Anniston Plant
'
( TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Anniston ; ^
A. H. Hill G. L. Jessee .. L. C. Lahman J. C. Landwehr G. W. Miller H. Schulte W. F. Taffee H. L. Williams
Month
Summary December 1969
Cost Improvement Results
Est. Act. $57,515
Target $65,085
% of Target 88.4%
General Offices
YTD
$591,846
$638,915
92.6%
H. S. Bergen H. C. Carder
/ . Darrna (5)
_. B. Hodges D, B. Hosmer (2) W. A. Kuhn C. F. Luecke J. A. Morgan W. R. Robirds J. E, Smith J. A. Stephens R. J. Stratmeyer
Organic Division
Combined Production and TSD efforts to improve yields in the PNP Department have resulted in the best PNCB usage for any 1969 month.
Agricultural Division
Parathion recovery pilot test facilities were installed and checked out. Field tests are scheduled to begin January 7.
OTHER LOCATIONS
A. H. Forsten -- Alvin, Texas
Plant Improvement
Solid Incinerator Project (AFE 3094 - $20.0M) was approved. Corrosion proof channel in plant drainage to Snow's Creek (AFE 3088 - $8.7M) to protect City Water Main was completed and put in service.
D. W. Jackson .. WGK
v. i'. m. Patrick -. So. 2nd St.
DSW 377498
AN-306 REV. 11/1/1968
"'T..
COMPANY CONFIDENTIAL INFORMATION V
"This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant
to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written
approval and the recipient is accountable for its safe keeping, exerpting or otherwise disclosing of its contents and for its proper disposal."
STLCOPCB4099230
Company Confidential 2.
Utilities
Actual savings in 1969 for Utilities Cost Improvement will reach $10.8M ($20.2M/yearly rate).
Design & Drafting
The old 175 KVA Niran Emergency Generator was rebuilt and
returned to Plant. Installation is scheduled to be completed
in January.
#
Pollution Control
>
KemTech Labs Inc. conducted a three day Air Pollution Survey in.areas in and around the Anniston Plant.
Quality Control
The Plant Quality Score was 80.2, up 2,2 from November, with a YTD score of 86.6 against a 1969 target of 95.0. A Process Capability Audit was completed, revealing restrictive speci fications in 19 out of 44 finished product control tests.
C. Landwehr
OS\N 377499
STLCOPCB4099231
ORGANIC DIVISION 1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Sol.Aro.Level TAR
Ind.& -Still SpG EST
AFE 3015
ACT
Solid Aro.
TAR
Lower 5060 Soft. Point
EST. ACT
2250 2250 250 2250 250. 2250 2250 2250 2250
-- --
" "' -
"
2600 2600 2600 2600 2600 2600 2600 .2600 2600 1500 5490 4390' 215C 467 C 800C 4230 773O 3475 1500 5490 4890 2150 467 C 800C 4;oU 773b 3475
-
--
Sol.Aro.-Still Coolant temp.
AFE 3015
TAR EST ACT
160 -
170 -.
160 170 . *
160 "
170
160 "
170
160
** "
S ol.Aro. -Chlortor TAR
Batch End
EST \
AFE 3015
ACT
390 390 390 390 390 390 390 390 390
-*-
-- --"
--"
Sol.Aro. Yield TAR
SW/R Composition EST.
AFE 3016
ACT
2750 2750 2750 2750 2750 2750 2750 2750
-
"--
*"
"
Solid Aro. Montar 5 Flake AFE 2949
TAR EST ACT
1080 1080 1080 1080 1080 1080 1080 1080
- -- "
--
--
Sol .Aro. Blend 4465
TAR EST.
