S I- lk 1 VIC - I 21.00 - 1 6.80 2,940 7,038 26-T-2 #3 Desilicator I 26-T-2 #3 Desilicator | 1i iI P 1 IL000 S 1 lk 1 21.00 21,000 26-T-3 7 Desilicator | 1i 1 ! `p 1 1 45 S 1 v/c - 1 6.80 306 26-T-3 87 Desilicator [ 1i 1i P 1 1 300 S 1 lk - i 21.00 i 6,300 1 26-T-4 #5 Desilicator { Vi i1 i ii i 11 i' i' ii ii P1 P *- 1 P1 PI Pl ! 100 S | WC - 1 6.80 v 680 26-T-4 #5 Desilicator J 1 300 S 1 1 200 S 1 1 50 S 1 *1000 S 1 lk WC f lk 1 WC \ 1 21.00 6,300 26-T-5 #4 Desilicator 1 1 6.80 i 1,360 } 26-T-5 #4 Desilicator 1 I 21.00 i 1,050 1 26-T-6 82 Desilicator * . 1 6.80 i 6,800 1 26-T-6 82 Desilicatort i. ,.i i P 1 * 151 S * lk NOTE: TYPES INSULATION < INSERT NUMBER ONLY IN TABLE ) NUMBER \ TANK A VESSEL INSULATION HETAL JACKETED 2 TANK A VESSEL INSULATION WEATHER COATING 3 PIPE INSULATION OUTSIDE WITH METAW PROTECTIVE JACKET A PIPE INSULATION OUTSIDE WITH. WEATHER PROTECTION 5 PIPE INSULATION INSitfC BUILDING 1 - 1 21.00 i 3,171 1 26-T-7 #1 Desilicator! TOTAL PLANT COST $ 105,077 NUMBER 6 DUCT INSULATION HETAL JACKET 7 DUCT INSULATION WEATHER COATING 6 FURNACE INSULATION EXTERIOR OF STEEL 9 FURNACE INSULATION INSIDE FURNACE TO BOILER JACKET INSULATION 003922 Sherwin PLANT NAME - ENGINNEERING ESTIMATING SHEET FOR REKOVAL/REPLACEHEHT OR REPAIR Of ASBESTOS CONTAINING INSULATING MATERIAL DATE 2-19^87 PREPARED BY: Gi Smith jlTEHj TYPE j P- REPAIR | YEAR WORK | QUANITITY [ thickness} PIPE 1 UNIT COST j NO.|INSULATION j K- REMOVE [TO BE 1 1 INCHES ( DIA. ! j J SEE NOTE | R- REMOVES .{PERFORMED [L-LINEAL FT[ 1 | BELOW | REPLACE 1 j S*SQ FT | 1 i ITEM COST j 1 l 1 LOCATION/COMMENTS 1 1 l ! l| 21 R 1 1 1330 S 1 2 1 21, GO. 27,9301 PH. -v Deareator Tank I 11 2I R 1 ! 820 S I 2 - I 21.00 17,2201 PH ~ 2) Deareator 1 11 2 1 P' I 1 10 S l 2 1 21.00 2101 PH - Condensate Filter^ 1I 2I p i 1 10'S | 2 - I 21,00 210 [ PK-* Flash Tank | 11 21 p 1 1 4 1 p 1 1 1 *-.10 S 1 1 10 s i 2 2 1 21.OQ 1 21,00 210! PH - Exchanger Blowdowt. 210! PH - Condensate Pump ! 1I 11 11 i1 I1 11 1 4 1 p 41 p 41 p 41 p 1 'R ^1 R 1 1 1 1 l 1 1 I I 300 L 1 1 200 L 1 I 800 L 1 1 100 L * i 6* 4 3 WC 3 I 8* 11 1 12.60 1 12.60 I 1 7.80 3,780* PH - 850 lb Steam Line* 2,520* PH 300 lb Steam Line* 6,240* PH - iiisc Pipelines * i 12.60 1,260* PH - 600 lb Steam Line! *4000.00 . 24,000* Lab truffle Furnaces * % *9000.00 r Lab Hoods Exhaust Dub ooo <Vl 1I II 1 *. 1 1 1! 11 I 1. 1 1 1 1 1 !1 I 1! I ! \1 1. i 1 1 1 1 I MOTE: TYPES INSULATION ( INSERT HUMBER ONLY IN TABLE ) WH9ER t TANK l VESSEL INSULATION HETAl JACKETED Z TANK l VESSEL INSULATION WEATHER COATING 5 PIPE INSULATION OUTSIDE WITH HETAL PROTECTIVE JACKET 4 PIPE INSULATION * OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULATION iNSiOE BUILDING 1 ' 1 1 1 TOTAL PLANT COST $ 155,790 NUMBER 6 DUCT INSULATION METAL JACKET 7 DUCT IHSULATION WEATHER COATING 8 FURNACE INSULATION EXTCRIOP Of STEEL 9 FURNACE INSULATION INSIDE FURNACE TO BOILER JACKET INSULATION 003923 1 ! Sherwin PLANT HAKE ENGINEERING ESTIMATING SHEET FOR REMOVAL/REPLACEHEHT OR REPAIR OF