0A EA~A United Stale$ l"\~~i~~mental f'roteclkm Region 6 Compliance Assurance and Enforcement Division INSPECTION REPORT
Inspection Date(s): Media: Regulatory Program(s)
Company Name: Facility Name: Facility Physical Location:
(city, state, zip code) Mailing address:
(city, state, zip code) County/Parish: Facility Contact:
04/26/2017 Water NPDES- Clean Water Act
Addison, Town of- Trinity River Authority (TRA) Member City
Addison Wastewater Collection System
16801 Westgrove Drive
Addison, Texas 75001
P.O. Box 9010
Addison, Texas 75001
Dallas County
Lisa A. Pyles
[ Dir. Infrastructure and Development Svcs.
lpyles@addisontx.gov
FRS Number: Identification/Permit Number: Media Number: NAICS: SIC:
110010935113 TXU000116 [and served by TRA CRWWS (TX0022802)] N/A 22132 4952
Personnel participating in inspection:
Lisa A. Pyles
Town of Addison
Jason Shroyer
Town of Addison
Jason Sutton Phil Kagarice Marissa Paz Neil Gayden Mike Tillman Damon McElroy Stephanie Meyers
Town of Addison Town of Addison Town of Addison Town of Addison EPA Region 6 (6EN-WM) EPA Region 6 {6EN-WM) EPA Region 6 {6EN-WM)
Dir. Infrastructure and Development Services Asst. Dir. Infrastructure and Development Services Utilities Mgr. Line Maint. Utilities Mgr. Water Quality Management Assistant Environmental Svcs. Official Environmental Scientist Environmental Engineer Life Scientist
972-450-2878
972-450-2849
972-450-2826 972-450-2860 972-450-2818 972-450-2821 214-665-7531 214-665-7159 214-665-6496
EPA Lead Inspector Signature/Date
Supervisor Signature/Date
?b&/4,~
{Inspector name)
(lciNv ;:J;;;: Wtv'---
{Supervisor name}
a?1/;?
Da(e
'()'/It ;07
Date
6ENFORM-019-R7 (2/15/2017)
1
Section I-INTRODUCTION
Town of Addison, Texas Inspection Date 04/26/2017
PURPOSE OF THE INSPECTION
The purpose of the inspection is to examine the Town of Addison's (or Town) sanitary sewer collection system as an element of the EPA's National Sanitary Sewer Overflow (SSO) Initiative to prevent raw sewage from entering streets, rivers, reservoirs, front yards, etc. For further SSO initiative information you may reference the web link: https:l/www.epa.gov/enforcement/water-enforcement. The scope of the inspection is to generally evaluate the municipalities that receive Trinity River Authority (TRA) wastewater treatment services in order to assist in stopping or mitigating unauthorized/unpermitted discharges or SSOs.
EPA Region 6 inspectors arrived at the Town of Addison's Service Center Office at 8:50am on April 26, 2017 for an announced Compliance Evaluation Inspection (CEI). We met with the Town's wastewater utility and stormwater coordination officials listed on the cover sheet above and illustrated by the inspection sign-in sheet (Appendix 2.) We presented our credentials to the group. The purpose of the inspection was broadly explained as a collection system compliance evaluation of areas such as capacity, management, operations, and maintenance (CMOM) and associated SSO mitigation activities; as well as comprehensive SSO reporting according to Texas law. For further CMOM program guidance you may reference the web link: https://www3.epa.gov/npdes/pubs/cmom guide for collection systems. pdf.
The inspection was conducted in accordance with the Clean Water Act (CWA). The Town's collection system is regulated under the:
Texas Water Code (TWC) Texas Administrative Code (TAC) Texas Health and Safety Code Clean Water Act (CWA) Code of Federal Regulations (CFR) Associated CRWWS NPDES General Permit Conditions
Before leaving the facility, an exit briefing was conducted that explained observations, suggestions and areas of concern. This inspection report is based on information supplied by the Town's representatives, observations made by the U.S. EPA inspectors, records and reports maintained by the Town of Addison, the State of Texas, and the U.S. EPA. TCEQ was notified of the inspection, but did not to participate.
FACILITY DESCRIPTION
The Town of Addison's Wastewater Utilities Department and Customer Call Center are located at 16801 Westgrove Drive, Addison, Texas 75001. The Town's wastewater (WW) utility serves over 15,500 residents and approximately 1,126 commercial connections covering approximately 4.5 square miles. The Town's collection system consists of approximately 72 miles of gravity lines, 11ift station, and approximately 1500 manholes. About 70% of the collection system is polyvinyl chloride (PVC), 20% is vitrified clay (VC), with the remainder being a combination of ductile iron (DI) and various other materials. Addison has one lift station, the Kellway lift station, which has a visual alarm on-site and is remotely connected to a Supervisory Control and Data Acquisition (SCADA) system at the Service
2
Town of Addison, Texas Inspection Date 04/26/2017
Center (Appendix 1; photo #1.) The Kellway lift station is equipped with a dedicated 200 kW backup generator for emergency power (Appendix 1; photo #3), which is tested monthly and has preventative maintenance performed quarterly. The Service Center also has a generator with battery back-up to meet any emergency power needs. A duplicate SCADA system is located at the Cellestial Water Supply Pump Station, located at 5510 Cellestial Road. Town staff can also access SCADA from home via laptop computer if required. Further, there is a cascade telemetry system which serves as backup to the Town's SCADA system.
