Document 3eaeJ7QxzVX633NzjKMrrbXQE

iECEIVED SEP 8 1969 UCC . CALIDRIA kino city. ca. TECHNICAL SERVICE REPORT THE EVALUATION OF ASBESTOS T-135 AS A PARTIAL --------HEPUCEMEWT"P&Tn?mWIUM "EIMIE)E"ITT A-------- ------------------PAPERMAKINff FURNISH------------------ for Weyerhaeuser Corporation Plainwell, Michigan August o, l9bff by G. L. Dickson Group Manager - W. L. Carrick Project No. H52-M33 August 29, 1969 A 17251 UNION CARBIDE CORPORATION Chemicals & Plastics Research and Development Department Niagara Falls, New York 1^302 SUBJECT This report covers the results of the paper machine evaluation of Union Carbide's Asbestos T-135 on Weyerhaeuser's (P]ainwell, Michigan) Number 2 machine, August 8, 1969. The purpose of this trial was to illustrate the effectiveness of T-135 as a partial replacement for titanium dioxide In a normal papermaking furnish, and to show the resulting economies from such a substitution. TRIAL RESULTS This trial demonstrated the ability of Asbestos T-135 to partially replace titanium dioxide in a high opaque offset paper furnish. Dur ing this trial, 20 pounds of T-135 were substituted for 25 pounds of titanium dioxide (per 1350 lb. of furnish), resulting in a savings of approximately $2.70 per beater, or $4.00 per ton of furnish. No operational problems developed during the time Asbestos T-135 was in the system, and product quality equaled that of the pre-trial period. As no attempt was made to determine the optimum replacement level of T-135 for titanium dioxide in this system, it is felt that the poten tial money savings may be considerably greater than what was reflected by the present work. Guidelines governing the maximum degree of replacement can usually be established after a moderate amount of experience has been gained with T-135. DISCUSSION The evaluation of our material was performed during the produc tion run of a 50-lb. white opaque offset paper. Previous to the addition of Asbestos T-135 to the system, their normal furnish was utilized. (Refer to Table I and the Mill Trial Data Sheets for com plete furnish and operating information.) Because of a problem Involving lower than usual wax pick tests, the trial was delayed until furnish changes were made to overcome this condition. Twenty pounds of opened T-135 (1/2 bag) were added to each beater in place of 25 lb. of titanium dioxide (1/2 bag). Based on a beater capacity of 1350 lb. of furnish, this represents an addition level of 1-1/2? T-135. No other furnish changes were made during the subsequent trial except minor ones which were considered in line with normal production varia tions. Wet end and reel samples were obtained during both the pre trial control period and trial proper. These samples were subsequently analyzed at Union Carbide's facilities in Niagara Palls, the results being presented in Tables II-IIC. Calculated retention values, based on these analytical data, are reported in