ACT
2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 5.00. 500
1690 1920 1630 1490 710 1180 990 220 1690 1920 1680 1490 710 1180 990 220
--
10 710 350 10 710
Sol.Aro.-Verti- TAR
cal Still Cond. EST-
AFE 2324
ACT
70 80 70 80 70 70 90 90 9 0 90 - ' 70 90 90 90 90 -
"
Sol .Aro.Cl2 T/C Dock AFE 2342
TAR EST. ACT
940 940 950 0 --
0
Sol.Aro.-New Cl2 TAR Unload - No Delay Irst-
CED 1831
ACT
950 940 950 940 950 940 950 900 2330 2050 2320 1650 2360 164C 2180 900 2 330 P050 2320 1650 2360 1640
Solid Aro.-Flake TAR
& Drum
EST.
CED 1430
ACT
3000 3000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000
OOO
0 0 1000 2000 2000 2000
000
3000 3000 300( 3000
0 0 1000 2000 200C 3000 300c 3000 3000 3000 3000
Liq.Aro.
TAR 3000 3000
48-53 M #/yr. AFE 2545
ESI. ACT
0 550C 0 550C
-- -- --
Liq.Aro."No.2
TAR
Still Entrain Sep. est:
3000 3000 --
AFE 3093
ACT
Liq.Aro. -Montar TAR
Disposal
EST.'
AFE 2952
ACT
*
1080 1080 1080 1080 1080 1080 1080 1080 1080 1080
0 00
0 0 0 - - -
0 00
0 0 - - -- "
Warehouse Reduce Manpower CEA 1452
TAR EST: ACT
2000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 200C 3000 3000 3OOO 3000 300C 300C 3000 3000 3000 2000 200C 2000 3000 3000 3000 3000 3OOO 3000 3000 3000
Liq.Aro.New
TAR
Burners #3 Still EST
ACT
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
0
0 1500 3000 900 0
-
0 0 ~
0 0 1500 3000 900 - -
0 --:
Biphenyl Relocate TAR
No. 1 Preheat EST
CEA 1892
ACT
HB-40
TAR
2nd Autoclave AFE 3102
EST ACT
500 500 500 500 500 500 500 500 500 500 500 500
1500 150C
0 1560 1870 0 6 10 187 0
0 0
00 0 150c
-
0 1780 1780 __ 1780
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
2236 2580 0 3490 24 2 q 0
600 600
9000 10,40C
6000 8600
42UU /4jU 6950
5uu 1000 4b00 750 1400 4800
6000
DSW 377500
STLCOPCB4099232
ORGANIC DIVISION 1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG . SEP OCT__ NOV DEC
Bi0 Improve Tower Treat. AFE 5155 Improve Pit. Power Factor
TAR
EST ACT TAR EST ACT
450 0 0
900 0 0
450 0
0
900 500 500
450
0
900 900 83O
450 584 585
900 VUif 990
450
645 645
900 900
980
450 50
50 900 950 940
450 450 | 725 700 725
900 900 955 . 950 955
Central Air
TAR
1000 1000 1000 1000
System
EST ACT
:_
Optimize Rx Time PNP
TAR EST ACT
2500 2500 2500 2500 2500 2500 2500 2500 2500 25 00 2500
0 3420 0
0 0 2940 12ur 0
0 0 4130
0 3420 0
0 0 2940 2370 0
00
Reduce Mole
Ratio NaOH/PNCB PNP
TAR EST ACT
4000 4000 4000 4000 4000 4000 4000 4000 4000
0
00
0U0
00 0
0
00 0 0 0
00
New Wash Water Pump PNP AFE 2998 Automatic pH Control PNP
TAR EST ACT TAR EST ACT
50 50 50 50 50 50 50 50 25 50 50 50 50 50 50 50 50 50 50 25 50 50 50 50 50 50 50 50 50
500 500 500 00 0
00
HC1 Filter Pump
TAR 330 330 340 EST 330 33O 340 ACT 330 330 340
New Blow Tank HC1
TAR EST ACT
200 200 200 200 200 200 200 200 200 200 500 200 200 200 200 200 200 200
150,000 Gal.-HCl Storage Tank AFE 2468 Produce Staley Grade Acid AFE 5076 ClaPlt. Shutdown
CEA 1851
TAR EST ACT TAR EST ACT
TAR EST ACT
.