The WW utility operates 24 hours a day, seven days a week. The system is split into 10 different wastewater basins (Appendix 3), over half of Addison's wastewater is routed through its collection system to three TRA trunk lines. Two of the lines, which are metered by TRA, flow through the City of Farmers Branch while the remaining trunk line (Brookhaven), flows directly to TRA. The Town's wastewater is then transmitted to TRA's Central Regional Wastewater Plant (ID: TX0022802) which provides contractual wastewater treatment services. The remainder discharges to the City of Dallas wastewater collection and treatment system.
Section II- OBSERVATIONS
A) Based on the inspection discussions, data analysis, and observations at the time of the inspection:
Management indicated that Addison is now reporting all overflows whether or not they originate from the private side or public side whether or not they enter a storm drain. In the past, only public side overflows were reported. All SSOs are reported on forms required by and in accordance with TCEQ requirements.
Addison has submitted reports for three (3) SSOs in the past three (3) years. In preparation for the inspection, Addison identified two (2) additional SSO reports that had
been completed, but not submitted to the TCEQ. The dates were July 23, 2016 and January 11, 2017. A record keeping error was identified as the reason for the oversight. The reports were promptly submitted to the TCEQ via "Disclosure of Violation" letter dated April26, 2017 (Appendix 4.) Addison indicated it's SSOs have primarily been caused by general contractors boring into sanitary sewer collection lines. Legacy Contracting, dba "Control Specialists" is on standby for the Town of Addison to perform mitigation, disinfection, and any repairs that may be required in response to any SSOs. Control Specialists also maintains all spare parts required to handle electrical or pump emergencies. The Town of Addison does not participate in the TCEQ's Sanitary Sewer Overflow Initiative (SSOi.) Management indicated they were not aware of and not familiar with the program, but interested in learning more about the program. It was noted that the Town received several 'historic' rain events (i.e. roughly greater than a 50-year flood event) in the months of June and July in 2015, but they did not have a significant impact on the collection system. During the inspection, it was noted that Addison is currently performing an overall Sanitary Sewer System Evaluation. Addison's collection system has been completely mapped and integrated into the Geographic
3
Town of Addison, Texas Inspection Date 04/26/2017
Information System (GIS). An inflow and infiltration (1&1) analysis is ongoing and includes smoke testing, dye testing, and
information obtained from routine inspections performed by maintenance crews. Updated information from GIS and the l&I studies will be incorporated into the collection
system Master Plan, once the current Sanitary Sewer Evaluation is completed. Addison maintains a goal of performing preventive maintenance on 3000 linear feet of
sanitary sewer main each month or an overall goal of 36,000 linear feet annually. Approximately 15,000 linear feet of Hot Spots have been identified and are cleaned on a
quarterly basis whether needed or not. However, the Hot Spots have not been mapped in GIS. Utility maintenance staff make daily rounds and perform general maintenance to the
collection system and is responsible for the initial response to any system emergencies. There are no written standard operating procedures (SOPs) for routine operations and maintenance (O&M) activities. Control Specialists, a contractor, is on 24/7 standby to handle any major repair work associated with emergencies. Emergency repairs are funded through an accelerated procurement process. Normal utility operations and capital projects are fully funded by the utility rates. Emergency repairs are paid for out of the operating budget. The Town's fiscal year runs from October to September. Each year the department submits an operations budget that is approved by the Town's Council. Most major rehabilitation projects fall under the capital improvements budget. At the time of the inspection, Addison was working on a 5-year capital improvement plan (CIP). Management is awaiting the findings and recommendations from the current Sanitary Sewer Evaluation, so they can be incorporated into the finalized Master Plan. Expectations are to finalize the CIP by end of the year. Typically, capital expenditure projects are designed by licensed professional engineers and focus on the repair and or replacement of known issues. Training for response, mitigation, and clean-up of SSOs and lockout-tagout procedures are performed in-house (Appendix 5.) Confined space training is handled by an outside contractor. Addison's "Call Center" handles sewer complaints and overflow calls (Appendix 1; photo #2.) Calls are received by a department assistant, who notifies the Utilities Manager by both telephone and email. The manager assigns a WW crew to respond. There are no written SOPs for the Call Center. At the time of the inspection, Addison did not have an automated work order system in place to document sewer calls. Email was the primary means of written documentation. During the inspection, it was also determined that the Town of Addison has no formal asset management program in place. However, FY17 funding has been established to facilitate the development of a comprehensive asset management program.
B) Capacity Management, Operations, and Maintenance Program (CMOM)
Addison does not have a formal CMOM program, but has a number of "Policies and Procedures" in place which incorporate many CMOM components. Addison's Policies and Procedures Manual includes the following:
4
Town of Addison, Texas Inspection Date 04/26/2017
Organizational structure with staffing; Program funding through annual budgets and capital improvement plans; Collection system maintenance equipment including a Closed Circuit TV (CCTV) truck and recent
acquisition of a jet-vac truck; Sewer Use Ordinance with a Fats, oils and grease (FOG) control and grease trap program; Safety and maintenance training programs; Protocols for Identifying SSO's; Routine collection system maintenance program; Hot-spot cleaning program; Manhole/system inspection program; System rehabilitation program and; Lift station maintenance program.
C) Relevant regulatory information:
Failure to prevent unauthorized I unpermitted discharges or Sanitary Sewer Overflows is
stipulated in TAC 305.125(9); TWC 26.121(a); Section 301ofthe CWA; and 40 CFR 122.l(b) corresponding to the "NP DES Permit" General Conditions.
Failure to implement proper O&M of the collection system is stipulated in Title 30 of the TAC 305.125(5) & 40 CFR 122.41(e) corresponding to the "NPDES Permit" General Conditions.
Section Ill -AREAS OF CONCERN
At the time of the inspection, Addison indicated it was determined that (2) SSOs had not been reported to the TCEQ as required. The SSOs were reported in a Disclosure of Violation letter dated April 26, 2017 (Appendix 4.)