Table III-IIIB. For con venience Table IV contains a summary of Weyerhaeuser's quality control report during these times. & 17 252 CONCLUSIONS This trial showed that Asbestos T-135 can be utilized success fully as a partial replacement for titanium dioxide in this mill's . normal furnish. The only precaution observed during this trial was to introduce the T-135 to the furnish after the rosin size had been precipitated by alum. Product quality remained virtually unchanged during the trial period. Opacity was 0.6 points lower (94.8-94.2) but was counterbalanced by a similar Increase in sheet brightness (81.9-82.5). This resulted in spite of a substantial drop in ash content, from 18.3* to 15.8*. The lower ash level was the result of less pigment being added to the system in the form of broke as pigment retention was improved slightly during the trial. (Refer Table III) This was especially true of asbestos which was retained better than the other mineral materials present. With additional experience it is felt that even more significant furnish savings should result from the optimum use of Asbestos T-135 on this mill's three paper machines. The present savings of $4.00 per ton of furnish was computed as follows: (1) Titanium dioxide savings 25 lb. g 22<t/lb $ 5.50 (2) Asbestos T-135 costs 20 lb. g l4<fr/lb $ 2.80 (3) Net Savings Per 1,350-lb. beater Per 2,000 lb. of furnish $ 2.70 $ 4.00 G.L. Dlckson/bsn A 1 7 253 a > b 0) E O co 60p PC C hH O V. a JC b Vi P OO EO x CE O CO P P O ft) 33 oo a* a ab. oa ft) co .* tj Oc b3 OO &i V_4 NO in 0 rH U 4 O Q id WX O w co J cn X < CO Eh M 2 X X fc. pu bo> *no O > c JC hH 3 CO X C0l, CO CO CM oCO n pn icnry *ca OH 3 JO I O CO E-I tU < m into OC EHh (3OU o o V o b to u c -H cc H CO p *a c O O CO uc ft) V P3 CO H a> X3 in cn ft) iH C1 O Eh JC la V CO 3 Vb E* oo brH Vi O a p 9) PV CO ft) C T3 ^rl (4 EO H H C4 ft) -H C ft) >iJ0 P co a c rH <H O 0CO ft) o hH ft) K> OO 4) iH 0 rt b *0 0. OCO CP EP 0 H (4 EH 3 a. ) P 0) * P O 0 OU J* C P 0 CO V 0 b O -H Vi Q, cO PV H 0 >1 3 o ft) >. p .(iHc K PTJP ti *H P H CO H ft) cO rHOO rH P 0*0 * H ft) co a) cca to t) 3c Vi CO ft) OH 0 O* *H CO > *h POO P TJ P P rl b V V H ft) ft) ft) CO 00a O TJ ft) ft) hH JC C E TJ TJ JC JC u WrlrH < CO CO co Eh C O .cco mn p HHH c1 V Eh in 3 CU Vi ft) ObO HH OH (0 Vi K HO O bWOH P ft) *o P a 3 e b ft) P 3 CO C H H O H P C CC CO CO d oop P <0 3 P CO E co p VO VO CM CM CM CM CM in in rH rH rH rH rH 0 O ON ON ON ON ON rH rH CO CO (M CVJ CM CM CM CO CO CO m cn on m CM CM a* sr O C\J oo sr CM oo CO o in o in in o in t-- o o o o oo o E CO aJ 5 m E a sss 17 254 <u E 4-> 0 CO 3bC rH 0 0 cn 0 in cn cn 0 in in in CM rH cn in in VO VO VO TABLE II Stuff Box Analyses August b, 1969 Reel Wo. Reel Time %* Ash TIP? Pre-trial Control Period 1** 11:30 AM 1*5 12:20 PM 1*6 1:00 PM 1*7 1:*0 PM 1*8 2:50 PM 1*9 3:30 PM 150 *:10 PM 151 *:*5 PM 152 5:*0 PM 153 6:20 PM Average 23.60 2*. *5 2*. 75 2*. 20 2*. 