1760 1760 1780 1760 1760 1780 1760 1760 1780
U
0 2640 3290 2990 3500 3500 3500
0 2830 34 30 3125 3200 3700
780 790 790 780 780 790 --- "
-
8880 8880 8880 8880 8880 8880 8880 8880 6655 +2385 L9900 V1990C 19900 L990C 19900 223C 6655 +2855 19900 1990C 19900 L9900
Hg Recover from Residue
TAR EST ACT
250 250 250 250
3910 0 3910 0
00 00
Hg Wash Tank
AFE 2802 Biphenyl Productivity
Total Organic By Month M $
Total Organic YTD M $
TAR EST ACT TAR EST ACT
TAR
EST ACT TAR EST ACT
250 250 250 250
00 00
00 00
15600 5600 5600 5600 5600 5600 5600 TSoo 5600 5600 5600 5600
0 9u0u 15,OCX. 1800 5900 13500
0 0
0 0
0 3578S l2700, 0 0 3078C 27001 0
00 00
0
23-3 26.3 29.3 37.5 42.3 51.1 51.6! 51.6! 51.6 .5253.5 50.6
27.1 30.2 11.5 36.3 39.^5 107.4 53^+4(49.41+ 40820ti<=,56C ^0380 16.5 23.3 27.8 11.4 25.75 45.9 110.22 258J6i51.930 40410^7340 L
23.3' 50.1179.4 116.9 159.& 2107; 1?5U .315- 365.1 |417.8 !47 1.3521.9
4679] 78.8 79.6 115.9 144.4 258.5
36&fr I412.2C458.35^09^41.
16.5! 40.3163.1
79.5
105.2
151.1 261.3a - - -
--
3 71-3 8 411'79|4 59132
-- *-----------
--
* S-P--P7955 adj*ustment included for Ma^y
6:
. Tiinp^
** $27,780 adjustment included for months
January thru June.
DSW 377501
STLCOPCB4099233
AG DIVISION 1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Cooling Tower Repiping AFE 2598 Optimize N2 & Cl2 Levels
TAR
EST -ACT
TAR
EST ACT
420 420 410 410 420 420 410 420 420
0 00
00
0
O0O
0 00
00
0 . 0- O
6600 6700 67 00 6600 6700 67 00
0 00 0 00
00 00
0 0
Increase Waste Acid Sales
TAR EST -act
400 300 300 400 300 300 400 300 3Q0 . .
00
0
0 00
00
0
00
0
0
00
00
Chlorinator R.I. AFE 2244
TAR EST ACT :
250 250 250 250: 250 250
-
00 00
0 0
00 00
O
EVOP Condensation Rx.
TAR EST ACT
750 750 500 0 0 12,615 0 0 12,615
500 750 750 0 0 2165 00
Cl2 Unloading CEA 1851
TAR EST ACT
5000 5000 5000 2000 2000 2000 0 0 1580 730 4150 3800 0 0 1580 730 4150
Recycle Wash Water AFE 2960 Parathion Recovery
AFE 2655 Reduce Acetone Losses
Formulations
AFE 2897
TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT
290 290 290 290 290 -29.0
00
0
00
0
0 0 0 00
5800 5800 5800
00
0
00
4300:4300 4300 0; 0 1050 Oj 0
1600 1600 11600 1600 1600 1600
!
3000 6600 10,0a 4570 2000 3950 1000
^300 10/00 928E 4570 1205 2675 950
Change Cooling H^O Item 737 AFE 5067 Well H^O to Jets
TAR EST ACT TAR EST ACT
125 125 125 125 125 125 125 125 125 120 130 155 272 333 310 218 240 220 120 180 171 272 333 310 220 300
500 500 500 O OO 00
Ag. Division by Month
TAR EST
750
750 500 9145 9145 12/15 3,12C 6,730
91^5 10,155
1A 75 4842
14685 4033
14685 Iplt
14575 8872
1 LLR 5 14485 4920 7235
ACT
0 0 12/15 + ,433 10/30 9459 484: >6488 L3435 8825 5535
Ag. Division
TAR
YTD EST
ACT
Ag. Division
TAR
untargeted-R.M.