ASBESTOS CONTAINING INSULATING MATERIAL DATE 2-19-87 PREPARED BY: G. Smith |ITEM] TYPE j P- REPAIR J YEAR WORK | QUANTTHY |THICKNESS| PIPE | UNIT COST | ITEM COST J LOCATIOM/COMHENTS | HO. JINSULATIOH j H- REMOVE |TO BE 1 i SEE NOTE j R- REMOVES (PERFORMED 1 i BELOW j REPLACE 1 *. ess: 71 2 1 R 1 J | INCHES |l LINEAL FTj 1 S-SQ FT j j DIA. ( 1 .1 1 5500 S 1 2" .1 21.00 j| 1I 11 * 115,000 I 24-T-22 #3 Slurry Tank! 1i 1i 2 1R 7JP I 1 I 1965 S i T' \ 200 S 1 2" - I 21.00 i 41,265 225-T-l #1 SOP Tank - I 21.00 1 4,200 i PH - #1 Boiler | ] 1i 71P i 1 200 S 1 2" - 1 21.00 | 4,200 | PH - #2 Boiler | Ii 1i 1i 7*P 71 P 7 i p , 1 1 1 1 150 S 1 2" 1 150 S 1 2" i ' 200 S 1 2" - I 21.00 1 - 1 21.00 I - 1 21.00 i 3,150 1 PH - #3 Boiler 3,1501 PH - #4 Boiler 4,200| PH - #8 Boiler ( ( | 1i 7* p ! 1 200 S I 2" - ! 21.00 I 4,200l PH - #9 Boiler 1 Ii t 1i 1i 1i 71 p 2. 1 p 7 1 `p 71 p I 1 I ( I 300 S 1 1 10 S * I 20 S * 1 , 20 S* 2" 2" 4" 2" - 1 21.00 * 6,300* PH - #10 Boiler 1 . I 21.00 1 210* PH - Blowdown Vessel 1 - 1 21.00 I 4201 PH - Generators 1 - 1 21.00 r .42d( PH - Closed Heaters I ii 1i 71 2i p p 1 1 1 30 Si WC - ! 6.80 1 ' 2041 PH - #5 Mr Compressor! I 50 Si 2" 1 - 1 21.00 I l,050l PH Boiler Fuel Oil Htd 1i 1 .(' 2i i ? 1 1 I so si 2" 1 - 1 21.00 I 1,050] PH - Day Tank 1 I 11 I 1 1 Ii I *1 ( ill i i i NOTE: TYPES INSULATION < INSERT NUMBER ONLY IN TABLE ) NUMBER \ TARN VESSEL INSULATIOH METAL JACKETCO 2 TANK & VESSEL INSULATION weather coating 3 PIPE INSULATION - CUTS1DE WITH METAL PROTECTIVE JACKET A PIPE INSULATION CUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULATION IWSiDC BUILDING OTAl PLANT COST $1S9 .019 HUMBER 6 DUCT INSULATION METAL JACKET 7 DUCT INSULATION WEATHER COATING 8 FURNACE INSULATION EXTERIOR OF STEEL 9 FURNACE INSULATION INSIDE FURNACE 10 BOllCR JACKET INSULATIOH 003924 Sherwin PLANT NAME EHGINHEERING ESTIMATING SHEET FOR REMOVAL/REPLACEHENT OR REPAIR OF ASBESTOS CONTAINING INSULATING HATERIAL DATE 2-19-87 PREPARED BY: Smith JlTEKl TYPE | P- REPAIR J YEAR WORK 1 OUANITITY j tkickness] PIPE 1 <M HSULATION| H- REMOVE (TO 8E 1 inches DIA. 1 i SEE NOTE | R* REMOVES (PERFORMED | .LINEAL FT j 1 I BELOW | REPLACE I I S-SQ FT 1 UNIT COST J ITEM COST | 11 II I1 LOCATION/COMHENTS { 1 1 11 li P 1 I 100 s 1 WC - 6.80 1 680.OQ 26-T-7 #1 Desilicator ( 11 11 ii 11 P P 1 I 1 1250 S 1 lk 1 2150 S I WC 21.00 - f 6.80 126,250.oq 30-1-1 thru 10 Heaters| 114,620.oq #1 Dig. Vert Heaters ( 1I II t1 I1 I( 11 11 tf ff 1 i( ii i *i ii i' i' ii iI iI 1* i1 P P P P, P P R i 1 1 I ( 1 1 i I 'P 1 iI Vj. i iI P 1 11 P 1 11 P 1 11 11 P1 P '* 1 4152 s 1 3 1 *555 s 1 WC 1 942 S 1 WC 1 141 S I 2 * 71 s * WC I 998 s 1 1 2150 s i 1% WC 1 25 s 1 WC f 967 s 1 lk 562 s 1 374 s 1 2h 3 302 S ! WC 180 S 1 WC 40 s i Ik - 21.50 *89,268.Od #1 Unit Digesters 1 - 6 .'80 1 3,774.0d 1-1 Flash Tank ! - 6.80 1 6,406.0(1 2-6 Flash Tank ! - 1 21.00 1 2,961.Od 2-9 Flash Tank 1 - 6.80 i 484.Od 2-10 Flash Tank i - 21.00 120,950.011 30-2-1 thru 10 Heaters! - I 6.80 114,620.0m ft 2 Dig. Vert Heaters f - i 6.80 I . 