Section IV- RECOMMENDATIONS
EPA generally recommends that the Town of Addison:
1. Consider participation in the TCEQ's SSOi program.
2. Regularly review staffing, equipment, and funding levels to ensure wastewater utilities has adequate resources to properly implement an SSO prevention and mitigation program.
3. Continue with GIS mapping efforts incorporating all identified assets and hot spots into the system and map all assets and hot spots on a physical map.
4. Develop written SOPs for the Call Center and all preventive O&M operations. 5. Finalize efforts to adopt and implement an automated work order system for the purpose of
tracking all sewer service calls and response to those calls. 6. Develop and adopt an automated asset management program.
7. Repair I replace damaged security fencing and clear/ remove vegetation away from security
. fencing at the Kellway lift station. 8. Increase inspection/ cleaning frequency of the wet well at the Kellway lift station. At the time of
this inspection, the wet well was in need of cleaning (Appendix 1; photo #4.)
5
Town of Addison, Texas Inspection Date 04/26/2017
9. Increase inspection I degreasing frequency at the Tokyol manhole. At the time of inspection
there was evidence of grease buildup (Appendix 1; photo #7.) 10. As part of the Town's FOG/ Grease Trap programs, expand efforts to inspect liquid wastehauler
grease trap pumping efforts, Trip Tickets and occasional follow up with approved grease trap waste disposal sites. Section V- FOLLOW UP The following information was received by EPA after exiting the Facility on 4/26/17: 1. Marissa Paz, Management Assistant, Town of Addison transmitted the following via email:
April 28, 2017 - Drop Box link to documents to be included with the Town's Policies and Procedures Manual;
May 2, 2017 - Copies of SSO reports for the last 3 years; May 9, 2017 -An update on Addison's development of an automated work order
system and SSO reporting training; May 31, June 6, June 19 and June 20, 2017 - Updates on work being done to the
security fencing at the Kellway Lift Station. Section VI - LIST OF APPENDICES Appendix 1- Photo log/ 12 photos taken 4/26/17 Appendix 2 - Opening conference sign-in sheet Appendix 3 - Town of Addison collection system basin and sanitary sewer system maps Appendix 4 -April 26, 2017 "Disclosure of Violation" letter Appendix 5 - Sanitary Sewer Overflow Response SOP Appendix 6 - Town of Addison SSO Inspection Checklist
6
Town of Addison Inspection Date 04/26/2017
Appendix 1 Photograph Log
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Photograph Log
Photo No . 1
Location : SCADA System, Service Center, 16801 Westgrove Dr., Addison TX
City: Town of Addison Date: 4/26/2017
I County/Parish: Dallas
[ State: Texas
I Time: 10:13 AM
Comments : SCADA system showing the Ke llway lift station. Addison ha s a duplicate SCADA syst em
located at the Ce llestia l Pump Station, 5510 Cellestial Rd.
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Photograph Log
Photo No. 2
Location: Reception I Dispatch, Service Center, 16801 Westgrove Dr., Addison TX
City: Town of Addison
I County/Parish : Dallas
I State: Texas
Date: 4/26/2017
I Time: 10:18 AM
Comments:
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Photograph Log
Photo No. 3
Location: Kellway Lift Station, 4245 Kellway Circle, Addison TX
City: Town of Addison Date: 4/26/2017
I County/Parish: Dallas
I State: Texas
I Time: 10:49 AM
Comments: Backup Diesel Generator with double walled above ground fuel tank, located in the
foreground.
Note: Vegetation was noted growing up and over security fencing on the northeast quadrant.
Vegetation is to be cleared from fencing.
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Photograph Log
Photo No. 4
Location: Kellway Lift Station, 4245 Ke llway Circle, Addison TX
City: Town of Addison
I County/Parish: Dallas
I State: Texas
Date: 4/26/2017
I Tim e: 10:42 AM
Comments: Wet we ll with large amount of debris and some grease floating on top.
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Photograph Log
Photo No. 5
Location : Kellway Lift Station, 4245 Kellway Circle, Addison TX
City: Town of Addison
I County/Parish: Dallas
I State: Texas
Date: 4/26/2017
I Time: 10:54 AM
Comments: Electrical panel with red light/ visual alarm located on top.
.... .. .- - -
a a ltl
a~: &; & I
..
t
-.
...
,,-_,.
( '.
-
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Photograph Log
Photo No. 6
Location : Kellway Lift Station, 4245 Kell way Circle, Addison TX
City: Town of Addison Date: 4/26/2017
I County/Pari sh: Dallas
J State : Texas
I Time: 10:46 AM
Comments: Dry well.
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Photograph Log
Photo No. 7
Location: Tokyo #1 Manhole, Midway@ Belt Line Rd., Addison TX
City: Town of Addison
I County/Parish: Dallas
I State : Texas
Date: 4/26/2017
I Time: 11:11 AM
Comments: Manhole behind restaurant row wh ich is routinely maintained by Town of Addison.
Evidence of grease in line and floor of manhole.
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Photograph Log
Photo No. 8
Location: Atrium Manhole, Midway @ Hornet, Addison TX
City: Town of Addison
I County/Parish: Dallas
I State: Texas
Date: 4/26/2017
J Tim e: 11:23 AM
Comments: Manhole appears to be relatively clean and in good working order.
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Photograph Log
Photo No. 9
Location : Landmark Manhole, Landmark St. south of Belt Line Rd., Add ison TX
City: Town of Addison Date: 4/26/2017
I County/Parish: Dallas
I State: Texas
I Time: 11:39 AM
Comments: Recently rehabbed manhole with epoxy coating. On Landmark, just south of Belt Line, in
the middle of the street, adjacent to Stadiu m Cafe. Manhole appea rs to be well sea led, clean, and in
good working order.