EST
Charges optimizati< ,rACT
750
1500
P000 12,615
111 45 15,735
P0P90 23,315
P9WS 441 on 37/70 41,916
53785 43,949
73470 3 8 045 10253: 63114 59/12 74584
117015 32434
0 0 12,615 17,035 27/15 57.07441,936 48,4% SQ839 59,664 75199
0 1700 3690 287C 1700 3690 287C
530 530
Organic Div.
TAR
Untargeted - HC1 EST
Catch Tank& Coalec eCT
0 00 0 5000 6250 596C 4690 1330C 700C 6500 2000
0 9J5C 6817 4920 L5355 6500 7080
Ag Div.-Untargeted TAR
jy'J ^12 Change out
EST ACT
4180 4055 zoe;vn 4180 4055 555
Organic Division
TAR
uncargetea -optimise EST
Reactor Variabies-I]NP ACT
DSW 377502
2740
STLCOPCB4099234
Company Confidential 3.
AROCLOR
C. R. MeI1wain, E. E. Bowles, (V. R. Haupt)
Evaluate QuaterphenylPolyphenyl Effects on Solid Aroclor Yields
1969 Savings - $63,200 NFC - $14,000
TSD Objective B-8(a)_________
The #9 chlorinator - #4 still system will be used primarily for Aroclor 1268 in 1970. Data on specific gravity of 1168 and 1268 will be obtained on the next production run to calibrate the nuclear specific gravity quality instrumentation to these materials.
This type of instrumentation has been incorporated in the Solid Aroclor expansion project CEA 2080 and will be calibrated during the start-up.
Porocel Columns CEP 2132'Technical AssistanceTSD Job No. 930
This CED project will be closed during the month of January 1970. Several small items will be completed by plant forces.
Production is still experiencing problems with the power factor instrument. Tests thus far have not found the source. Further testing is continuing.
BIPHENYL-SANTOWAX
W. G. Niemeyer, D. A. Self, (V. R. Haupt)
Biphenyl-Santowax MIPPlanningTSD Objective B-7(a)
The Manufacturing Improvement Plan for Biphenyl-Santowax is 50% complete. MIP will be completed in January 1970.
Eliminate Safety Hazards at No. 1 Benzene Feed TankSafety
TSD Job No. 976
AFE No. 3373 was issued on December 3, 1969, to eliminate the safety hazards at No. 1 Benzene Feed Tank.
Customer Assistance to Constellation Finishes, Dalton, GeorgiaSales SupportTSD Job No. 904
Provided cost information on conversion from flaked biphenyl to molten bulk biphenyl storage. TSD supplied this service to meet competition from Geneva Chemicals.
DSW 377503
STLCOPCB4099235
Company Confidential 4.
BIPHENYL-SANTOWAX - continued
Santowax R - Solid Aroclor
.
Yield Test RunYield SavingsTSD Job No, 984
A test run was planned to determine how high and low quaterphenyl content
of Santowax R affects Solid Aroclor yield. At least 10 Solid Aroclor still
batches will be run on both high and low quaterphenyl Santowax R raw
material. The Solid Aroclor still yield will be measured directly by stick
ing the still receiver. This type of test run will require cooperation of
both Aroclor and Santowax production personnel. TSD will monitor the test
and collect test data.
.
HCl L. 0. Chambers, K. G. Hale, (A. G. McCarty)
Production of Staley Grade New Earnings - $288M Acid - AFE 3076;;Potential Savings $71,000
TSD Objective B-10(c)
Carbon treatment studies were delayed until an adequate analytical procedure can be developed. Attempts at using a Jacksonville University instrument (Beckman DBG) failed. The instrument had poor resolution and would not separate the contaminants absorbed at different wave lengths.
Initial results of a Perkin Elmer - Model 124 Scanning UV instrument demon strated in the plant looks good. The PR&D group will continue evaluation for purchase of the instrument (estimated cost $3-4M).