170.om Fac 30 Flash Separator^ - 21.00 120,307. Of) 30-3-1 thru 10 Heaters) - 21.00 111,802.00 ft 3 Dig Vert Heaters | - 21.50 | 8,041.OP ft 3 Unit Digesters | - 6.80 1 2,054.Op ft3 Unit Digesters [ - 6~80 f 1,224.Op It5 Unit Flash Tanks j - 21.00 |. 840.Op Its Unit Flash Tanks | i. i 11 P I 269 S 1 lk - 21.00 l 5,649. CIO 30-4-1 thru 10 Hcatcri NOTE: TYPES INSULATION < INSERT NUMBER ONLY IN TABLE ) NUMBER 1 TANK 4 VESSEL INSULATION HETAL JACKETED Z TANK A VESSEL INSULATION WEATHER COATING 5 PIPE INSULATION * OUTSIOE WITH METAL PROTECTIVE JACKET A PIPE INSULATION CUTSIDE WITH WEATHER PROTECT!) 'N 5 P1PC INSULATION INSUE BUILDING TOTAL PLANT COST $230,100 NUMBER 6 DUCT INSULATION METAL JACKET 7 DUCT INSULATION WEATHER COATING 6 FURNACE INSULATION EXTERIOR OF STEEL 9 FURNACE INSULATION INSIDE FURNACE TO BOILER JACKET INSULATION 003925 Sherwin PLANT HAKE ENGINEERING ESTIMATING SHEET FOR REKOVAL/REPLACEHEHT OR REPAIR Of ASBESTOS CONTAINING INSULATING MATERIAL DATE 2-19-87 PREPARED BY: G. B. Smith flTEKl TYPE | P- REPAIR J YEAR WORK | GUANITITY J tkickness[ PIPE | UNIT COST | ITEK COST | 1 o.| NSULATIOHj H* REMOVE 1 TO BE 1 i INCHES { DIA. j 1 1 1 1 SEE NOTE 1 R* REMOVES, {PERFORMED JL-UNEAL FTj 1i 1 1 i l BELOW | REPLACE 1 | S-SQ FT | 11 1 t LOCATION/COMMENTS ! i ii i /1 21 21 P P 1 1 1 187 S 1 1 51 S 1 2h I _ i 21.50 * 4,021.0(1 #4 Dig Vertical Heatel 2 I - I 21.00 1 l,071.0d #3 Dig Vanor Separatol ll 2 I P' 1 1 - 44 S 1 2 1 - 1 21.00 1 . 924.0(i #4 Dig Vapor Separatol lt 21 P 1 1 670 S I 1U 1 - 1 21.00 114,070.0(1 #5 Die Unit Heaters 1 Il 2I P l l 2 I P 1 i 1 '179 S 1 i 277 S 1 lh I WC 1 - 1 21.00 1 3,759.0(1 #5 Unit Flash Tanks ! - 1 21.00 I 5,817.0(> #5 Unit Flash Tanks i ll ll 21 ii P , R' 1 1 I '39 S 1 I4320 S 1 1% 1 - I 21.00 i 819.04 #5 Unit Flash Separati 13s ! - 1 24.00 103,680.04 #11 Washer ! ll 1I R 1 1 7430 S 1 13s I - 1 24.00 174,320.04 #10 Washer 1 ii it 11 R 1 I *R 1 1 1 7430 S 1 1 7430 S 1 13s 1 lh 1 - 1 24.00 174,320.04 #9 Washer - ! 24.00 174,320.04 #8 Washer _ ( I ll 1- i !1 1! ii 21 11 21 R P R P I 1 1 1 * 7430 S * 1 1728 S * 1 4147 S 1 I 1382 S i lh 1 _ I 24.00 J74,320.db #7 Washer lh 1 - I 21.00 1 3*6,288. Ob #6 Washer lh 1 - 1 24.00 I 99,528.01) #5 Washer lh I - I 21.00 I 29,022.Qb #4 Washer 1 I 1 1 \l 21 P l t 372 S 1 lh 1 - 1 21.00 ! 7,S12.0t) #3 Washer 1 11 2I P 1 I 372 S 1 lh 1 - 1 21.00 1 7,812.00 #2 Washer 1 !. I 11 R I I 2592 S I lh - | 21.00 1 54,432.OP #1 Washer NOTE: TYPES INSULATION < INSERT NUMBER ONLY IN TABLE ) NUMBER \ TANK & VESSEL INSULATION METAL JACKETED 2 TANK t VESSEL INSULATION WEATHER COATING Z PIPE INSULATION * CUTS10C WITH METAL PROTECTIVE JACKET 4 PIPE IKSUtATION OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULATION INSiOE BUILDING TOTAL PLANT COST $1,066,355 NUMBER 6 OUC7 INSULATION - METAL JACKET ' 7 DUCT INSULATION WEATHER COATING 8 FURNACE INSULATION EXTERIOR Of STEEL 9 FURNACE INSULATION INSIDE FURNACE 10 BOILER JACKET INSULATION 003926 ! Sherwin PLANT NAME ENGINEERING ESTIMATING SHEET FOR REHOVAL/REPLACEMEHT OR REPAIR OF AS8ESTOS CONTAINING INSULATING MATERIAL DATE 2-19-87 PREPARED BY: G. B. Smith JITEMJ TYPE | P- REPAIR | YEAR WORK ( QUANITITY (THICKHESS[ PIPE j UNIT COST ( ITEH COST j j NO.