UN ITED STATES ENVIRONMENTAL PROTECTION AGEN CY
Photograph Log
Photo No. 10
Location: Excel Parkway, Addison TX
City: Town of Addison Dat e: 4/26/2017
I County/Parish: Dallas I Time: 1:07 PM
Comments: Jet Vac Truck cleaning line prior to CCTVing.
I State: Texas
UN ITED STATES ENVIRONMENTAL PROTECTIO N AG ENCY
Photograph Log
Photo No. 11
Location : Excel Parkway, Addison TX
City: Town of Addison
I County/Parish: Dallas
Date: 4/26/2017
I Tim e: 1:22 PM
Comments: CCTVing of sewer main .
I State: Texas
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Photograph Log
Photo No. 12
Location: Excel Parkway, Addison TX
City: Town of Add ison
I County/Parish:
Date: 4/26/2017
Dallas
I Time:
1:25 PM
I Stat e: Texas
Comments: CCTV ope rator evaluating cond ition inside of sewer main.
Town of Addison Inspection Date 04/26/2017
Appendix 2 Opening Conference Sign-in Sheet
United States Environmental Protection Agency
Region 6 - Water Enforcement.Branch 1445 Ross Avenue, Suite 1200 Dallas. Texas 75202-2733
DATE: April 26, 2017
TIME: 9:00 AM
SUBJECT OF MEETING: . Town of Addison, SSO Compliance Assurance Project
NPDES No. : TXU000116 (CRWWS: TX0022802)
MEETING ATTENDEES
NAME
COMPANY
PHONE NO.
EMAIL
:S EPA
Town of Addison, Texas Inspection Date 04/26/2017
Appendix 3 Town of Addison Collection System Basin and Sanitary Sewer
System Maps
r.r-----------
, I ... ....... . ........ _ ___ _ _ __ J
- - .- - - .- . - . - - -- - q.-
(
I i
l~//
1
0
BO O
.......-.!
l,600 i fu l
1 Inch = BOOfeel
Legend
O .-.;~~an-..
- t11ut1"1 CcMtltilt 1
D ''"Nn 8m.rM1un D fbU.t. t
O t.uw. omDn1'1
ZMAEUOO.Yt)
0 u.,01M:l;"n.11 lln '" l M AC-"tf:1u IOO-Y1)
D R1n t.'lc C1tt \tl1t1.'\
:Nlll~;tZtA X {1:WY1)
0 &>1Mml AIJ'TJ.4"6u'~ r::.1 ecrmuSt/Aln1
O u11\.li11MB.11\o\ ~u,,.1, 1011r uu111
Qii1hJt R.ot CHt\ 8 1t'rl
Town-Wide Overall Basin Map
Legend
Sanitary Sewer Map
Various Engineering Projects Town ofAddison
Town of Addison, Texas Inspection Date 04/26/2017
Appendix 4 April 26, 2017 "Disclosure of Violation" Letter
April 26, 2017
Tony Walker Texas Commission on Environmental Quality Region 4 Dallas/Fort Worth 2309 Gravel Dr. Fort Worth, TX 76118-6951
Mr. Tony Walker,
During recent training sessions, the Town of Addison became aware that we were not properly reporting all Sanitary Sewer Overflows (SSOs). Town staff thought that a SSO was the city's responsibility only if it originated from Town wastewater mains and entered into a watershed. Therefore, SSOs that originate from private service lines or lines in which the flow does not reach an active stream system, did not have to be reported to TCEQ. However through research, internal discussions, and training, we have become aware that we had been misinterpreting the regulations.
The Town of Addison does not treat its own wastewater. Our wastewater is treated by the City of Dallas and Trinity River Authority (Permit WW20018). We have discovered there have been two SSOs that have not been reported correctly according to the reporting requirements as set forth in Title 30, Texas Administrative Code Section 327.32. This letter is submitted as a "disclosure of violation" (DOV) to notify the Texas Commission on Environmental Quality (TCEQ) that two SSOs were not reported in the monthly written notification to TCEQ. Details of both SSOs are described below and the Water Quality Noncompliance Notifications are also attached for your review.
1 st SSO corrective actions
4011 & 4013 Lindbergh: 4011 Lindbergh property owner called stating they had a backup in their building. Upon investigation Addison found they shared a common private lateral with the building immediately to the east at 4013 Lindbergh. Staff confirmed the ROW limits and took responsibility of the common lateral from 5' outside of roapway. When excavation activities began Staff realized that the existing common lateral was failing and needed to be replaced. Staff then contacted Tri-Dal, who is the emergency contractor the Town uses for utility services, and they removed and replaced the common lateral within 24 hours. No further investigation or action was deemed necessary.
INFRASTRUCTURE & DEVELOPMENT SERVICES
16801 Westgrove Drive Addison, TX 75001
P.O. Box 9010 Addison, TX 75001
phone: 972.450.2880 lax: 972.450.2837
ADDISONTEXAS .NET
IT ALL COMES TOGETHER .
2nd SSO corrective actions
14665 Midway: Street crews noticed water flowing on the curb line at 14665 Midway and notified management. Staff immediately responded and shut off the water supply at the listed address, set up erosion control methods by dispensing litter on the wet areas of the sidewalk and road, and began repairs. The crew was able to clean out the impacted storm drain removing sewage, leaves, and other floatables with the use of a Vacuum truck. When the crew reviewed the surrounding manholes to locate the blockage they discovered the immediate manhole sewer pipe to the east of the building was cracked so they repaired it. The site was restored to its original clean state and no other action was deemed necessary.