. HCl MIP
TSD Objective ________________________Planning_____________________________ B-l (b)
All review comments returned. Final plan will be issued in January 1970.
Muriatic Acid Reduced High ChlorineQualityTSD Job No. 950
Rotameter has been delivered to permit maintenance to complete installation to air blow #7 storage tank to reduce free chlorine. This is an interim measure until process data can be collected to identify cause of intermittent high chlorine.
PNP L, O. Chambers, K. G. Hale, (A. G. McCarty)
PNP Dust Flammability
Safety (S&PP Audit)
TSD Job No. 814
Final report has been written and is now being circulated in plant for comments prior to typing.
3TT5a os'M
STLCOPCB4099236
Company Confidential 5.
PNP - continued
PNP=Sulfuric Acid Unloading Pump
Safety (S&PP Audit)
TSD Job No. 979
Project premise for pump unloading was not approved by Production because of potential problems with pump as compared to present trouble - free air unloading. Alternate means of minimizing safety hazards (flange guards) will be initiated by Production. TSD report is out for comments, and will be issued by mid-January.
PNP - Debottleneck Capacity______________________ ;TSD Job No. 482
The actual present capacity is being evaluated iii the different process steps. Alternates for expanding to 2.0M and 2.4M #PNP/month are being developed. Summary of alternates, expected capital required, and present capacities is targeted by mid-January.
NIRAN
D. W. Dudley, T. W. Lawrence, (A. G. McCarty)
Demonstrate Parathion
.
Recovery__________________________________
TSD Objective B-5(a)
Parathion recovery test facilities completely installed. Initial tests will begin in early January and are expected to last approximately two months.
Acetone
Savings $25,200
TSD Objective
Recovery20% Reduced CODB-5 (i)_______________________________________ __
Acetone recovery project is operating near design conditions. No pump out. problems have occurred through 677 batches. Acetone yield for December was 6.18 lb./cwt compared to a 7,25 lb./cwt standard. After a piping modi fication in early December, acetone usage fell to 5.88 lb./cwt, close to the target of 5.18 lb./cwt. Optimization of ejector performance and repair ing vacuum leaks allow 100 mm Hg abs. will further improve acetone usage toward the targeted 5.18 lb./cwt.
Improve Chlorinator Cooling System______
Potential savings $50,000 per 0.5 hour reduction in chlorination time
TSD Objective B-5(g)
A Tentative Process Amendment has been approved in th e plant and is await ing Division approval. A project premise, based on the use of Freon 21 in place of Freon 11, and an experimental expense AFE have been approved. Mechan ical design is in progress for temporary cylinder racks and piping. A spare vacuum pump, for use during the test, is available in the plant. Field tests are targeted to begin in late February and to last through May.
DSW 377505
STLCOPCB4099237
Company Confidential 6.
NIRAN - continued
Chlorinator Off-Gas System Modification
______________ SafetyTSD Job No. 980
Investigation is continuing on means to completely el iminate violent de compositions and subsequent damage to equipment in the chlorinator off gas systems. Evaluation of an entrainment separator to preclude unstable material from catch-pots and piping showed this concept to be of question able value. Efforts are now being directed toward preventing the mixing of steam and water from the jets and direct contact after-condensers with the unstable material accumulated in the catch pots. Alternates have been developed and will be discussed with Manufacturing in January.
Replace Nitrogen with
Potential Savings
HCl for Chlorination Sparge $20,000TSD Job No. 603
A Tentative Process Amendment has been prepared and is circulating for approval in the plant. Plans are to test the concept in the early part of the upcoming methyl run.
PROCESS AND QUALITY ANALYSIS
J. L. Murphree, (W. B. Dunlap)
Process Surveillance
The first Process Capability Report was completed, revealing restrictive specifications in 19 out of 44 quality specifications. A process correlation study was begun in Aroclors to determine critical operating variables.
