Document 3bv96wR1Zyx51GRoQYQOYkLE
IV I
H. S. J. S. H. A.
D. A. L.
Bergen Harris Hashbarger
Olson Reid
- Hong Kong
G. P. Wlngard D. H. Balkenbush R. G. Barry J. P. Berndt W. T. Dickens A. D. Lapthorne R. 0. Nellums 0. S. Tuygll H. B. Cheney
- Hong Kong
MJL PRELIMINARY BUSINESS PLAN
ORGANIC DIVISION PYDRAUL, SKYDROL
MONS 034020
22T
Entity
Division Group Product
MJL/Japan Organic
Functional Fluids Pvdrai.il
Sa]cs Summary: $ x 1,000(FAS-NY)
ActualProspect
1967
1968
Budget 1969
Pydraul
56 73 189
(Transfer to MMK
-
Forecast
i97Q im Ml
311 -
-
- 400 3,000 }
Business Situation
When the newer Pydraul 312 type fluids became available in 1965, a new service-distribution system was set up with HSK and Matsumura, strongly backed up by MJt and MTS support from St. Louis. The expected market development time lag for testing and qualification has been encountered, and sales growth on a sharply rising curve is now expected.
Troublesome problems delaying acceptance Short-Term are:
1. Delayed development,of compatible accumulator bladders. 2. Marginal stability in certain steel mill applications. 3. Reservations about fire resistance of 312. 4. Preference for fluids in the 200 SSU viscosity range. 5. Suspected chlorinated hydrocarbon toxicity problems.
A new Nihon Accumulator bladder was successful in trials and should bo commercially available soon. Problems 2, 3, and 4 arc being met with a new formulation of Pydraul in the 200 SSU range with greater stability and firc-resistance. The toxicity scare was accelerated by a highly publicized rice bran oil poisoning case wherein the toxicant was traced to contamina tion by Kancka's Kancclor (chlorinated biphenyl).
Longer range, a more serious problem exists in introduction of competitive products, the first being one by Idemitsu Kosan presumably based on Kaneclor. A sample is being
03A0*1 MONS
;zr-/
analysed to check properties and determine if it falls within MC's unissued patent applied for in 1966. It had been planned to turn formulation and sales of Pydraul 312 types
over to MMK in 1971j but competitive local products may force a transfer during 1970.
Timetable and Specific Action
Responsibility
Date
1. Have accumulator bladders available to customers.
MJL (HI)
12/68
2. Start marketing 190-220 SSU fluid.
3. Yearly MTS visits.
MJL (HI) MC (DFS)
MC (DFS)
4/69 Until 1972
4. Assess competitive fluids and
MJL (HI, DTM)
combat with patents if possible.
MC (DFS)
Continuing
5. Evaluate MMK blending plant and schedule start-up.
MMK (JRD) MC (DFS)
12/69
MQNS 034022