In order to warrant proper reporting with these incidences in the future, a central point of contact for a clear chain of command has been established within the department to submit all SSOs within TCEQ regulated time frames.
In addition, the Town is currently working with Teague Nall & Perkins (TNP) to develop a training program that will detail standard operating and reporting procedures for department staff. TNP is the Town's consultant who develops the Small Municipal Separate Storm Sewer System (sMS4) Report. That training will take place in May 2017. As of current, all personnel have been directed to immediately notify their direct supervisor and those supervisors have been directed to notify the Management Assistant and Director of Infrastructure of any SSOs.
As an organization, we strive to educate our employees to avoid mistakes and provide an overall safe work environment. Each of these SSOs were dealt with immediately but not reported appropriately. As stated above, we have implemented new operating procedures and processes to ensure that these errors do not occur in the future. We appreciate your understanding and support.
Please let me know if we can provide any additional information or if you have any questions regarding any information provided herein.
Regards,
Jason Shroyer, P.E. Assistant Director of Infrastructure
INFRASTRUCTURE & DEVELOPMENT SERVICES
16801 Westgrovo Drive Addison, TX 75001
P.O. Box 9010 Addison, TX 75001
phone: 972.450.2880 lax: 972.450.2837
ADDISONTEXAS.NET
IT ALL COMES TOGETHER.
Water Quality Noncompliance Notification
*See back of Form for Guidance for Completion*
1:81 Unauthorized Discharge
D Reportable Effluent Violation
D Other
Entity Name: Town of Addison
181 Permlttee
D Subscriber
TCEQ Region: 4
County: Dallas
Telephone No: (972) 450-2849 *Permit Number: WQ0010060001
Description of Noncompliance (include location, discharge route, and estimated volume of unauthorized discharge): Between 4011 & 4013 Lindbergh Dr., Addison TX 32.957729, -96 .842570. 1000 gallons Into ditch line that was bored across the road for the Installation of the 6 Inch lateral to the main.
Cause of Noncompliance: 6 Inch Cast Iron Sewer lateral failure due to age.
Duration:
Start Date and Time: 7-23-16@ 6pm End Date and Time: 7-24- 16 @ 4pm
Or Date Expected to be Corrected:
Potential Danger to Human Health and Safety or the Environment: yes
I Monitoring Data: Data should be attached or submitted to TCEQ 'when available.
D Yes D Yes D Yes
No Field Measurements No Laboratory Samples
No Fish Kill If yes, estimated number killed:
Actions Taken to Mitigate Adverse Effects: Replaced 6 Inch cast Iron lateral with SOR 35 PVC across entire roadway from ROW to Main. All material excavated for the repair was hauled off by Tri Dal.
Actions Talcen to Correct the Problem and Prevent Recunence: The entire lateral was replaced.
Information Reported By (Name/Title):
Date Reported: 3-9- 17_ _ _ __
Note: If this form Is being used for a 5-day written report, a copy of the form should be sent to the TCEQ Region Office, and the original to: TCEQ, Compliance Monitoring Team (MC224), Enforcement Division,
P.O. Box 13087, Austin, TX 78711-3087.
* If the noncompliance Is an unauthorized discharge from a wastewater collection system, use the permit number of the treatment plant to which the collection system is tied. If you are uncertain of this permit number, you may call the TCEQ Regional Office for assistance.
TCEQ " 00501 {Rev. 09-07-10)
Page 1of2
Water Quality Noncompliance Notification
*See back of Form for Guidance for Completion*
[gl Unauthorized Discharge
D Reportable Effluent Violation
D Other
Entity Name: Town of Addison
t8l Permittee
D Subscrib.er
TCEQ Region: 4
County: Dallas
Telephone No: (972) 450"2849 *Permit Number: WQ0010060001
Description of Noncompliance (include location, discharge route, and estimated volume of unauthorized discharge): 14665 Midway Rd., Addison TX 32.947538, -96.839402. Into storm drain 200 gallons.
Cause of Noncompliance: Cast Iron Sewer lateral failure that passes through a storm drain pipe trunl< line.
Duration:
Start Date and Time: 1-11-17@ 1pm End Date and Time: 1-11-17@ 3pm
Or Date Expected to be Corrected:
Potential Danger to Human Health and Safety or the Environment: yes
Monitol'ing Data: Data should be attached or submitted to TCEQ when available.
0 .Yes
D Yes D Yes
t8l No t8l No t8l No
Field Measurements Laboratory Samples Fish Kill If yes, estimated number killed:
Actions Taken to Mitigate Adverse Effects: Replaced section of lateral cast iron with SDR 35 PVC with repair clamps that day and encapsulated entire crossing of lateral with concrete the following day. During removal and replacement and there after we flushed a hydrant upstream from the Incident at a flow of 400 gpm for approximately 6 hours beginning at 12 noon before we cut the pipe untll new pipe was In place. We continued flushing past time of repair whlle we cleaned up job site.
Actions Taken to Correct the Problem and Prevent Recurrence: We encapsulated lateral until we can get an engineering firm to design a permanent repair due to conflicts In grades between the storm line and the wastewater lateral.
Information Reported By (Name/Title):
Date Reported: 3-8- 17__ _ __
Note: If this form is being used for a S"day written report, a copy of the form should be sent to the TCEQ Region Office, and the original to: TCEQ, Compliance Monitoring Team (MC224), Enforcement Division, P.O. Box 13087, Austin, TX 78711-3087.