PNP - Identification of
Potential Savings
Critical Variables'$60,000TSD Job No. 839
TSD Objective C-3
Experimental operation of the PNP reactor was carried out through December at one optimization setting indicated by process analysis study of summer 1969. PNCB usage, calculated from batch weights, dropped from 117.6 to 115.3. A cost improvement target of $46,000 has been set for this job in 1970.
Niran Still Control______ Potential Savings $79,000TSD Job No. 964
Installation of control instruments is underway. Target dates have been advanced for installation (1/15/70) and completion of the still control study (8/1/70). A review of the study was held with Production personnel.
ENGINEERING DESIGN AND SERVICES
Mechanical/Electrical/Instrument Design & Drafting
J. C. Price, G. W. Richey, R. V. Carlisle, J. K. Rennie, (W. F.. Taffee)
J. A. Veazey B. D. Morgan R. L. Brewer
The rebuilding of the existing 175 KW Niran Generator was completed and the unit was returned on 12/22/69. Installation is about 50% complete with
DSW 377506 STLCOPCB4099238
ENGINEERING DESIGN AND SERVICES - continued
Company Confidential 7.
Start-up scheduled for spring turnaround.
Three projects covering the purchase and installation of additional Emergency Radios (AFE's 3389, 3390, 3391 - $0.8M each) were forwarded and approvedso as to extend emergency radio coverage to P2S5' Biphenyl and Shipping.
Two projects were scoped and estimated. Replace Sight Glasses (AFE 3362 $2.5M), OMP Dismantling (AFE 3359 - $27M).
Significant department effort was expended in compilation and review of material necessary for inclusion in the Anniston "L" Manual. Specific areas reviewed included: Electrical, Material Handling, Piping and Protective Linings.
All long delivery items are on order and installations are tentatively scheduled for spring turnaround (Niran) on the following projects: Modify Agitator Interlocks (AFE 3118 - $9.7M), Automatic Alcohol Feed to Thio Acid Reactors (AFE 3161 - $3.9M).
Drafting
In progress:
Eliminate Safety Hazards #1 Benzene Tank (AFE 3373 - $9.0M), Update Plant Single-Line Diagram.
Review drawings were completed for the following projects: Formulation Revision - Niran (AFE 2754 - $22.8M).
Construction drawings were completed for the following projects: Niran Soda Ash Deluge System (AFE 3149 - $1.4M), Aroclor - Eliminate Head-Knocker (AFE 3364 - $1.1M), Niran Agitator Interlocks (AFE 3118 - $9.7M), Niran Automatic Still Control Test (AFE 3347 - $2.2M).
UTILITIES ENGINEERING
J. C. Price, (W. F. Taffee)
Completed first draft of progress report on Utilities Cost Improvement Results for 1969 and Plans for 1970. This report was discussed with W. E. Chandler and is being revised and will be published in January. Utilities Cost Improvement Actual Savings for 1969 will reach $10,8M ($20.2M/year). Furnished CED with operating data for Aroclor PNP cooling tower -for use in design of HB-40 Expansion.
0S\N 1501 STLCOPCB4099239
.Company Confidential 6
PLANT IMPROVEMENT
G. C. Goodwin, (W. F. Taffee)
A project to Install Solids Incinerator at Plaint Dump (AFE 3094 - $20M) was approved during December. Transmittal of design package is scheduled for mid-February with equipment delivery expected in February.
Construction of Corrosion-Proof Channel to Protect City Water Main (AFE 3088 - $8.7M) was completed and put into service during December.
Design packages for Renovating Niran Control Room (AFE 3369 - $19.5M) and Automatic Fail-Safe Valves on Storage Tanks - Niran (AFE 3326 - $9.0M) were deferred by the Agricultural Division due to limited capital money.
The final design package for Grating Over Niran Process Trench (AFE 3367 $3.1M) was transmitted during the month.
POLLUTION CONTROL
E. G. Wright, (W. F. Taffee)
Air and H20 Pollution
Community and Governmental
ComplaintsRelationsTSD Objective B-2
No H20 pollution complaints were received during December. Four (4) air pollution complaints were received during the month.