17 2*. 90 22.18 20.2* 20.63 21.69 23.08 11.59 11.55 11.52 10.86 11.05 10.82 8.67 7.90 8.39 8.91 10.13 Transitional Period 15* 6:50 PM 155 7:35 PM Average 20.61 20.** 20.52 8.81 8.11 8.*6 Asbestos T-135 Trial 156 8:30 IM 157 9:15 PM 158 9:50 IM 159 10:30 PM 160 11:05 PM Average 19.18 18.98 18.82 18.86 19.09 18.99 7.19 7.07 7.18 7.02 7.69 7.23 % Asbestos T-135 0 0 0 0 0 0 0 0 0 0 0 0.68 1.11 O.90 l.*2 1.5* 1.5* 1.5* 1.5* 1.52 A 17 25b Reel Wo. Reel Time 144 11:30 AM 145 12:20 PM 146 1:00 PM 147 1:40 FM 148 2:50 FM 149 3:30 PM 150 4:10 FM 151 4:45 FM 152 5:40 PM 153 6:20 PM Average 154 6:50 PM 155 7:35 m Average 156 8:30 PM 157 9:15 PM 158 9:50 IM 159 10:30 IM 160 11:05 FM Average TABLE HA Headbox Analyses August b, 1969~ % ** Consistency Ash TiO0 Pre-trial Control Period 0.959 1.185 0.996 0.976 0.963 0.958 0.937 0.872 0.920 0.952 0.972 32.68 34.43 3^.18 33.07 33.58 3^.77 31.85 28.37 28.33 30.16 32.14 15.91 16.74 16.83 15 M 15.76 15.91 12.45 10.85 11.65 12.50 14.41 Transitional Period 0.912 0.866 O.889 28.17 27.57 27.87 Asbestos T-135 Trial 11.61 10.34 10.98 0.806 0.832 0.8l6 0.840 0.821 0.823 26.09 25.60 24.86 24.92 25.35 25.36 9.64 9>7 9.79 8.35 9.60 9.37 % Asbestos T-135 0 0 0 0 0 0 0 0 0 0 0 0.74 1.35 1.04 1.60 1.79 1.66 1.79 1.85 1.74 (^17256 Reel No. Reel Time 144 11:30 AM 145 12:20 PM 146 1:00 FM 1^7 1:40 PM 148 2:50 m 149 3:30 PM 150 4:10 PM 151 4:45 PM 152 5:40 FM 153 6:20 PM Average 154 6:50 PM 155 7:35 PM Average 156 8:30 PM 157 9:15 PM 158 9:50 PM 159 10:30 PM l6o 11:05 R4 Average TABLE UB Tray Water Analyses August a, 1969 * ** Consistency Ash TiO, Pre-trial Control Period 0.314 0.363 0.346 0.332 0.304 0.373 0.370 0.276 0.229 0.313 0.322 55.62 56.16 57.21 56.99 56.86 56.17 53.39 52.51 54.22 51.98 55.11 26.63 28.19 27.50 28.31 27.90 25.20 21.36 20.91 23.07 22.41 25.15 Transitional Period 0.262 0.252 0.257 51.88 51.03 51.46 21.95 19.72 20.84 Asbestos T-135 Trial 0.215 0.217 0.224 0.277 0.264 0.239 50.30 49.92 46.30 46.78 47.13 48.08 19.00 19.64 15.41 17-15 16.74 17.59 $ Asbestos T-135 0 0 0 0 0 0 0 0 0 0 0 1.11 2.40 1.76 3.14 3.33 3.02 3.20 3.26 3.19 A 17257 TABLE IIC Reel No. Heel Samples Analyses August 8,1969 Reel Time ** Ash Ti0o Pre--trial Control Period 141+ 11:30 AM 145 12:20 PM 146 1:00 IW 147 1:40 PM 148 2:50 PM 149 3:30 PM 150 4:10 H4 151 4:45 m 152 5:40 PM 153 6:20 PM Average 19-36 19-11 19.86 19.89 18.90 19.79 17.77 16.88 16.34 17.34 18.52 8.05 8.62 8.67 8.51 7.44 7.62 6.43 5.96 5.98 6.87 7.42 Transitional Period 154 6:50 PM 155 7:35 PM Average 17.13 16.52 16.82 6.36 6.18 6.27 Asbestos T-135 Trial 156 8:35 Bt 157 9:15 PM 158 9:50 PM 159 10:30 PM l6o 11:05 PM Average No Sample 15.72 5.45 15.82 5.41 15.67 5.29 No Sample 15.74 5.38 $ Asbestos T-135 0 0 0 0 0 0 0 0 0 0 0 0.43 0.92 o.6e 1.29 1.36 1.42 1.36 A 17258 TABLE III Overrall Filler Retention (Reel/Stuff Box x'100) Reel No. %% Reel Time Ash TiOo Pre-trial Control 144 145 146 147 148 149 150 151 152 153 