TCEQ "00501 (Rev. 09-07-10)
Page 1of2
Town of Addison, Texas Inspection Date 04/26/2017
Appendix 5 Sanitary Sewer Overflow Response SOP
TOWN OF ADDISON
SANITARY SEWER OVERFLOW RESPONSE
S.O.P
TABLE OF CONTENTS
SECTION 1: PURPOSE SECTION 2: SPILL RESPONSE SECTION 3: EMERGENCY TRAFFIC CONTROL SECTION 4: BYPASS SECTION 5: CONTAINMENT SECTION 6: REPORTING AND NOTIFICATION SECTION 7: SIGN POSTING SECTION 8: RESTORATION SECTION 9: DOCUMENTATION
SECTION 1: PURPOSE
The purpose of the Sanitary Sewer Overflow Response Plan is to minimize the impact of sanitary sewer overflows (SSO's) to the public and the environment. All sanitary sewer overflows will be responded to in a timely manner to expedite the necessary steps to relieve the overflow. Relieving the sewage blockage and spill containment will be our highest priority, taking in to consideration public health concerns. This response plan will be the guideline for the standard operating procedures in the event of a sanitary sewer overflow. The response plan will be reviewed periodically to ensure that all corrective measures are being taken.
SECTION 2: SPILL RESPONSE
When the Utility Operator is notified of a potential Sanitary Sewer Overflow during working hours, they will notify the Utilities Manager or the Assistant Director of Infrastructure Services. After hours, the On-Call Operator will notify the Utilities Manager or the Assistant Director of Infrastructure Services of a potential sanitary sewer overflow, the (UM) will notify all other staff members from the Utility Division to assist in the spill response.
i. The crew will respond to the site of the complaint with the proper Spill Response material and the Combo Truck (Gap-Vac). If the problem is identified as an actual spill, it may be necessary to send for additional equipment.
ii. The Utility Manager will assess the problem and assign the response crew job duties in order to eliminate the overflow. The Utility Manager will also inform the Assistant Director of Infrastructure Services of the SSO.
iii. If the problem has escalated to an emergency situation, we will use resources from the entire Infrastructure department such as the Water Quality, Streets, Stormwater, and Traffic Divisions. If the issue has escalated beyond the Town's capability to remedy, an outside contractor will be called in under the emergency procurement process.
Section 3: Emergency Traffic Control
In the event that the spill is located in a high traffic area, the Utility Manager will utilize assistance from the Streets Division. The Utility Manager may also notify Police dispatch for assistance:
Todd Weinheimer - Streets and Stormwater Manager - (972)-489-7370 Juan Gutierrez - Streets Superintendant- (214)-687-2629 Police Dispatch Non-Emergency (972)-450-7156
Section 4: Bypass
If the blockage is not relieved within the first few attempts (20 minutes), it is crucial that the bypass procedures are followed immediately.
i. Locate the nearest downstream manhole that can accept the additional flow. ii. Set up an appropriately sized pump. Please contact the Utilities Manager for
assistance with pump selection. The pump discharge hose should be secured or placed far enough into the manhole that it will not come out during pumping. The pump and pump hose should be protected from traffic by barricades.
Section 5: Containment
Containment is Departments top priority. The Utilities Crew will make every valued effort to keep the SSO in a small area as possible. It is preferred that the crew keeps the SSO in the street and out of storm drains. To make sure the SSO is contained, the Collections Crew will use the following methods:
i. Use soil or other means to keep the overflow from reaching a storm drain. ii. Should the overflow take place in an area not normally accessible to the public,
such as; (fields, tributaries, etc.), the Utilities Crew will use any reasonable means to contain the flow in that area for recovery. iii. Should the flow be too much to be contained on the street and is identified as a danger to the public, the Collections Crew will allow the flow to enter the storm drain or catch basin. The crew will make every reasonable attempt to dam up the spill in the storm drain or catch basin and recover it from that point.
Section 6: Reporting and Notification
All SSO's regardless of size and location must be reported. The Utilities Manager or crew will notify the Infrastructure and Development Services Management Analyst as soon as is practical upon responding to an SSO. The Utilities crews are responsible for response, repair, remediation, flow monitoring, times/dates, etc. This information will be communicated to the Management Analyst. The Management Analyst will provide notification per the following:
i. As soon as is practicable but not greater than 24-hours after becoming aware of an SSO event, notification to the TCEQ local region office in Fort Worth will be made by phone.
ii. Within 5 working days, written notification to both the local region office and to the TCEQ's Enforcement Division in Austin will be made. This notification will be made on the Water Quality Noncompliance Notification form (TCEQ-00501).
iii. In the event that the Management Analyst is unable to provide this documentation, the Utilities Manager or the Assistant Director of Infrastructure Services will assume the responsibility.
Section 7: Posting (if necessary)
Public health and safety is the top priority of the Collections Department and District. We will post the proper signs to warn the public of potential contamination hazards.
i. Posting of contamination signs will be done in all cases whether there is standing water or the ground is saturated.
ii. Signs will be placed in locations with high visibility as so that they can be seen from all routes that the public might take to enter an area.
iii. Signs will remain posted for a period of not less than five days, unless directed by the TCEQ.
Section: 8 Restoration
We will make every effort to restore the environment to the condition that existed before the SSO occurred by using the following procedures:
i. If the SSO occurred in the street, staff will apply a chlorine solution to the affected area and use the nearest fire hydrant to wash down the area, dechlorination if needed and recover wash down water, as much as possible. If the SSO occurred in an unpaved/dirt area staff would apply hydrated lime as needed for odor control and apply class 2 base at a minimum of two inches (2") of coverage.
ii. Collect and dispose of any standing or pooled sewage that is accessible to the public.
iii. Recover any sewage within storm drains, channels, curb, gutters, and culverts. iv. Clear surrounding area of paper, solids, and any other signs of a SSO. v. We will replace vegetation, sidewalks, asphalt, fencing or any other items that
were damaged as a result of the SSO or the crews working to restore service.