|INSULATION( H- REMOVE (TO BE 1 ! INCHES I DIA. 1 f f j j SEE NOTE j R* REMOVES (PERFORMED jL-LINEAL FTJ 11 1 1 j j BELOW | REPLACE 1 1 S-SQ FT | 11 I 1 location/comments '111 l_ 1 x1 11 1 R R r' 1 1 1 1 7430 S 1 2" 1 - 1 24.00 1 178,3201 #12 Washer I 7430 S 1 2" I - 1 24.00 1 178,320 | #15 Washer I 2828 S 1 lk I - 1 24.00 1 67,8721 #1 Settler 11 |P 1 1 1200 S 1 lk 1 - I 21.00 1 25,2001 #2 Settler It II. 1P 1R 1 I I `- 943 S 1 lk 1 - 1 21.00 1 19,8031 #3 Settler 1 11885 S 1 lh 1 - 24.00 1 45,2401 #4 Settler III 11 ! P, P 11 1P III P II .1 III i1 1 P P 1 1 1 I 1 1 1 1 1413 I lk 1 - 21.00 1 29,673i #6 Settler 200 I lk 1 - 21.00 1 4y200| #7 Settler 1 1493 1 lk 1662 , ' WC 600 . 1 mi""" 1131 1 lk 1. ..rl 1- 21.00 | 31,353| #9 Settler 6.80 . 11,302 21.00 1 12,600' #10 Settler "6780" ;****7,w21.00 1 .23,751' #11 Settler 1493 * 13S 1 21.00 1~ 31,353'! #12 Settler 1I 1 ' 1 1I 1 1 11 11 11 ! 1 I 11 i ; 1 *1.. I 1 1 1 I1 1 1 1f 1 I 1 1 11 1 1 1. 1 1 1I 1 NOTE: TYPES INSULATION ( INSERT NUM8ER ONLY IN TABLE ) NUMBER 1 TANK 4 VESSEL INSULATION METAL JACKETED 2 TANK 4 VESSEL INSULATION WEATHER COATING 5 PIPE INSULATION CUTSIDE WITH METAL PROTECTIVE JACKET A PIPE INSULATION * OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULAT ION INSiOE BUILDING 11 1 1 TOTAL PLANT COST $666,678 WUM8ER 6 DUCT INSULATION METAL JACKET 7 DUCT INSULATION WEATHER COATING C FURNACE INSULATION EXTERIOR Of' STEEL 9 FURNACE INSULATION INSIDE FURNACE U BOILER JACKET INSULATION 003927 ! ( ! 1 1 1 1 1 1 1 1 i 1 1 1 1 i 1 1 Sherwin PLANT NAME - ENG5NNEERING ESTIMATING SHEET FOR REKOVAL/REPLACEHEHT OR REPAIR Of ASBESTOS CONTAINING INSULATING HATERIAL DATE 2-19-87 sy.PREPARED G. B. Smith 1 I | P- ( | (1 TEH TYPE REPAIR | YEAR WORK j OUANITITY (THICKNESS) PIPE UNIT COST ITEH COST j H- j j j j 1NO.|INSULATION[ REMOVE | TO BE INCHES DIA. I j j j j jSEE NOTE | R- REHOVE& (PERFORMED (L-UNEAL FT 1I j j j I | I8ELOW REPLACE 1 S-SQ FT II 1 LOCATION/COMMEHTS | 1 1 1 II Ml II II II 11 11 lI 21 21 21 21 21 21 R R P P P R R 1 1 1 1 1 1 1 1 1493 Si 1 286 Sl 1 93 S I 1 200 Sl 1 *- 50 Sl 1 500 Sl 1 '528 Sl lh I 2 li lh I1 3" 1I 2h 11 lh 11 WC 1I - 1 24.00 I 35,832 I #14 Settler I |1 21.00 I 6,006 | 33-E-9 Caustic Heater - f 21.00 1 (1,953 1 #1 Washer O'Flow Tank - 1 21.50 1 4,300 1 #3 Washer O'Flow Tank | - 1 21.50 1 1,075 1 Washer O'Flow Premix TJa - |I 21.00 I 10,500 Settler O'Flow Relay - |1 6.80 1 3,590 #1 Barometric Hot Wellj II II II 11 11 <1 11 II 21 21 21 2' 2\ j1 !1 21 R1 R1 P1 P1 P1 R1 R * 1 P1 I 1 1037 S* I 528 S* 1 270 S* lh 11 _ 1 1 I21.00 21,777 #1 Wash Water Coll Tarlk lh 11 - 1 21.00 1 11,088 i #2 Barometric Hot Well lh 1i :i 6.80 , 21.00 1 *5,216 . 5,670 #3 Wash Water Coll Tarlk 1 1S1 s1 1 .330 S1 lh 1! . 1 21.00 * . 