Eimco Filter Unit
TSD Objective F-4
at Waste TreatmentProduction AssistanceTSD Job No. 808
The Eimco representative visited the plant during December to aid in resolving the problem of cloth "blinding." As a result of his recommendation, the feed slurry was "thickened" and the unit's performance improved a significant amount. Addition of the Betz polyelectrolyte also increased the unit's effi ciency. During January, further tests are scheduled in order to optimize the process. It is tentatively scheduled to release the unit to Production by February 1.
Air Sampling SlurryPollution AbatementTSD Objective C-2
On December 15, 16, 17 a representative from Kem-Tech Laboratories conducted an air survey around the plant perimeter using their mobile laboratory. We should be in receipt of their report during early January.
HC1 Neutralization Pit.Pollution AbatementTSD Objective F-4
Since repairs of the Niran HgPO^ pit have still not been completed, it remains impossible to determine if the HCl pit has "broken through" due to the excess H.3PO4 present. As soon as- repairs to the Niran pit are completed a test will ^be run to determine the present effectiveness of the HCl pit.
DSW 377508
STLCOPCB4099240
POLLUTION CONTROL - continued
Company Confidential 9.
Waste Treatment
All wastes were effectively treated during December. Average daily values for Monsanto's effluent are as follows:
Specifications 5 ppm
200 ppm 1.0 ppm
200 ppm
DSW 377509
STLCOPCB4099241
(
Vs*
PLANT LABORATORIES G. W. Miller
Company Confidential 10.
PROCESS RESEARCH AND DEVELOPMENT J. T. Bell
Of the 110 mandays available to PR&D in December, 67 mandays were expended on projects included in the 1969 PR&D Program. Vacation, supervision, . miscellaneous, and special projects (Aroclor 5460 Acetone Insolubles, preparation of special Aroclor samples) account for the remaining time.
Blend Scavenger Refinement (Aroclor)
Improved Aroclor Electrical Properties
J. L. Brown
Upon receipt of a special order of Type 4A Molecular Sieve, a work plan will be issued outlining a final study for evaluation of this material as an absorbant for refining electrical properties of Aroclor 1242-Phenyl Glycidyl Ether blends.
HB-40 Process Studies
Determine Process Variables
W. H. Howard
The study to develop a continuous HB-40 process has been terminated. The inability to overcome equipment difficulties prevented reaching the original project objectives. A report has been prepared for issuance.
Biphenyl Tubular Pilot Studies
Obtain Desired Biphenyl/Terphenyl Ratio
J. L. Brown
The PR&D Polyphenyl Laboratory is now 98% complete. Installation of the control panels and process line will start 1/2/70 with a tentative installation EDO of 4/1/70.
Low Color Aroclor 5460
Develop Alternate Process
G. L. Arnett
Laboratory work and corrosion studies have been completed. Support will be given for a plant demonstration.
Parathion Condensation Reaction Studies
Increased Yields
I. Ransaw
The evaluation of different catalysts in the condensation reaction has been delayed by difficulties in obtaining the necessary chemicals. The study of solvent effects has been initiated and as a result the overall program is essentially on schedule as indicated by the work plan.
OS'N 151
STLCOPCB4099242
PLANT LABORATORIES
(Cont'd)
/
PROCESS RESEARCH AND DEVELOPMENT
(Cont'd)
Company Confidential 11.
Aroclor 5460 Acetone Insolubles __________
Quality ;G. L. Arnett
The investigation to determine the process controls necessary to prevent the formation of over-chlorinated terphenyls is approximately 907. complete. Additionally, Aroclors 5420, 5425, and 5430 have been prepared in the laboratory for Organic Research.
Muriatic Acid ________ ___________ Quality I. Ransaw_____________________________
The development of a quantitative method for the analysis of trace organics in Muriatic Acid is concentrated on two techniques: scanning UV and gas chromatography, A UV instrument is to be made available by the vendor by January 19 with a critical evaluation scheduled for completion by that date. The completion of the evaluation of the chromatographic method is tentatively set for March 13, based on an assumption of the return of that instrument from the factory in operating condition by February 15.