Section: 9 Documentation
Documentation shall contain the following information:
i. Beginning and ending time. ii. Exact location of the SSO. 111. Any and all conditions that may have contributed to the cause of the SSO. iv. Potential danger to human health and safety or the environment v. Did the SSO reach surface waters or a storm drain? v1. Total gallons spilled and the amount recovered. vii. Damage that was caused and any repairs that were made. v111. Photographs of the affected area. ix. Any additional information deemed necessary by the Utilities Manager
Town of Addison, Texas Inspection Date 04/26/2017
Appendix 6 Town of Addison SSO Inspection Checklist
EPA
SSO Inspection Checklist
Name of Municipality _T""'""o"""w""n"'-"'of=-A=d"'d""is"'o'"""n=-------------------
Collection System Description
1. Describe the collection system. The Town ofAddison is approximately 4.5 square miles in area. The wastewater system is split into 10 different wastewater basins with more than halfofthe wastewater going to the TRA treatment system and the other to the Dallas Water Utilities treatment system.
2. What is the population of the service area: Number of residents 15,518 Commercial connections 1126 based on water connections Any septic systems? No Ifyes, how many?. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
3. How many miles of sanitary sewer mains are in the collection system? 72
4. What is the age of collection system? 30-50 years
%VC,,,20% %DI"' 5% %PVC"' 70% %Other "' 5%
5. Does the collection system experience problems during dry weather? no Describe or provide documentation:----------------------------
6. Does the collection system experience problems during wet weather? no Describe or provide documentation: There are some localized increase to flows to our lift station during a rain event.
7. What is your sanitaiy sewer overflow (SSO) notification procedure? We currently utilize the TCEQ 's notification process for SSO 's. They require notice to the local region office within 24 hours ofthe SSO. We also provide a written report on form TCEQ- 00501 to the Austin office within 5 days ofthe incident.
What is reported? General information such as name, phone number, TCEQ region, permit number. We provide a description ofthe issue, when it started, when it ended, potential route ofthe discharge, date and time of correction or expected correction, and the potential danger to human health or safety. We describe the corrective actions taken and estimate the amount ofsanitmy sewer discharge.
8. Are all SSOs reported, regardless of size? Yes. Ifno, why not? - - - - - - - - - - - - - - - -
Lift/Pump Stations
I. How many lift stations are in the system? I
How many have backup power sources? All
TRA Regional SSO Con1pliance Evaluation Project
Page 1 of5
VJ July 2016
EPA SSO Inspection Checklist
Describe: Spectrum GA325 200 kW. Generator preventive maintenance occurs quarterly under a contract with Worldwide Power.
2. Describe how pump/lift stations are inspected and monitored? The lift station is inspected every day during the Utility division's operational roimds. The pumps and motors are maintained on a semi-annual basis through an outside contract with Legacy Contracting. The pumps are monitored through the Town's SCADA system. The Town has also embarked on an assessment and masterplan developmentfor the lift station with Garver. That project began in May of2016 and we expect it to be complete in the first quarter of2017.
3. Is a SCADA system used? Yes If so, what parameters are monitored? flow, pump run time, pump hours, levels in the wet well, generator information, gpm during pump runs, alarms Also have telemetly system backup for operation
4. What provisions have been made for emergencies? The Town owns additional pumps, portable generators, sewer equipment such as Combo-Unit (Vac-t1'!1ck with rodding capabilities), portable lights, trailers, etc.
Emergency Power? Yes, generators at the main service facility, the main water pump station, and the lift station. Critical Processes? - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SCADA? Yes, main SCADA computer is at a generatedfacility and is on a batte1y backup. Other?- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5. Describe any automated emergency notification/response process. The SCADA system will call out based on the
current alarm parameters. A representative from the Utility division will receive the call and must respond. If
the SCADA system does not receive a response from the first number it calls, the system will roll to the next number. The alarm will continue until acknowledged. The Utility employee must log onto the SCADA system and assess the situation and respond appropriately. The Town also maintains a service agreementfor 2417 emergency assistance with SCADA related issues with Prime Controls.
Satellite Systems
1. Does the collection system receive flow from satellite systems? No Ifyes, continue with questions 2-4
2. Is flow from satellite systems monitored? _ _ _ _ _ __ lfyes,how? ------------------------------------
3. Describe any known problems with the satellite collection system (hydraulic flow, wastewater concentration, ordinances, etc.)?