3,171 * #3 Barometric Condenser lh 1 - I 21.00 * 6,510 1 #1 Filter Feed Tank 1 11 3142 Si lh - I 24.00 1 *75,408 1 #2 Filter Feed Tank 1 * 3142 Si lb I - 1 24.00 1 75,408 1 #3 Filter Feed Tank 1 i 665 Si wc i ....2k... . ^1 6.80 , 4,522 ...2,5?0k. #4 Filter Feed Tank II I iI Ii NOTE: TYPES INSULATION ( INSERT HUMBER ONLY IH TABLE ) NUMBER 1 TANK A VESSEL INSULATION METAL JACKETED 2 TANK 4 VESSEL IKSULATION WEATHER COATING 3 PIPE INSULATION * CUTSIDE WITH METAL PROTECTIVE JACKET 4 PIPE INSULATION * CXJTSIOE WITH. WEATHER PROTECTION 5 PIPE INSULATION iKSiDC BUI ID INC TOTAL PLANT COST $274.546 NUMBER 6 DUCT INSULATION METAL JACKET 7 OUCT INSULATION WEATHER COAT I KG 8 FURNACE IKSULATION EXTERIOR OF STEEL 9 FURNACE INSULATION INSIDE FURNACE 10 BOILER JACKET INSULATION 003928 Sherwin__________ PLANT NAME .- engineering estimating sheet for REKOVAL/REPIACEHENT OR REPAIR Of AS8ESTOS CONTAINING INSULATING MATERIAL oate 2-19-87 .^ PREPARED BY: G. B. Smith |ITEM{ TYPE j P- REPAIR | YEAR WORK | QUANITITY jTHICKNESSj PIPE j UNIT COST J ITEM COST j NO.{INSULATION] H- REMOVE |TO BE j | INCHES | DIA. | j j j SEE NOTE j R- REMOVES jPERfORMED jl-LINEAL FT{ jj j j j BELOW j REPLACE { . ] S-SQ FT j jj j tOCATIOH/COMMENTS I II 1/1 2I 2I P P I 331 S 1 lh I - I 21.00 I 6,921 ;"T60"s*""-*wc: * * '-*......... 5781r"T,tr8S' 1 40 s i lh_ I - I 21.00 I 840 itS Filter Feed Tank I Filter Caustic Wash Tah 1I 2 1 P* * 1 628 S 1 lh 1 - 1 21.00 113,188 I #4 Filter Wash Water TEk I1 2* P * 1 377 S 1 lh 1 - 1 21.00 1 7,917 1 ffl'Casutic Clng Tank 1 11 2* P * 1 **.14 S 1 lh * - 1 21.00 1 294 1 #1 Caustic Starch TanW 1I 2* P * 1 9240 S 1 lh * - 1 21.00 1 194,040 1 #1 Evaporator 1 11 2 1 P , * 1 1005 S 1 lh * - 1 21.00. I 21,105 I #1 Evap #1 Effect 1 11 21 P 1 1 420 S 1 WC I - I 6.80 1 2,856 1 #2 Evaporator 11 21 P 1 "4trs`7 1 540 S 1 , WC 1 - *zr:mr ........... 840*** - 1 6.80 1 3,672 1 #3 Evaporator ........;"i2trs--;- - '*6:80' ...........8T6"* 11 21 P * 1 216 S 1 lh * ^ I 21.00 1 4,536 1 #4 Evaporator | 1 1 11 21 p 1 1 490 S 1 lh * - 1 21.00 1 .10,290 1 #5 Evaporator . 1 11 ri ii 21 21 .2 1 P P p 1 * 1 1 70 S I 1 50 S 1 1 290 S 1 i 20 S i 1 190 S 1 lh 1 WC . m1 lb 1 - 1 21.00 f 1,4701 #6 Evaporator ...j . 6.80 ,, I 21.00 1 6,090 1 it 1 Evanorator 6.8*0 ;........:ra7 . 1 21.00 1 3,990 1 #8 Evanorator il 1 ! 21 21 P P * * 1 t 220 S * lb 1 5*48 S . **wc*7 _1 - 21.00 * *"6780* 4,620 {. ..3; . #9 Evaporator ' 3 S ' iu i . 1 21.00 1 63 * #1 SOP Evaporator 1I 2* P * . i3 s , wc , 6.80 .............. 88*** 1 59 S 1 ih 1 . 1 21.00 I* 1,239 * #2 SOP Evaporator 1. 1 . 2 * P 1 ....... 1 20 S 1 lh 1 - ***6780* ...........rar* . 