Average 11:30 a.m. 12;20 p.m. 1:00 p.m. 1:40 p.m. 2:50 p.m. 3:30 p.m. 4:10 p.m. 4:45 p.m. 5:40 p.m. 6: 20 p.m. 82.0 78.2 80.2 82.2 78.2 79.5 80.1 83.4 79.2 79.9 80.2 69.5 74.6 75.3 78.4 67.3 70.4 74.2 75-4 71.3 77.1 73.2 7. Asbestos T-135 - - - - - - - - 154 155 Average Transitional Period 6:50 p.m. 7:35 p.m. 83.1 80.8 82.0 72.2 76.2 74.1 63.2 82.9 75.6 Asbestos; T-135 Trial 156 157 158 159 160 Average 8:30 p.m. 9:15 p m 9:50 p.m. 10:30 p.m. 11:05 p Q No Reel Sample 82.8 77.1 84.1 75.3 83.1 75.4 No Reel Sample 82.9 74.4 90.8 88.3 92.2 89.5 A 17 259 TABLE III-A One-Pass Filler Retention (Reel/Headbox) x 100 Reel 7. X X Asbestos No. Reel Time Ash TiO? T-135 Pre -trial Control Period 144 145 146 147 148 149 150 151 152 153 Average 11:30 a.m. 12:20 p.m. 1:00 p.m. 1:40 p.m. 2:50 p.m. 3:30 p.m. 4:10 p.m. 4:45 p.m. 5:40 p.m. 6:20 p.m. 59.2 55.5 58.1 60.1 56.3 56.9 55.8 59.5 57.7 57.5 57.6 50.6 51.5 51.5 55.0 47.2 47.9 51.6 54.9 51.3 55.0 51.5 * - Transitional Period 154 155 Average 6:50 p.m. 7:35 p.m. 60.8 59.9 60.4 54.8 59.8 57.1 58.1 68.1 65.4 Asbestos T-135 Trial 156 157 158 159 160 Average 8:30 p.m. 9:15 p .m. 9:50 p.m. 10:30 p.m. 11:05 p.m. No Reel Sample 61.4 57.6 63.6 55.3 62.9 63.4 No Reel Sample 62.1 57.4 72.1 81.9 79.3 78.2 A1726C TABLE III-B Hire Retention 1 - (C Tray water/C Headbox^ x Reel Total 7. 7. No. Reel Time Solids Ash TiO: Pre-trial Control Period 144 145 146 147 148 149 150 151 152 153 Average 11:30 a.m. 12:20 p.m. 1:00 p.m. 1:40 p.m. 2:50 p.m. 3:30 p.m. 4:10 pirn. 4:45 p.m. 5:40 p.m. 6:20 p.m. 67.2 69.4 65.3 66.0 68.4 61.1 60.5 68-4 75.1 67.1 64.9 44.3 50.0 41.9 41.4 46.6 37.1 33.8 41.4 52.4 43.3 43.2 45.2 48.4 43.2 37.7 44.1 38.3 32.3 39.0 50.7 41.1 42.2 Asbestos T-135 Transitional Period 154 155 Average 6:50 p.m. 7:35 p.m. 71.3 70.9 71.1 47.1 46.1 46.6 45.7 44.5 45.1 56.9 48.3 51.1 Asbestos T-135 Trial 156 8:30 p.m. 157 9:15 p m 158 9:50 p.m. 159 10:30 p .m. 160 11:05 p m Average 73.3 73.9 72.6 67.0 67.8 71.0 48.6 49.2 48.9 38.1 40.2 45.0 47.4 45.9 56.8 32.3 43.9 45.5 47.7 51.5 50.1 41.1 43.3 46.8 A17261 7 26 O c. QUALITY CONTROL DATAI A ugust t), 9b9 OS c CV M CM mo cm o cnar - cn o In cn ar oo mar ss oo in in CM CM oo cn ay CM *H o cn i--l I xbcO ma h v uc CD H H OO Cl w| cl CO iH I no *-i a. xo 3cti -H O, m iH ooo o o O O ON 1 1 1 rH CM CM CM CM CM CM H x01; CO CO OO CO CO CO CO CO c fe. E 3 >V o o H 4) u 3 a> tcor a. a| o cd H >>l u w E-< 4> E 0I) Obe fc, a, co oinoooinooooom coco oo n om-- onoo no no t--co (MrlrlrlrlrtrtHrtrlHH HiHCMiHiHCMCOmCOCOCnCM inininoinoinoino inco mminminmarar mar zr ar ON CNONONOnOnONOnONONON a o --H t, V CL, co H 4-> a c cd t* E-i CO C- COO Of--coot-- t-- C-- ON > J CMCMCMOCMCMHiHOCMCMH .3- ay ar ay a-a-fl-jra-jra-a' o in oo 1 CM CM GO CO OOO vo vo vo HHH m on m mo cm m ca\- acjr\ anr co t-- m S' CM co ayayar o O in c 1 1 i CM CM cm mr CO CO co oo cc o in C 1 1 vo in LTV VO in ft r-t r-t rS r-t r-t r-- cd U Ch CO CO | COrti in co, l Eh no ooininooc U 3-3'3-q-iria'VOir n ON ON ON on on CN ON o a> jcoo c f-coo O O O CO c O CM CM co CO CO CM CN ZT ZT ST zr ^ 4J JC. rt bC C01d <HD CD S o in cm co cm o co o inco c-- f-- o r-- OOHONOOOOCOSOOOl inininar in in-a- ar ar in mar cm coco i-lOO ON mar ar c*-cooo inco co c~- ir C--CO O >H ONCO O C ar ar m ma- ar nir H 0)1 0) El eO -EHh II a> Ka> Zo O 4) a co E Ei cd a oin oco o cm oo o a- o oo mo mcoHaa o cm mvoOHCMH rH CM may . 