ANALYTICAL AND QUALITY CONTROL
S. 0. Kemp
Complaint Report
Quality
Number
Material
Customer
Reason
17-A-69 18-A-69 19-A-69
Aroclor 5460 Aroclor 5460 Aroclor 5460
Canada Colors to Swift & Co. Plasti-Kote
Thomas Chemicals
Dark Yellow
Development of a gel in their formulatibn. Whitish Yellow Powder
YTD Quality Complaints/100 Shipments 0.275
Target 0.20
OSIN 377511 STLCOPCB4099243
Company Confidential 12.
COMMUNITY RELATIONS, PERSONNEL, RECRUITING, AND DEVELOPMENT
Community Relations
1. J. C. Landwehr, A. G. Hill and J. C. Price attended the annual meeting of the Coosa-Alabama River Improvement Association, December 17.
2. E. G. Wright attended AIA Air and Water Resources committee meeting in Birmingham, December 11.
3. W. F. Taffee attended AIA Education committee meeting in Birmingham.
4. W.-'F. Taffee attended hearing on establishment of Birmingham Air Quality Control Region, December 17.
Personnel
1. David Dixon, Chemical Engineering Co-Op from Georgia Tech, will start his first quarter of work on January 5 and will report to W. B. Dunlap.
2. George Jeffrey, Chemical Engineering Co-Op from Georgia Tech, will start his first quarter of work on January 5 and will report to J. C. Price.
3. Elton Allen, Drafting Co-Op from Alabama A&M, will start his first quarter of work on January 26 and will report to R. L. Brewer.
Development
1. R. L. Brewer and G. C. Goodwin completed a short course on "Reinforced Concrete Design" taught by J. C. Price. Others completing the course from outside the department were J. 0. House and M. D.- Blair.
2. G. L. Arnett, G. C. Goodwin, W. H. Howard, B. D. Morgan, and G. W. Richey attended Safety Seminar at Holiday Inn, December 9-10 sponsored by Liberty Mutual.
3. J. T. Bell and J. L. Brown visited St. Louis December 11-12 to discuss plans for the Polyphenyl pilot test program.
4. TSD and Lab personnel attended TSD Safety Seminar on Design Safety, Decem ber 16, 1969 held at Alabama Power Company auditorium.
5. Lamar Murphree completed another Olivetti Underwood computer training course in December. TSD graduates were D. A. Self and J. A. Veazey.
Visitors 1. R. S. Yates visited concerning HB-40 Process, December 9-11.
DSW 377512
2. D. B. Hosmer visited December 11-12 to review Organic Division product MIPs and TSD-Lab programs for 1970.
3. W. E. Chandler visited the plant December 4-5 to discuss the 1970 Plant Improvement and Utilities budgets and the 1970 Utilities Cost Improvement Program.
4. V. W. Lepard, Kem-Tech Laboratories - Baton Rouge, La., visited E. G. Wright December 16.
STLCOPCB4099244
DISTRIBUTION OF. TIMS BY TECHNICAL SERVICE Jan." Feb.'Mar. Apr. May June-July Aug. Sept, Oct. Nov. Dec.
STLCOPCB4099245
^iaaj^aaae-m Company Confidentia1
TSD PROJECT SUMMARY
DSW 377514 STLCOPCB4099246
ANALYTICAL SAMPLES
LABORATORY administration
ANALYTICAL MANPOWER
Manpower/sample
$/Manhours
11.00 10.00
9.00 8.00 7.00
7o Total Plant Operating Cost
Overtime %
2.0 1.5 1.0
0.5
j-------- -------- ]--------
1
*----!
L ^
L
-
i
... -........ 1
1
praaa.
l_ i
-- ` - (-- '
1 1
1
a*
1 --n-- rr^ 1 !/ 1 N\l
t- -- *
fc .. .--i. ... :