1 21.00 1 420 1 ft 3 SOP Evaporator TOTAL PLANT COST $291,401 NOTE: TYPES INSULATION ( INSERT NUMBER ONLY IN TABLE ) NUMBER 1 TANK & VESSEL INSULATION METAL JACKETED 2 TANK l VESSEL INSULATION VSAIKER COATING 3 PIPE INSULATION OUTSIDE WITH METAL PROTECTIVE JACKET < PIPE INSULATION OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULATION -INSlDE BUILDING NUMBER 6 DUCT INSULATION METAL JACKET 7 DUCT INSULATION WEATHER COATING 8 FURNACE INSULATION EXTERIOR OF STEEL 9 FURNACE INSULATION INSIDE FURNACE TO 601 ICR JACKET INSULATION 003929 1 J 1 J 1 i 1 Shcrwin PLANT NAME EHCIHNEERIHG ESTIMATING SHEET FOR REMOVAL/REPLACEHENT OR REPAIR OF ASBESTOS CONTAINING INSULATING HATERIAl DATE 2^19-^87 PREPARED BY: G. B. Smith | ITEM J TYPE j P- REPAIR | YEAR WORK { QUANITITY [THICKNESS] PIPE J UNIT COST j HO.jINSULATION[ M* REMOVE [TO BE { j INCHES | DIA. j j j SEE NOTE | R* REMOVES {PERFORMED jl-LINEAL FT] jj j j BELOW j REPLACE 1 1 S-SQ FT | 11 ITEM COST LOCATION/COKMENTS | ! i I 1i 21 P I 1 1882 S1 1% 1 - I 21,00 30,522 #4 SOP Evaporator 1 1 *1 1I 91 21 P P 1 I , 1102 S. I 361 S I wc 1 IYC i ** ! dv8Q 7j494 ...21,00.. ..24^738. . Ak .SOp. v?dqj*p tpr | i 6.80 2,455 33xE-10 Caustic Heated 1I 21 P I I 36i si 2" I ,, I 21.00 7,581 39-E-22 Caustic Heated 1i 11 1I 7I 71 7 1 P P P I I 1 1 **200 S 1 1 1600 S 1 1 1600 S 1 2" 1 ,, 1 21,00 1 4,20G 3" I . 1 21.50 34,400 3" 1 1 21,50 34,4Q0 45-T^-337 Caustic Cine #1-2 ESP 1 #3-4 ESP ' 1 11 1I I1 1I 71 P 71 P 7I P 7 I -P 1 I 1 1 1 50 S 1 1 75 S 1 11700 S 1 * 150 S 1 3" I _ 1 21,50 1^.075 3" I ,, I 21.50 1,613 3" 1 ,, 1 21.50 1 36,550 3" 1 , I 21.50 1 3,225 #7 ESP #8 ESP #9 ESP #1 Dust Collector 1 1 1 * 1I 71 P I 1 200 S 1 3" 1 ,, I 21.50 1 4,300 : #2-3 Dust Collector * i. 1 71 P 1 1 200 S * 3" 1 ,, I 21,5Q * *4,300 #4 Dust Collector * 1! 7 1 P - 1 1 ISO s l 3" 1 ,, I 21.50 1 3,225 #5 Dust Collector ^ Ii 71 P I 1 50 S 1 3" 1 ,, I 21.50 1 1,075 #6 Dust Collector . ^ ! 1. 71 P 1 1 Ill'll 30 S I 3" 1 - 1 111 21,50 * I 1,720 #7 Dust Collector I * 1 1. l i I t 111 1 1 NOTE: TYPES INSULATION ( INSERT NUMBER ONLY IN TABLE ) .NUMBER 1 TANK L VESSEL INSULATION METAL JACKETEO 2 TANK l VESSEL INSULATION WEATHER COATING 5 PIPE INSULATION CUTSIDE WITH METAL PROTECTIVE JACKET A PIPE INSULATION OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULATION INSIDE BUILDING TOTAL PLANT COST $211,871 NUMBER 6 DUCT INSULATION METAL JACKET 7 DUCT INSULATION WEATHER COATING 8 FURNACE INSULATION EXTERIOR OF STEEL 9 FURNACE INSULATION 1NSIOE FURNACE TO BORER JACKET INSULATION 003930 1 Sherwin PLANT NAME ENGIHNEERING ESTIHATIHG SHEET FOR REHOVAL/REPLACEMEHT OR REPAIR OF ASBESTOS CONTAINING INSULATING MATERIAL DATE 2-19-87 prepared BY: G, B. Smith (ITEHj TYPE I P- REPAIR ( YEAR WORK \ QUANITITY J NO.|1HSULATIOMj H* REMOVE |TO BE j | | SEE NOTE | R- REMOVES (PERFORMED jl-LIHEAt FT j ] BELOW ( REPLACE | ( S*SQ FT THICKNESS INCHES PIPE DIA. UNIT COST J ITEM COST | II LOCATION/COMMENTS 11 1 =1 11 11 1l 1I I1 11 I1 11 11 11 21 P 2* P 7 1 P' 71 P 7* P 7* P 1 1 p 71 P 7 1. P 7i P 7 1 *M '1 1 1 1 1 * 1 I * 1 1 I ! * 50 s * 400 s 1 200 s * 200 s * 200 s 1 100 s 1 50 s * 200 s 1 100 s 1 50 s 11000 S 1 3" 1 21.50 1 1,075 1 #8 Dust Collector 3" 1 21.50 I 8,600 1 #9 Dust Collector 2,( r 21.00 1 4,200 i #1 ID Fan 2" 1 i 21.00 1 4,200 ! n ID Fan 2" I - t 21.00 1 4,200 1 #3 ID Fan 2" - .21.00 1 2,100 1 # 4 ID Fan 2" - i 21.00 I 1,050 1 #5 ID Fan ' 2" - i 21.00 I 4,200 I # 6 ID Fan 2" 1 - i 21.00 I 2,100 1 #7 ID Fan 2" 1 - i 21.00 1 1,050 1 *3 ID Fan 1H I - i 13,50 113,500 I 225 Hood FD Fan 1i i I i. I .I 11 I 1 I 1 11 1 l 11 I I 1 ! I1 1 1 1I 1 '1 1 1 11 i- 1 1. ! 