0hO) cd u Q) > < ararmvo t--oo ono hcm co ar ar ar ar ar ar ar m rn rn m aE o in in co to no tn- cud 0) > < ar m mm Ea ` Es cd o moommoc COrlmCOOaCOr- CO ONON O H H (M I- NO f--CO ON O r-t CM CC mmm in no no no nc TABLE IV (CONTD X C c to M Or S so in CM s o m OV rH P sz a bo a H t, c CO o in o 1 m c\j CM CO CO CO in CM CO x: ** n < oO * 1 vo 1 vo H CO in rH 1 xo Cti ^rl 3 a.| CM H rl CM CM CM iH H rH rH rH rH >> p o o mo o cm H o -=r acd ON ON ON ON ON ON a o u 0) DJ ooosin ucd msr cm mcM m cv P o JO rl bCf to rl 0c3d 3o: cnj maoocvioo O Ov 0\0nH C\ in -=t -a- -=r A 1 7263 rH d> a> E 0) <H BC Eh E aS o o o o in abso m in m cm o as r.H...c..m...m...-.=..r...i.n. uto > < a> l a- in vo c--oo a> o| vo vo vo vo vo CC7SI HHHHH o A 17264 f-t cm rna- m vo > 9) C rt p jaoc S av joc 0E) pC>Q1 CO pco p aut aauaatt xo o p 03 OJ O 2 i O o at E J4Z) V CO I te2aMkd UNIOM CARBIDE CORPORATION MINING A METALS DIVISION MILL TRIAL DATA SHEET August 8, 1969 I. COMPANY LOCATION AND DATE OF TR1AI WeyerhaeuserCo.j_Plalnwellt Mich.---II. company REPRESENTATIVES and tities Glen Ketchum, Project Engineer,-------- --- Lou Burd, Stock Preparation Superintendent, Emil Waraez, Paper Mill Superintendent ill. UCC pfpbpsfmtativfs R* T. Scott and G. L. Dickson iv. trial objectives (in order of importnnre)Evaluation of Asbestos T-135 as a partial replacement for titanium dioxide v. product identification Type of Product--!__ White -OffsetCoated JMUJ'No Grade Montgomery onaoue blue white Basis Weight 50 and 60 lb Daily Production 75000 lb.I h /hour 3 f 000 Total Daily Production of Mill" (Tissue and Board) No. of PlysZ. VI. MACHINE DESCRIPTION Type of Mqcfrin Fourdrlnler. open headbox. dandy roll Machine No2(Cylinder) No. of Cylinders" Machine Speed___ ________________(Tissue) Reel Speed" (Tissue) % Crepe~Wire Mesh Plastic Wire Width____________ _______________________ Machine Trim 90-1/2 Inches Sire Press.Horizontal 8-10t StarchTnUnders Double stack: Vellum Finish - 1 & 0 Smooth Finish - 5 & 6 A 1726b i ') VII. AUXILIARY EQUIPMENT Rafkiwt Tiff* 1 Jordan Ucrtw Afte* beater chest Mini (amp.) 80 Saveall (Type)DlflP.' __!--Flow Rate----------------------- =--------------------- VIII. STOCK PREPARATION - Continuous or Botch Type Beater and f>ipnrity Hollander at_about _ 1350_Hl*______________ No. of Beater Chests and rarity 1 Beater chest at about 2700 lb. Machine Chest Capacity___________ T__________________________________________________ Stock Freeness (Mach. Chest and Stuff Box)_____ "____________________________________ Headbox C-nnsi<f*ni-y 08--12^_________________________________________ Makeup pHMachine pH_____ ^ 5**^ 8 IX. FURNISH MAKEUP* Basis (Ib./ton, etc.)