4. Who is responsible for satellite systems, enforcement, and response?
Enforcement? ---------------------------------~
Response?_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
TRA Regional SSO Compliance Evaluation Project
Page 2 of5
V3 July20!6
EPA
SSO Inspection Checklist
Performance Indicators
1. Summarize the Capacity, Management, Operations, and Maintenance (CMOM) components utilized by the facility and satellite systems, if applicable: The most recent capacity study peiformed in the Town ofAddison was completed in 1996. The Town is currently in the process ofupdating this iriformation with new data and input from the Sanitary Sewer Evaluation and Master Plan that is currently in progress. The utilities division ofthe Infrastructure and Development Services Department is responsible for the daily management and oversight of the sanitary sewer system. The department consists ofa director, an assistant director who is a licensed professional engineer, two utility managers, and 9 utility operator positions. These positions are responsible for the maintenance and operations ofboth the water and sanitary sewer systems. The department is supported by the engineering inspection group that is responsible for plan review and inspections ofprivate development where they interface with the public infrastructure. The department also houses the development services and environmental divisions who are responsible for private development plan review, private development installation inspections, and restaurant inspections. The Town ofAddison does not treat wastewater and consists ofapproximately 66 miles ofsanitary sewer mains with one lift station. The system is separated into 10 sanitary sewer basins. Those are farther defined by the treatment agencies that receive the flows. The Town currently sends wastewater to the Trinity River Authority and Dallas Water Utilities. The system is currently mapped in GIS and will be updated upon completion ofthe Sanitary Sewer Evaluation and Master Plan. Maintenance staff use a wide variety ofequipment to peiform maintenance ofthe sanita1y sewer system including, truck mounted CCTV unit, jet-rodder, combo unit (Vac-truck with rodding capabilities), backhoe, dump trucks, pick-up trucks, trailers, gas detectors, and other safety related equipment. The Town does not perform construction related activities for sanitmy sewer installation or maintenance. CIP projects are designed by licensedprofessional engineers, bid in accordance with the Town's purchasing guidelines, and then awarded to qualified contractors. The Town maintains oversight and inspection ofall capital improvementprojects. Town staffis responsible for responding to sewer emergencies, although the repair work associated with these types ofevents will most likely be contracted out as well through an acceleratedprocurementprocess. Town staffpe1forms general maintenance to the sanitary sewer system including: CCTV, cleaning, manhole inspections, and lift station inspections and cleaning. All utilities staff, from the mid-level up are required to obtain and maintain both water and wastewater licenses. The Town performs training either through monthly safety meetings or through a contract with a qualified vendor such as TEEX (Texas A&MEngineering Extension Service). While eve1y employee is responsible for their own personal sqfety, each division manager is ultimately responsible for the safety ofthe division. The Town provides all safety equipmentfrom steel-toed boots to sqfety glasses. The SSO reporting process is handled at the managerial level and the Town follows the requirements ofthe TCEQ.
2. Does the utility patticipate in the TCEQ Sanitary Sewer Overflow Initiative (SSOi)? no If yes, please provide the latest SSOi Annual Repmt. Ifno, why not? Was not aware ofthe program
3. What Standard Operational Procedures (SOP) are developed and used?
_X_SCADA?
_X_Valve maintenance?
_ X_Routine Inspections/Maintenance?
_X_FleetManagement?
__Root Control?
_ X_Clean-up?
_X_Lift!Pump Stations?
Other?- - - - - - - - - - - -
4. Has an infiltration & inflow (I/I) analyses or sanita1y system evaluation survey been performed? Jn progress If yes, describe (and provide a copy of any associated reports) in progress _Smoke Testing? Limited smoke testing was pe1fonned in conjunction with the Sanitmy Sewer Evaluation and Master Plan. The results ofthe testing will be available upon completion ofthe plan. _Dye Testing? Dye testing is pe1formed during the locating ofsanitary sewer services. _CCTV? During our routine inspections, our crews are trained to lookfor sources ofl&l
TRA Regional SSO Compliance Evaluation Project
Page3 of5
V3 July2016
EPA
SSO Inspection Checklist
_Peaking Factors?_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Ifno4whynot? _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~
5. Describe the sewer cleaning and inspection goals. The Town's monthly sewer cleaning goal is 3000 L.F. per inonth. Hot Spots? The Town has approximately 15, 000 L.F. ofhot spots that are cleaned on a quarterly basis. Annual Goals? The annual goalfor the Town is to clean 36,000 L.F. ofsanitary sewer main.
6. Describe any training for receiving, documenting, and responding to sewer calls. Discharge Estimates? The Town provides in house trainings for estimating the amount ofdischarge. We accountfor size ofpipe, length oftime thatpipe is discharging, type ofbreak, flow rate. Safety/Confmed Space? The Town contracts the confined space training to a qualifiedfirm. The last comprehensive confined space training occurred in 2014. Lockout/Tagout? The Town provides in house trainings for lockout/tagout procedures. Reporting?_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Treatment/Clean-up? The Town provides in house trainings for the clean-up ofspills. We discuss the
importance ofremoving solids, chlorinating/disinfecting the area, dechlorinating ifnecessary and washing
down the area. Other?- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7. Describe any Asset Management process in place for the collection system. No formal asset managementprocess currently exists for the sanitary sewer system however, the Town does have fimds in the FY17 budget to perform a comprehensive asset management program.
8. Describe the funding status. Utility operations and capitalprojects are fully fimded by the utility rates Emergency Repairs: Emergency repairs are paidfor out ofthe operating budget. The emergency is later
ratified by the Council and a budget amendment can be done ifnecessary.
Operation & Maintenance: The Town budgets on afiscal year cycle, from October to September. Each year the department submits an operations budget that the Council later votes on and approves.
Rehabilitation: Most major rehabilitation projects fall under the capital improvements budget. Rates: The Town uses a tiered rate structure with a minimum bill based on meter classification and total
gallons used. The Town also has a stormwaterfee. Other?_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
9. Describe any fo1mal approach to target areas for Capital Improvement Projects. Our approach for capital projects will be based on the findings and recommendations ofthe finalized master plan. Currently we prioritize and repair/replace known issues.
10. Please provide any other relevant infmmation.
TR.A Regional SSO Compliance Evaluation Project
Page 4 of5
V3 July 2016
EPA SSO Inspection Checklist
CERTIFICATION
I certify under penalty of law that I have examined and am familiar with the information provided and in any enclosed documents, including all attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certify that the statements and information are, to the best of my knowledge and belief, true, accurate, and complete.
TRA Regional SSO Compliance Evaluation Project
Page 5 of5
V3 July 2016