1 !11 NOTE: TYrES INSULATION ( INSERT HUMBER ONLY IN TASLE ) NUMBER 1 TANK & VESSEL INSULATION METAL JACKETED 2 TANK VESSEL INSULATION WEATHER COATING 3 PIPE INSULATION OJTSIDE WITH METAL PROTECTIVE JACKET 4 PIPE INSULATION OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULATION * INSiOE DUIID1KG 1I 1 TOTAL PLANT COST $46,275 NUMBER 6 DUCT INSULATION - METAL JACKET 7 DUCT INSULATION * WEATHER COATING C FURNACE INSULATION EXTERIOR Of' STEEL 9 FURNACE INSULATION INSIDE FURNACE 10 BOILER JACKET INSULATION 003931 Sherwrn PLANT NAME ENCIHNEERING ESTIMATING SHEET FOR REHOVAL/REPLACEHEHT OR REPAIR OF ASBESTOS CONTAINING INSULATING MATERIAL DATE 2-19-87 PREPARED BY: G. B.-Smith jITEK| TYPE1 P* REPAIR | YEAR WORK j QUAHITITY jTHICKNESSj PIPE j NO. (INSULATION] H* REMOVE (TO BE j j INCHES | DIA. j | SEE HOTEJ R- REMOVES jPERFORHED jL-UNEAL FT| | j| BELOW| REPLACE J . j S-SQ FT j j UNIT COST j ITEM COST | tI LOCATION/COHMENTS 11 11 1 .1 1i 11 I1 1J It 1I ii ii ii ii ii ii ! *1. 41 41 P1 P1 41 41 P P 1 1 4' 1 41 41 41 P1 P1 \P ' 1 'P 1 41 P '1 41 P1 4' P1 4' 41 1 P^ P1 *- 1 11 11 1 S9a L* f 340 L( 1 830 L1 1 1390 L* 1 * 920 L* 1 600 0 !, 1220 0 ! . 430 iJ 1 690 Li 1 240 Ll 2* J.Z. ..!.....6,65.!. 3,925 1 2" ' 3' * 7.00 * 2,380 ( I2" 4 1 7.60 1 6,308 1 2" * 6 * 8.70 * 12,093 * 2" * 8 * 10.90 * 10,028 * * l *2" *10 11.50 6,900 2" Il2 1 12.60.1 15,372 1 2" *14 * 14.40 i 6,192 1 2" Il6 I 16.25 1 11,213 1 2" ii8. 1 18.00 1 4,320 i Repair only Repair only Repair only Repair only Repair only Repair only Repair only Repair only Repair only Repair only 1 120 T* ?" *20 * 20.00 * ;..2,,40Q 1 I 50 L1 2" *22 * 22.00 * 1,100 Repair only ! 370 L* 2" *24 * 24.00 * ` 8,880 * Repair only 1 I 1i 1 I 1 1 1I I I 1 1 1 1' 1 '* I II 1 . '! I I 1 11 I 1I VOTE: TYPES INSULATION < INSERT NUMBER ONLY IN TABLE ) NUMBER t TANK i VESSEL INSULATION METAL JACKETED Z TANK & VESSEL INSULATION WEATHER COATING 3 PIPE INSULATION OUTSIOE WITH METAL PROTECTIVE JACKET 4 PIPE INSULATION CUTSJOE WITH WEATHER PROTECTION 5 PIPE INSULATION -INSiDE BUILDING 1I 1 I 11 i I TOTAL PLANT COST $91f 171 NUMBER 6 DUCT INSULATION METAL JACKET 7 OUCT INSULATION WEATHER COATING 6 FURNACE INSULATION EXTERIOR OF STEEL 9 FURNACE INSULATION JNSIOE FURNACE 10 BOILER JACKET INSULATION 003932 <n-ir>r~.rin PLANT NAME ENGINEERING ESTIKATING SHEET FOR REKOVAl/REPLACEMEHT OR REPAIR OF ASBESTOS CONTAINING INSULATING MATERIAL OATE 2-19-87 PREPARED BY: C^B, Smith 11TEK| TYPE | P- REPAIR { YEAR WORK } QUAHITITY {THICKNESSj PIPE | UNIT COST j ITEM COST j j NO.|INSULATION| H- REMOVE |TO BE j J INCHES | DIA. j j j j j j j| SEE NOTE | R- REMOVES {PERFORMED |L*l!HEAL FT I j j j BELOW j REPLACE ] ] S-SQ FT ) jj j J II 11 11 11 II 11 11 11 11 1I I1 11 1 !1 1i ( 1 4I R1 41 4I R1 JR I 41 R1 41 R* 41 R* 41 41 R1 ........ 