_____________________________________________________ Furnish CanctHwWiI Fiber Components: % hmdi ________ Short fiber ________ Broke________ 20-,i0jt_ 70-80t ______________________________ __________ ; Retention Aid __________ Approx. 0.5 lb./ton Wet end starch __________ Not recorded Defoamer Dyes_________________ __________ __________ Not recorded As required -Basin site_________ .Almn_________ : -Qpaclflers______ See attached schedule * For board tytt.ms Include fumich far each medium foplin.r, und.Hin.r, flll.r, and badtliner. A17 2 6 6 2 X ASBESTOS ADDITION - Pellet Repulper (Type). None required Asbestos firndu T-135 Open In* Point of AriHiHon. Hollander., bester Pounds of Asbestos Added _^_=lP___per ton BDF_P. per beater Per cent asbestos addition on BDF. per hour l-i/it XI. SUPPLEMENTARY INFORMATION Quality Control Data Record Stock Prep. Log Sampling (in order of importance) PHch 4 Retention Trials Reel Stuff box Headbox 250-ml. sample Troy 500-ml. sample Bmmrd Triali Tray Water Vat Stuff box Reel TUmm mnd T*w*t Stuff box Reel Headbox Saveall effluent Saveall effluent Saveall influent Saveall influent Identify samples by name, date, time Wet samples should approximate 500 ml. Weight of BD filter pad is required for all vat, tray, and saveall samples. A 17267 3 ) XII. TRIAL LOG (Comments including changes in furnish and oi<erating conditions) Thm 8/7/69 Number 2 machine on 40- and 50-lb. Montgomery opaque, smooth finish. 8/8/69 10:50 a.m. Change to 50 lb. Montgomery opaque, vellum finish. One beater furnished with Asbestos T-135 by mistake. Trial delayed because of low wax pick test results. 1:00 p.m. Slight problem with foam. 3:30 p.m. Short fiber component of furnish Increased from 20% to 30% In order to Improve wax pick. 5:00 p.m. Smoothing press raised because of minor buildup on roll. 6:30 p.m. Asbestos T-135 trial Initiated. First beater dumped with twice the required amount of T-135 in order to shorten transition period. 7:30 p.m. Smoothing press lowered. No problem with stock buildup. 5:15 a.m. Change to 60-lb. Montgomery opaque, vellum finish. Date----_ DISTRIBUTION LIST M. P. Ballmer B. K. Barton W. L. Carrick P. D. Dexter G. L. Dickson B. D. Dobbs T. E. Dougherty C. F. Gray W. V, Gutzmer P. G. Horecka R. T. Larkin J. K, Marshall J, S. McReynolds R. A. Miller G. J. Norberg E. J. O'Keeffe T. R, Orme s J. L. Myers/,/^ J. A, Riddle H. B. Rhodes R. T. Scott N. J. Setter J. Sidlovsky R. M. Tons; C. A. Wilson W. S. Young J. Ulrey New York Chicago Bound Brook New York Niagara Falls Cincinnati New York New York Chicago Detroit Seattle Charlotte Houston Atlanta Charlotte Dallas Los Angeles King City King City Niagara Falls Detroit New York New York New York Chicago New York Bound Brook *17269