41 R* 41 R1 41 R l 41 R1 41 R1 1 *I 11 I1 I 590. L I 1 34a L 1 1 830 L 1 1 139Q L 1 * '-920 L * 1 600 L 1 * 1220 L 1 * 430 L 1 1 69Q L * I 240 L 1 1 12Q L l 1 50 L 1 1 370 L 1 II 11 I1 2" I 2 i 16,8Q I 9,9121 2" 1 3" i 17,20 1 5,848| 2" 1 4 1 17.80 1 14,774! 2" I 6 1 18,70 I 25,9931 2" * 8 1 30,IQ 1 27,692* 2" 1 10 1 36.20 * 21.7201 2" * 12 1 42,60 1 51.8501 21' 1 14 1 45.50 1 19,5651 2n * 16 * 56,65 1 39,089* 2,r 1 18. 1 63,60 1 15,264* V' I 20 i 2" I 22 ! 70,35 1 . 8,502* 78.10 l 3,9051 2" 1 24 1 85,30 1 * 31,56:0 !I I 1 11 I 1 I1 1 1 LOCATION/COMMENTS 1 I i 1 ! 1 ! 1 ! i 1 i 1 I 1 NOTE: TYPES INSULATION ( INSERT HUMBER ONLY IN TABLE ) NUMBER 1 TANK i VESSEL INSULATION METAL JACKETED 2 TANK t VESSEL INSULATION WEATHER COATING 3 PIPE INSULATION OUTSIDE WITH HETAl PROTECTIVE JACKET A PIPE INSULATION * OUTSIDE WITH WEATHER PROTECTION 5 PIPE INSULATION * INSIDE BUILDING TOTAL PLANT cost $275,675 , HUMBER 6 DUCT INSULATION METAL JACKET 7 DUCT INSULATION * WEATHER COATING 6 FURNACE INSULATION EXTERIOR OF STEEL 9 fURNACE INSULATION INSIOE FURNACE 10 BOILER JACKET INSULATION 003933 'Sherwin PLANT NAME ENGINEERING ESTIMATING SHEET FOR REKOVAL/REPIACEMENT OR REPAIR OF ASBESTOS CONTAINING INSULATING MATERIAL date 2-19-87 prepared by: G. B. Smith JIT EM I TYPE | P* REPAIR j TEAR WORK J QUANITITY |TH!CKNE$S| PIPE | UNIT COST | ITEM COST 1 j NO.(INSULATION| H* REMOVE JTO BE J | INCHES j DIA. J j | j | SEE NOTE } R* REMOVES.. (PERFORMED jl-LlNEAL Fxj jj j j j j BELOW j REPLACE \ j S-SQ FT j jj j j ttcrcssctcsssrsssrsss: 11 41 P* L 1 WC 1 2 1 2.60 1 4,628 * o CO 11 41 P1 11010 L I wc 1 3 1 3.20 * 3,232 ! 1 I 4 1 .P * 1 2500 L 1 WC 1 4 1 3.60 1 9,000 1 LOCATION/COMMENTS Replace Weather Cove Replace Weather Cove Replace Weather Cove I1 I1 41 4* I P1 P1 I 4170 L I wc 1 6 * 4.80 1 20,016 1 Replace Weather Cove I 2760 L 1 wc I 8 * 5.80 1 16,008 I Replace Weather Cove ! 1 .41 P1 I 1790 L 1 wc I 10 1 6.80 1 12,172 1 Replace Weather Cove I I 4 i ,P I 1 3660 L 1 wc 1 12 1 7.80 .1 28,548 1 Replace Weather Cove 1 t 4 1 *P 1 I 1290 L 1 wc I 14 I 9.00 I 11,610 I Replace Weather Cove 11 1I 41 4I PI PI 1 2060 L 1 wc 1 16 I 10.00 1 20,600 1 Replace Weather Cove | 710 L I wc I 18. 1 11.00 I 7,810 I Replace Weather Cove 1I II \1 11 4 1. P 41 P 41 P 1 1 I * 1 1 350 L I * 140 L 1 * 1100 L 1 11 wc 1 20 1 12.20 1 4,270 1 wc 1 22 1 13.00 1 1,820'* wc 1 24 1 14.10 1 *15,510 1 I1 I I Replace Weather Cove Replace Weather Cove Replace Weather Cove I1 I1 l ! 1I 1 II ii I I I I I *' I '1 It 1 l I l t I l- 1 1. 1 1 I 1 I .! I I I TOTAL PLANT COST $155,224 note: TYPES INSULATION ( INSERT NUMBER ONLY IN TABLE ) NUMBER 1 TANK l VESSEL INSULATION METAL JACKETED Z TANK & VESSEL INSULATION WEATHER COATING 5 PIPE INSULATION OUTSIDE WITH METAL PROTECTIVE JACKET i, PIPE INSULATION CUTSIOE WITH WEATHER PROTECTION 5 PIPE INSULATION `'JMSiDE BUILOIVG . `GRAND TOTAL $3,759,012 NUMBER 6 DUCT INSULATION KETAL JACKET T DUCT INSULATION WEATHER COATING 6 FURNACE INSULATION EXTERIOR OF STEEL S> FURNACE INSULATION INSIOE FURNACE TO BOILER JACKET INSULATION 003934